Become a Member
  • Track your favourite stocks
  • Create & monitor portfolios
  • Daily portfolio value
Sign Up
Quickpicks
Add shares to your
quickpicks to
display them here!

Final Stage 1 Drill Results from Lithium Ridge

24th Nov 2026 07:00

RNS Number : 3405E
Andrada Mining Limited
24 November 2026
 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR) as in force in the United Kingdom pursuant to the European Union (Withdrawal) Act 2018. Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information will be in the public domain.

Andrada Mining Limited

("Andrada" or the "Company")

Final Stage 1 Drill Results from Lithium Ridge

Sixth and final assay batch completes the 143-hole Stage 1 programme, confirming multiple, stacked pegmatites extending to 300 metres depth

Andrada Mining Limited (AIM: ATM, OTCQB: ATMTF), a tin producer with a portfolio of critical minerals mining and exploration assets in Namibia, is pleased to announce the final batch of assay results from the Stage 1 Diamond Drilling ("DD") programme at the Lithium Ridge Project ("LR" or the "Project"), located on Mining Licence ML133.

This final batch comprises assay results from the remaining oriented diamond drill holes, formally concluding all analysis reporting for the expanded 16,525 metre (143-hole) Stage 1 drilling campaign executed under a strategic earn-in partnership with SQM International (Pty) Ltd ("SQM"), one of the world’s leading lithium producers. The results confirm wide, high-grade lithium-bearing pegmatite intersections from near surface down to depths of nearly 300 metres, alongside pervasive tin (Sn) and tantalum (Ta) mineralisation. The potential production of multiple revenue-generating commodities will enhance overall project economics and improve the effective cost position of the operation, albeit subject to further metallurgical testwork and economic evaluation.

HIGHLIGHTS

Stage 1 drilling campaign complete: Receipt of the final drill results concludes all analysis reporting for the 143 hole, 16,525 metre SQM funded, Stage 1 programme, establishing a comprehensive technical dataset to support further development of this asset.

Significant lithium mineralisation within multiple drill holes, including:

− Drill hole LRD049: 15.94 m at 2.20% Li₂O, 0.16% Sn, and 75 ppm Ta from 57.26 m to 73.20 m

Including 2.96 m at 3.07% Li₂O, 0.05% Sn, and 41 ppm Ta from 57.77 m to 60.73 m

− Drill hole LRD124: 32.07 m at 1.02% Li₂O, 0.13% Sn, and 53 ppm Ta from 137.24 m to 169.31 m

Including 5.01 m at 1.70% Li₂O, 0.17% Sn, and 61 ppm Ta from 137.49 m to 142.50 m

− Drill hole LRD126: 24.17 m at 1.30% Li₂O, 0.08% Sn, and 28 ppm Ta from 264.58 m to 288.75 m

Including 8.00 m at 1.67% Li₂O, 0.08% Sn, and 20 ppm Ta from 268.85 m to 276.85 m

− Drill hole LRD047: 27.19 m at 1.08% Li₂O, 0.15% Sn, and 58 ppm Ta from 17.57 m to 44.76 m

Including 3.94 m at 1.41% Li₂O, 0.12% Sn, and 55 ppm Ta from 21.82 m to 25.76 m

Depth continuity extended: Deep drill intersections confirm that the pegmatite system remains robust, and open at depth.

Stacked pegmatite geometry: Multiple holes intersected stacked, sub-parallel mineralised pegmatites, supporting the potential for bulk open pit development in the upper levels.

Polymetallic mineralisation: Consistent tin and tantalum mineralisation present across the licence, with standout localised intervals including 0.53 m at 1.41% Sn and 374 ppm Ta (LRD052), 2.06 m at 0.79% Sn (LRD089), 2.56 m at 768 ppm Ta (LRD106), and 3.12 m at 594 ppm Ta (LRD048).

