Become a Member
  • Track your favourite stocks
  • Create & monitor portfolios
  • Daily portfolio value
Sign Up
Quickpicks
Add shares to your
quickpicks to
display them here!

Preliminary Results Confirm 74% Copper Recovery

17th Nov 2026 07:00

RNS Number : 3912D
Critical Metals PLC
16 November 2026
 

 

 

REGULATORY NEWS ANNOUNCEMENT

Critical Metals plc | LSE: CRTM | Main Market | LEI: 213800MU3B7CS88PY290

 

 

Exploration and Stockpile Assessment Update

Preliminary Results Confirm 74% Copper Recovery

 

LONDON, 17 November 2026 – Critical Metals plc (LSE: CRTM),  a mining company established to acquire mining opportunities in the critical and strategic metals sector, is pleased to announce the completion of its Acid-Soluble Copper (Preliminary Test Programme at the Molulu Copper/Cobalt Project (“Molulu”). The programme confirmed 74% copper recovery from stockpile and supports further exploration and studies to develop Molulu.  

 

The Company’s collaboration with a potential offtake partner to test a total of Circa. 300 kilograms (kg) of ore from existing stockpiles, blended to form a head grade of 1.43% Total Copper (TCu).

 

KEY PROGRAMME HIGHLIGHTS & OBJECTIVES

 

Metallurgical Domain Mapping: Defines the boundary between oxide, transition, and primary sulfide zones within a deposit to guide block modelling and mine planning.

Process Route Selection: Determines whether ore is amenable to hydrometallurgical processing (Heap Leach / Solvent Extraction–Electrowinning, or SX-EW) versus conventional froth flotation.

Recovery Forecasting: Establishes the Acid-Soluble Ratio (), a critical metric for predicting heap leach recovery rates and estimating acid consumption per tonne of ore.

Grade Control & Blending: Provides rapid turn-around data during production to optimize leach pad stacking and prevent high-gangue or refractory material from diluting leach kinetics.

Key Results

 

Lab Ref

Total Cu %

Acid Cons.

Leaching %

3562

1.43%

3.91

74.13%

Interpretation

Sample 3562

Copper grade: 1.43%

Copper recovery: 74.13%

Acid consumption: 3.91

These preliminary results are very encouraging, as they confirm that 74% of the TCu is recoverable and justify further exploration and studies to develop the Molulu Asset.

 

 

MANAGEMENT COMMENT

Danilo Lange, Chief Executive Officer of Critical Metals, said:

“This programme set out to show whether we could extract enough copper from the stockpiled material at Molulu, and at 74% it has done just that. The fact that this work was carried out with a potential offtake partner is, in our view, an encouraging sign of the Projects’ potential and supports the next phase of exploration. However, we are mindful that these are early-stage preliminary results and that further testwork and studies will be required to validate the full potential of Molulu and its stockpiles. We look forward to providing further updates in due course.”

 

Acid-Soluble Copper Programme Background

An Acid-Soluble Copper () Test Programme is an analytical geochemical and metallurgical testing protocol designed to quantify the portion of copper within an ore sample that readily dissolves in a weak acid solution (typically dilute sulfuric or citric acid).

This test distinguishes easily leachable oxide and secondary copper minerals (such as malachite, azurite, chrysocolla, and chalcocite) from refractory primary sulfide minerals (like chalcopyrite and bornite) that require smelting or bio-leaching.

 NEXT STEPS

Engage further with the potential off-taker Continue with the current exploration programContinue with the Exploration Target 3D Block modelling completed based on historical data and the current quality assurance and quality control (QA/QC) program Prepare an extraction schedule for the exploration target Independent third-party reviewIdentify further Priority targetsUndertake follow-up drilling to understand the mineralisation extension Update block modelling

 

**ENDS**

 For further information on the Company, please visit www.criticalmetals.co.uk or contact:  

 

Critical Metals plc

Danilo Lange, CEO

 

[email protected]

St Brides Partners Ltd

Financial PR

Ana Ribeiro/Charlotte Page

 

 

 

[email protected]

 

Notes to Editors

Critical Metals plc is a mining company focused on acquiring and developing brownfield opportunities in the critical and strategic metals sector. The Company operates the Molulu copper/cobalt project, an ex-producing mine located in the Katanga Copperbelt, Democratic Republic of Congo. It holds a 70% interest in the Molulu Project, with DRC-based partners holding the remaining 30%.

 The Company is majority owned by NIU Invest SE, a Europe and US-based investment company headed by Austrian investor Cevdet Caner, which holds a 52.07% stake in Critical Metals. NIU is focused on becoming a fully integrated mining investor and operator with assets across North America, Latin America, Africa, and Europe.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact [email protected] or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDBCBDBRSBDGLL

Related Shares:

Critical Metals
FTSE 100 Latest
Value10,641.28
Change-48.59