Become a Member
  • Track your favourite stocks
  • Create & monitor portfolios
  • Daily portfolio value
Sign Up
Quickpicks
Add shares to your
quickpicks to
display them here!

Trading on the Canadian Securities Exchange

24th Nov 2026 07:00

RNS Number : 3391E
Panther Metals PLC
24 November 2026
 

PANTHER METALS PLC

("Panther" or the "Company")

(Incorporated in the Isle of Man with company number 009753V)

 

24 November 2026

 

Panther Trading on the Canadian Securities Exchange

Panther Metals PLC (LSE: PALM , CSE: PALM), the exploration company focused on mineral projects in Canada, is pleased to announce that its ordinary shares began trading on the Canadian Securities Exchange ("CSE") on Monday 23 November 2026 under the symbol "PALM". Panther has been listed on the Main Market of the London Stock Exchange since January 2020 and will continue to trade there.

Panther lists in Canada with three mineral projects in the province of Ontario, years of exploration work behind it, and a recently closed C$4.16 million (£2.22 million) flow-through financing to fund the next round of drilling.

Darren Hazelwood, Chief Executive Officer commented:

"Listing on the CSE is an important milestone for Panther. We arrive in Canada with three Ontario projects, a solid base of completed work and new Canadian funding in place. Each project offers something different, but our approach is the same: do the work, understand the asset and take the next step towards creating shareholder value. We look forward to introducing Panther to Canadian investors and sharing our progress."

Overview

Obonga Project (flagship): covers about 90% of the 32 km-long Obonga Greenstone Belt, prospective for copper-zinc, nickel-cobalt and gold. Drilling began in 2021 and resumes this winter.

 

Winston Tailings Project: assessing the recovery of gallium, indium, gold, silver, zinc, copper and other metals from the tailings of the former Winston Lake producing mine.

 

Dotted Lake Project: early drilling and testwork confirmed magnesium-rich rock with elevated chromium, nickel and cobalt.

 

Funded: C$4.16 million (£2.22 million) flow-through financing closed in October 2026, mainly for drilling at Obonga.

 

Project Summary

Obonga Project – district-scale exploration

Located about 160 km north-northwest of Thunder Bay, Obonga gives Panther control of most of an entire greenstone belt. In 2026 the Company drilled the Awkward nickel-cobalt target, where the hole hit the targeted intrusive system and showed broad zones of sulphides (announced 2 June 2026), with drilling at Wishbone to test a possible 500 m northern extension of earlier copper-zinc (VMS) sulphide intersections. The reported handheld XRF readings and visual sulphide observations are preliminary and are not a substitute for laboratory assays, which are pending. Drilling paused for wildfire restrictions and the hunting season and will restart this winter.

Winston Tailings Project – metals from historic tailings

The Winston Tailings Project, about 145 km northeast of Thunder Bay, hosts the tailings of the former producing Winston Lake Mine. Sampling in early 2026 returned consistent grades across the tailings (announced 17 March to 13 May 2026). Metallurgical recovery testwork by Extrakt and TDI Solutions LLC is underway, with SRK Exploration Ltd. retained to state a NI 43-101 compliant Mineral Resource estimate. The Company also holds a non-binding letter of interest with commodity trader Traxys Europe SA (announced 19 February 2026). No resource estimate or economic study has yet been completed, so it is not yet known whether metal recovery will be viable.

Dotted Lake Project – magnesium and critical minerals

The Dotted Lake Project covers 36.9 km² about 16 km north of Barrick Gold's Hemlo Gold Mine (mentioned for location only; nearby mineralisation does not indicate what may be found at Dotted Lake). Phase 1 testwork confirmed a magnesium-rich feedstock with elevated chromium, nickel and cobalt (announced 17 August 2026). Next steps are being evaluated.

The Obonga and Winston projects are held under option agreements; Dotted Lake is 100% owned.

 

Funding

Panther had £1.22 million in cash at 30 September 2026. On 14 October 2026 it raised a further C$4.16 million (£2.22 million) through a flow-through placement, which must be spent on qualifying Canadian exploration, principally at Obonga. Panther is pre-revenue and will need to raise further funds to advance its projects; its interim financial statements note a related going concern material uncertainty. Full details are in the Company's Q3 2026 financial statements and MD&A on SEDAR+.

 

Planned Milestones

Restart drilling at Obonga this winter and report laboratory assays.Receive Winston tailings metallurgical results and progress towards a Mineral Resource estimate.Decide on next steps at Dotted Lake.

 

For further information, please contact:

Panther Metals PLC:

Darren Hazelwood, Chief Executive Officer:

+44 (0)1462 429 743 

+44 (0)7971 957 685

 

Brokers:

 

Optiva Securities Limited

Christian Dennis

Mick McNamara

+44 (0)20 3137 1902

Hybridan LLP

Claire Louise Noyce

+44 (0)20 3764 2341

 

SI Capital Limited

Nick Emerson 

+44 (0)1438 416 500

 

Qualified Person

The technical information in this news release has been reviewed and approved by Nicholas O'Reilly MIMMM (QMR) MAusIMM MSc DIC, Executive Chairman of Panther and a Qualified Person under National Instrument 43-101 – Standards of Disclosure for Mineral Projects, who has over 20 years' experience in mining and exploration. Mr. O'Reilly is not independent of the Company.

Forward-Looking Information

This news release contains forward-looking information under applicable Canadian and UK securities laws, including statements about drilling, assay and testwork results, resource estimation, permitting, funding and project development. It is based on assumptions management considers reasonable, including timely access, permits, contractors and financing, but involves risks that could cause actual results to differ materially, including that exploration does not find economic mineralisation, results differ from preliminary observations, permits or funding are not obtained, and no project reaches production. Further risks are described in the Company's filings on SEDAR+. Readers should not place undue reliance on forward-looking information, and the Company does not undertake to update it except as required by law.

The CSE has neither approved nor disapproved the contents of this news release and accepts no responsibility for its adequacy or accuracy.

 

This information is provided by Reach, the non-regulatory press release distribution service of RNS, part of the London Stock Exchange. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact [email protected] or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
NRAUOOKRNUUAUAA

Related Shares:

Panther Metals
FTSE 100 Latest
Value10,698.81
Change89.51