Anthony Viljoen, Chief Executive Officer, commented:

“The release of the final batch of Stage 1 drill results marks a defining milestone for the Lithium Ridge project and our strategic partnership with SQM. Across 143 diamond drill holes comprising over 16,500 metres of core, our exploration team has been able to demonstrate the scale, grade, and structural continuity of a mineralised pegmatite system that extends for some 9km along strike.

These final assays close out the drilling campaign on a high note delivering shallow, high-grade lithium intersections, while simultaneously proving that wide, well-mineralised pegmatites, some exceeding 30 metres in apparent width, persist to depths approaching 300 metres. Equally compelling is the persistent tin and tantalum mineralisation across the licence. Leveraging Andrada's established operational and metallurgical expertise from our nearby Uis Mine, the potential to produce multiple critical minerals from a single operation could significantly enhance future project economics.”

Project Location and Context

The Lithium Ridge Project is situated within Mining Licence ML133, approximately 35 km southeast of Andrada's flagship Uis Mine, and connected by road to the B2 highway in the Erongo Region of Namibia. The licence lies within the NaiNais - Kohero pegmatite belt and encompasses the historical TinTan mine. The asset is held by Grace Simba Investments (Pty) Ltd (“GSI”) and is being advanced through a three-stage earn-in agreement with SQM. Under Stage 1, SQM has funded US$7 million in exploration expenditure to earn an initial 30% interest in GSI and is overseen by a Joint Development Committee with equal representation from Andrada and SQM.

 

RESULTS Overview

The Stage 1 diamond drilling campaign was originally planned ​to be 14,000 metres subsequently expanded by 18% to 16,525 metres across 143 oriented diamond drill holes to test down-dip continuity, structural thickening, and newly mapped parallel pegmatites beyond the main ridgeline. This final batch of drill results reports mineralised pegmatite intersections from 59 drill holes. The highest-grade reported lithium sub-interval is 2.96 m at 3.07% Li₂O within a 15.94 m at 2.20% Li₂O intersection in LRD049, while other significant lithium intersections include 32.19 m at 0.92% Li₂O in LRD113 and 32.07 m at 1.02% Li₂O in LRD124.

Constraining the spatial limits of the mineralised pegmatite swarm provides essential geological control for ongoing exploration targeting and resource modelling. Seven drill holes, LRD075, LRD110, LRD121, LRD125, LRD132, LRD137, and LRD141 either did not intersect significant pegmatite lithologies or returned intervals below the Company's minimum reporting criteria of at least one of the following: >0.25% Li₂O, >0.1% Sn, >99 ppm Ta. These peripheral intersections define the structural and lithological margins of the mineralised zone, enabling the technical team to refine the 3D geological model and strengthen geological confidence.

Reporting Methodology

The holes were drilled at inclined angles to the horizontal (-45° to -90°) and, accordingly, the reported intersections are considered to represent apparent widths rather than true thicknesses. Downhole orientation surveys were conducted using a magnetic deviation probe, with readings collected at two-metre intervals as drilling progressed. Each hole was surveyed in full following completion of drilling. Drill collar locations were surveyed using a handheld GPS.

Intercepts of mineralised pegmatites within the holes are reported as "Whole Intersections" in Table 1 and Appendix 1, representing the pegmatite intersection from the upper to the lower contact. Where these intersections contain schistose xenoliths, the reported grades reflect the metal content of the pegmatite only and exclude the schistose intervals. Intersections reported as "Including" represent selected higher-grade zones within the total pegmatite intersection and are not additional intervals. No top cut was applied when calculating the reported weighted average grades for mineralised intersections within the pegmatites.

Sampling and Analysis

Drill holes were collared at inclined angles to intersect the pegmatite bodies as close to perpendicular as practicable. Drill core was geologically, structurally, and geotechnically logged, cut into quarter-core samples, and dispatched to certified independent preparation and analytical laboratories.

Sample preparation was undertaken by SA Labs Ithuba, with chemical analyses performed by UIS Analytical Services. Lithium and major elements were analysed using sodium peroxide fusion followed by an ICP-OES finish, while tin, tantalum, and trace elements were analysed using lithium borate fusion followed by an ICP-MS finish. Comprehensive QA/QC protocols, including the use of blanks, duplicates, and certified reference materials, were maintained throughout the drilling, sampling, and analytical programmes. Table 1 below presents selected significant intersections. The appendix at the end of this announcement contains the full analytical schedule for all 59 drill holes.

Table 1: Selected results for mineralised pegmatites with the intersection depths, lengths and grades reported. Intersections described as 'Including' refer to a portion of the whole pegmatite intersection with significant metal values. The reported intersections are indicative of apparent thickness, which is greater than true thickness.

Hole ID

Dip Angle (Degrees)

Intersection Type

From - To (metres)

Length (metres)

Grade

Li₂O (%)

Sn (%)

Ta (ppm)

LRD047

-60

Whole Intersection

17.57–44.76

27.19

1.08

0.15

58

Including

21.82–25.76

3.94

1.41

0.12

55

LRD048

-60

Whole Intersection

16.24–19.36

3.12

0.28

0.11

594

LRD049

-55

Whole Intersection

57.26–73.20

15.94

2.20

0.16

75

Including

57.77–60.73

2.96

3.07

0.05

41

Whole Intersection

93.28–96.58

3.30

1.56

0.05

51

LRD051

-60

Whole Intersection

14.50–15.55

1.05

0.08

0.05

636

LRD052

-50

Whole Intersection

12.76–13.29

0.53

0.27

1.41

374

Whole Intersection

74.22–77.89

3.67

0.87

0.41

136

Whole Intersection

162.56–170.57

8.01

1.11

0.13

21

Including

162.56–164.22

1.66

1.79

0.03

24

LRD089

-45

Whole Intersection

141.06–144.25

3.19

1.14

0.09

41

Whole Intersection

148.04–151.37

3.33

1.13

0.14

132

Including

148.51–150.26

1.75

1.70

0.08

107

Whole Intersection

166.79–168.85

2.06

0.33

0.79

127

LRD092

-60

Whole Intersection

121.56–125.43

3.87

1.47

0.14

102

Whole Intersection

130.38–142.03

11.65

1.43

0.08

34

Including

130.81–137.14

6.33

1.88

0.09

22

LRD106

-50

Whole Intersection

32.82–35.38

2.56

0.04

0.06

768

Whole Intersection

89.39–92.19

2.80

1.22

0.12

84

Whole Intersection

94.82–97.52

2.70

1.43

0.12

50

Whole Intersection

100.48–107.28

6.80

1.78

0.10

44

Including

102.38–105.38

3.00

2.32

0.10

52

LRD113

-60

Whole Intersection

256.47–288.66

32.19

0.92

0.13

90

Including

257.63–262.34

4.71

1.58

0.15

144

LRD119

-60

Whole Intersection

165.30–175.65

10.35

1.13

0.10

55

Including

166.79–173.35

6.56

1.31

0.07

38

Whole Intersection

186.87–206.02

19.15

1.09

0.11

51

Including

195.73–202.42

6.69

1.37

0.10

37

LRD124

-60

Whole Intersection

137.24–169.31

32.07

1.02

0.13

53

Including

137.49–142.50

5.01

1.70

0.17

61

LRD126

-60

Whole Intersection

184.45–203.86

19.41

0.74

0.06

34

Including

185.45–188.45

3.00

1.54

0.04

33

Whole Intersection

264.58–288.75

24.17

1.30

0.08

28

Including

268.85–276.85

8.00

1.67

0.08

20

LRD129

-45

Whole Intersection

10.51–15.00

4.49

1.18

0.16

123

Including

11.51–14.51

3.00

1.68

0.16

89

LRD135

-45

Whole Intersection

18.95–35.86

16.91

0.74

0.14

120

Including

19.95–22.95

3.00

1.71

0.13

118

LRD138

-45

Whole Intersection

13.58–22.49

8.91

0.61

0.10

80

Including

18.50–19.50

1.00

2.17

0.02

70

LRD142

-90

Whole Intersection

41.75–47.34

5.59

0.78

0.27

381

Figure 1: Locations of the current and historically completed drill holes. The diamond drill holes are from this campaign (purple) and the reverse circulation drill holes (green triangles) were completed during the 2023 campaign. The line A-A’ represents the cross section in Figure 2 below.

 

Figure 2: Section line A-A' displaying a projection of the diamond drill holes, LRD010 and LRD092. Selected mineralised intersections from LRD092 are reported in Table 1, with the intersections for LRD010 having been reported previously.

CompetenT Person

The technical data in this announcement has been reviewed by Professor Laurence Robb ("Prof. Robb"). Prof. Robb has over 30 years industry-related exploration and economic geology experience and is a Competent Person for the reporting of exploration results. He has reviewed both the technical disclosures in this release as well as the QA/QC protocols and results for this programme.

Glossary of abbreviations

%

Symbol for percentage

DD

Diamond Drill

GPS

Global Positioning System

ICP-MS

Inductively Coupled Plasma-Mass Spectrometry

ICP-OES

Inductively Coupled Plasma-Optical Emission Spectrometry

Li

Symbol for lithium

Li → Li₂O

Metal to metal-oxide conversion factor of 2.153

Li₂O

Lithium oxide

PPM

Parts Per Million

QA/QC

Quality Assurance / Quality Control

Sn

Symbol for tin

Ta

Symbol for tantalum

Glossary of technical Terms

Apparent thickness

The relationship between apparent width and true thickness is based on the formula by Addie (1968 Economic Geology, vol 63, pp 188-189).

Dip angle

The angle of inclination measured downward from horizontal.

Geological model

The interpretation of mineralisation and geology that controls the shape of the mineralised unit. This is usually generated in a three-dimensional computer environment.

Pegmatite

An igneous rock typically of granitic composition, which is distinguished from other igneous rocks by the extremely coarse size of its crystals, or by an abundance of crystals with skeletal, graphic, or other strongly directional growth habits, or by a prominent spatial zonation of mineral assemblages.

Xenolith

A foreign rock fragment (e.g., schist) within an intrusive body (e.g., pegmatite) that is unrelated to the igneous body.

 

CONTACTS

Andrada Mining Limited

Anthony Viljoen, CEO

Sakhile Ndlovu, Head of Investor Relations

+27 (11) 268 6555

NOMINATED ADVISOR & BROKER

 

Zeus Capital Limited

Katy Mitchell

Andrew de Andrade

Harry Ansell

+44 (0) 20 2382 9500

CORPORATE BROKER & ADVISOR

 

H&P Advisory Limited

Andrew Chubb

Matt Hasson

+44 (0) 20 7907 8500

VSA Capital

Andrew Monk

Brian Wong

 

+44 (0) 20 3005 5000

FINANCIAL PUBLIC RELATIONS

 

Tavistock

Emily Moss

Abigail Gilchrist

 

+44 (0) 207 920 3150

[email protected]

 

 

About Andrada Mining Limited

Andrada Mining Limited, listed on the London Stock Exchange's AIM market, is a tin producer with a portfolio of critical metal mining and exploration assets in Namibia, a premier investment destination in Africa. The Company's strategy focuses on unlocking Namibia's abundant mineral resources through best-in-class strategic partnerships across its resource base. Andrada has evolved from a tin producer into a diversified critical minerals company with three distinct but complementary value creation assets, namely Uis, the producing foundation of the Company, Lithium Ridge, a significant lithium opportunity being advanced with SQM, and Brandberg West, a historically producing tin and tungsten asset with significant tungsten, tin and copper potential being developed in partnership with BWCAM (Pty) Ltd. Across the portfolio, Andrada has exposure to tin, lithium, tungsten, copper and tantalum, critical metals that are becoming increasingly important to global energy security, advanced technology, artificial intelligence infrastructure, electrification and defence

 

APPENDIX 1: COMPLETE BATCH 6 ASSAY RESULTS

Hole ID

Dip (°)

Intersection Type

From–To (m)

Length (m)

Li₂O (%)

Sn (%)

Ta (ppm)

LRD047

-60

Whole Intersection

17.57–44.76

27.19

1.08

0.15

58

Including

21.82–25.76

3.94

1.41

0.12

55

Whole Intersection

121.00–124.17

3.17

0.13

0.17

42

LRD048

-60

Whole Intersection

16.24–19.36

3.12

0.28

0.11

594

LRD049

-55

Whole Intersection

35.80–36.05

0.25

0.04

0.03

100

Whole Intersection

51.51–52.32

0.81

0.16

0.10

164

Whole Intersection

57.26–73.20

15.94

2.20

0.16

75

Including

57.77–60.73

2.96

3.07

0.05

41

Whole Intersection

75.13–76.45

1.32

0.29

0.20

224

Whole Intersection

92.49–92.74

0.25

0.22

0.11

69

Whole Intersection

93.28–96.58

3.30

1.56

0.05

51

Whole Intersection

117.80–119.17

1.37

0.59

0.13

93

LRD050

-60

Whole Intersection

19.09–21.26

2.17

0.17

0.02

127

LRD051

-60

Whole Intersection

14.50–15.55

1.05

0.08

0.05

636

Whole Intersection

21.64–22.36

0.72

0.41

0.21

540

Whole Intersection

22.86–23.25

0.39

0.21

0.07

609

Whole Intersection

24.11–24.58

0.47

0.19

0.01

307

LRD052

-50

Whole Intersection

7.23–7.48

0.25

0.13

0.03

79

Whole Intersection

12.76–13.29

0.53

0.27

1.41

374

Whole Intersection

15.55–17.08

1.53

0.49

0.44

170

Whole Intersection

71.73–73.75

2.02

0.41

0.22

75

Whole Intersection

74.22–77.89

3.67

0.87

0.41

136

Whole Intersection

159.91–161.23

1.32

0.36

0.12

147

Whole Intersection

162.56–170.57

8.01

1.11

0.13

21

Including

162.56–164.22

1.66

1.79

0.03

24

Whole Intersection

170.91–171.67

0.76

0.36

0.18

28

Whole Intersection

172.76–173.41

0.65

0.23

0.11

122

LRD053

-60

Whole Intersection

30.96–31.53

0.57

0.02

0.06

495

LRD062

-60

Whole Intersection

11.39–11.64

0.25

0.23

0.19

50

Whole Intersection

12.26–15.52

3.26

0.29

0.38

111

Whole Intersection

28.01–28.55

0.54

0.01

0.09

110

LRD071

-45

Whole Intersection

11.92–13.96

2.04

0.16

0.09

131

Whole Intersection

30.35–31.97

1.62

0.24

0.10

63

LRD078

-55

Whole Intersection

112.76–113.33

0.57

0.11

0.21

291

Whole Intersection

116.18–116.43

0.25

0.05

0.09

243

Whole Intersection

117.13–117.38

0.25

0.20

0.05

100

Whole Intersection

122.03–124.31

2.28

0.93

0.12

137

Whole Intersection

125.77–127.83

2.06

0.70

0.09

132

Whole Intersection

129.74–132.38

2.64

0.70

0.13

130

Whole Intersection

133.13–133.43

0.30

0.05

0.09

151

Whole Intersection

136.27–136.52

0.25

0.48

0.01

2

Whole Intersection

138.17–138.49

0.32

0.03

0.06

316

Whole Intersection

139.45–139.77

0.32

0.14

0.15

109

Whole Intersection

140.74–140.99

0.25

0.06

0.02

257

Whole Intersection

167.86–168.16

0.30

0.02

0.02

329

Whole Intersection

176.68–177.29

0.61

0.03

0.12

82

Whole Intersection

215.05–215.30

0.25

0.03

0.19

90

Whole Intersection

219.34–219.83

0.49

0.06

0.23

130

Whole Intersection

223.80–224.28

0.48

0.04

0.19

86

LRD079

-50

Whole Intersection

15.03–17.54

2.51

0.05

0.20

66

Whole Intersection

38.48–48.18

9.70

0.34

0.07

67

LRD081

-55

Whole Intersection

2.00–2.25

0.25

0.02

0.09

134

LRD085

-45

Whole Intersection

14.00–16.19

2.19

0.21

0.13

210

Whole Intersection

61.55–62.75

1.20

0.27

0.15

67

Whole Intersection

90.78–94.95

4.17

0.80

0.07

96

Whole Intersection

154.18–155.04

0.86

0.17

0.18

143

LRD086

-60

Whole Intersection

33.82–34.81

0.99

0.04

0.13

79

LRD087

-60

Whole Intersection

6.43–8.87

2.44

0.03

0.10

45

Whole Intersection

23.92–24.71

0.79

0.03

0.26

45

Whole Intersection

28.48–28.92

0.44

0.04

0.12

87

LRD088

-45

Whole Intersection

84.97–91.80

6.83

0.42

0.10

132

Including

89.67–90.46

0.79

1.61

0.02

80

LRD089

-45

Whole Intersection

5.76–7.15

1.39

0.04

0.17

74

Whole Intersection

141.06–144.25

3.19

1.14

0.09

41

Whole Intersection

148.04–151.37

3.33

1.13

0.14

132

Including

148.51–150.26

1.75

1.70

0.08

107

Whole Intersection

163.60–164.38

0.78

0.40

0.22

136

Whole Intersection

166.79–168.85

2.06

0.33

0.79

127

Whole Intersection

175.34–176.47

1.13

0.43

0.10

63

LRD090

-60

Whole Intersection

29.61–33.99

4.38

0.09

0.25

52

LRD091

-50

Whole Intersection

22.38–24.43

2.05

0.12

0.19

57

Whole Intersection

42.03–42.92

0.89

0.26

0.03

34

Whole Intersection

44.07–44.40

0.33

0.09

0.11

36

Whole Intersection

49.20–49.64

0.44

0.03

0.14

68

LRD092

-60

Whole Intersection

59.87–60.12

0.25

0.04

0.04

174

Whole Intersection

66.87–67.78

0.91

0.11

0.16

90

Whole Intersection

78.81–79.06

0.25

0.03

0.45

298

Whole Intersection

97.93–98.71

0.78

0.10

0.32

127

Whole Intersection

100.01–100.97

0.96

0.20

0.08

137

Whole Intersection

119.56–120.53

0.97

0.31

0.17

117

Whole Intersection

121.56–125.43

3.87

1.47

0.14

102

Whole Intersection

127.71–128.38

0.67

0.54

0.16

129

Whole Intersection

128.75–129.75

1.00

0.09

0.13

92

Whole Intersection

130.38–142.03

11.65

1.43

0.08

34

Including

130.81–137.14

6.33

1.88

0.09

22

LRD094

-45

Whole Intersection

49.74–51.25

1.51

0.34

0.40

165

Whole Intersection

89.04–89.29

0.25

0.06

0.11

67

Whole Intersection

149.59–150.37

0.78

0.15

0.11

183

Whole Intersection

164.37–165.26

0.89

0.17

0.21

87

Whole Intersection

238.35–239.51

1.16

0.15

0.11

69

LRD096

-50

Whole Intersection

5.50–6.98

1.48

0.12

0.06

128

LRD098

-45

Whole Intersection

36.07–36.46

0.39

0.05

0.06

109

Whole Intersection

48.30–49.51

1.21

0.14

0.11

122

Whole Intersection

54.74–55.75

1.01

0.33

0.12

102

Whole Intersection

57.53–61.28

3.75

0.65

0.17

106

Whole Intersection

95.37–96.44

1.07

0.18

0.13

150

Whole Intersection

117.69–119.67

1.98

0.28

0.14

102

Whole Intersection

123.01–123.71

0.70

0.14

0.12

109

Whole Intersection

125.59–126.61

1.02

0.02

0.17

92

Whole Intersection

128.11–128.66

0.55

0.11

0.07

117

Whole Intersection

136.27–139.13

2.86

0.36

0.05

80

Whole Intersection

193.01–198.06

5.05

0.34

0.07

38

LRD100

-50

Whole Intersection

9.40–10.09

0.69

0.06

0.20

79

Whole Intersection

12.77–13.02

0.25

0.48

0.09

57

Whole Intersection

60.84–62.84

2.00

0.45

0.11

140

Whole Intersection

75.15–77.55

2.40

0.38

0.10

43

Whole Intersection

78.96–80.25

1.29

1.07

0.09

75

Whole Intersection

88.12–92.10

3.98

0.78

0.43

72

Whole Intersection

93.05–93.92

0.87

0.10

0.08

111

LRD103

-45

Whole Intersection

34.21–34.46

0.25

0.01

0.07

151

Whole Intersection

49.25–50.78

1.53

0.26

0.11

156

Whole Intersection

54.95–55.21

0.26

0.19

0.09

163

Whole Intersection

56.52–56.77

0.25

0.11

0.03

257

Whole Intersection

60.54–62.15

1.61

1.00

0.11

110

Whole Intersection

65.00–65.47

0.47

0.10

0.11

138

Whole Intersection

67.64–68.06

0.42

0.12

0.12

211

Whole Intersection

74.55–75.90

1.35

0.64

0.12

156

Whole Intersection

91.18–91.72

0.54

0.06

0.28

169

Whole Intersection

134.31–135.91

1.60

0.12

0.13

94

Whole Intersection

141.37–141.85

0.48

0.08

0.10

96

Whole Intersection

232.72–233.17

0.45

0.05

0.13

57

LRD104

-45

Whole Intersection

23.43–25.18

1.75

0.15

0.21

92

Whole Intersection

47.97–49.77

1.80

0.25

0.15

59

LRD105

-45

Whole Intersection

9.82–12.18

2.36

0.27

0.13

60

Whole Intersection

15.35–15.60

0.25

0.03

0.01

181

Whole Intersection

22.28–23.95

1.67

0.03

0.22

129

LRD106

-50

Whole Intersection

14.05–28.47

14.42

0.31

0.19

62

LRD106

-50

Whole Intersection

32.82–35.38

2.56

0.04

0.06

768

Whole Intersection

66.26–67.28

1.02

0.03

0.03

124

Whole Intersection

80.16–80.41

0.25

0.08

0.02

106

Whole Intersection

83.65–83.90

0.25

0.06

0.03

111

Whole Intersection

85.51–87.09

1.58

0.43

0.11

87

Whole Intersection

89.39–92.19

2.80

1.22

0.12

84

Whole Intersection

94.82–97.52

2.70

1.43

0.12

50

Whole Intersection

98.75–99.00

0.25

0.55

0.03

35

Whole Intersection

100.48–107.28

6.80

1.78

0.10

44

Including

102.38–105.38

3.00

2.32

0.10

52

Whole Intersection

108.11–108.36

0.25

0.29

0.04

61

Whole Intersection

108.66–110.07

1.41

0.91

0.11

46

Whole Intersection

110.88–113.80

2.92

0.71

0.06

53

Whole Intersection

122.77–123.65

0.88

0.27

0.09

85

Whole Intersection

125.97–126.22

0.25

0.11

0.12

74

Whole Intersection

129.26–130.40

1.14

0.89

0.12

71

Whole Intersection

130.65–132.62

1.97

0.44

0.13

92

Whole Intersection

138.10–138.44

0.34

0.10

0.02

152

LRD107

-50

Whole Intersection

26.71–29.01

2.30

0.32

0.09

69

Whole Intersection

55.75–56.59

0.84

0.11

0.13

146

Whole Intersection

74.35–74.75

0.40

0.01

0.27

108

Whole Intersection

107.05–107.48

0.43

0.02

0.10

99

Whole Intersection

177.89–180.97

3.08

0.36

0.11

68

Whole Intersection

188.97–189.84

0.87

0.54

0.09

65

Whole Intersection

191.63–191.88

0.25

0.44

0.03

80

Whole Intersection

193.79–194.04

0.25

0.25

0.03

48

Whole Intersection

195.60–196.08

0.48

0.25

0.04

57

Whole Intersection

196.46–197.29

0.83

0.81

0.09

86

Whole Intersection

197.75–198.68

0.93

0.48

0.12

84

Whole Intersection

200.58–201.14

0.56

0.18

0.03

125

Whole Intersection

203.84–204.09

0.25

0.14

0.07

119

Whole Intersection

214.17–214.42

0.25

0.07

0.03

110

Whole Intersection

218.10–219.22

1.12

0.40

0.00

2

Whole Intersection

225.40–226.67

1.27

0.13

0.10

78

Whole Intersection

237.68–238.60

0.92

0.17

0.12

110

LRD108

-60

Whole Intersection

27.06–28.31

1.25

0.01

0.14

113

Whole Intersection

35.07–36.94

1.87

0.42

0.16

129

LRD109

-60

Whole Intersection

56.30–70.68

14.38

0.35

0.08

88

Whole Intersection

76.56–89.81

13.25

0.55

0.08

44

Whole Intersection

139.53–139.87

0.34

0.02

0.16

122

Whole Intersection

212.60–212.85

0.25

0.08

0.02

106

Whole Intersection

213.81–214.07

0.26

0.11

0.02

144

Whole Intersection

220.05–221.11

1.06

0.08

0.13

64

Whole Intersection

223.11–224.27

1.16

0.48

0.15

67

Whole Intersection

226.49–227.43

0.94

0.88

0.11

60

Whole Intersection

228.03–231.61

3.58

1.37

0.10

38

Whole Intersection

240.92–241.34

0.42

0.43

0.04

116

Whole Intersection

251.35–254.23

2.88

0.56

0.11

71

Whole Intersection

256.26–258.74

2.48

0.05

0.16

78

Whole Intersection

259.90–260.57

0.67

0.30

0.05

55

Whole Intersection

263.66–265.69

2.03

0.08

0.24

77

Whole Intersection

299.51–299.76

0.25

0.26

0.27

98

LRD111

-60

Whole Intersection

3.77–4.56

0.79

0.04

0.22

287

Whole Intersection

30.21–34.80

4.59

0.44

0.18

202

Whole Intersection

43.17–44.84

1.67

0.14

0.46

252

LRD112

-60

Whole Intersection

19.74–24.26

4.52

0.42

0.32

127

Whole Intersection

30.10–30.65

0.55

0.08

0.05

110

Whole Intersection

35.71–36.24

0.53

0.09

0.33

354

LRD113

-60

Whole Intersection

229.37–229.62

0.25

0.13

0.02

100

Whole Intersection

232.48–232.78

0.30

0.05

0.02

229

Whole Intersection

237.26–237.58

0.32

0.07

0.05

139

Whole Intersection

237.98–238.31

0.33

0.14

0.04

118

Whole Intersection

240.42–241.34

0.92

0.18

0.21

131

Whole Intersection

241.84–242.09

0.25

0.21

0.05

110

LRD113

-60

Whole Intersection

243.60–243.90

0.30

0.11

0.03

127

Whole Intersection

249.92–250.52

0.60

0.41

0.08

106

Whole Intersection

251.00–251.42

0.42

0.36

0.05

106

Whole Intersection

252.50–252.75

0.25

0.27

0.07

83

Whole Intersection

253.62–253.87

0.25

0.25

0.04

74

Whole Intersection

254.46–255.17

0.71

1.45

0.18

105

Whole Intersection

256.47–288.66

32.19

0.92

0.13

90

Including

257.63–262.34

4.71

1.58

0.15

144

Whole Intersection

289.65–290.09

0.44

0.58

0.09

43

Whole Intersection

292.51–293.47

0.96

0.25

0.06

45

LRD114

-50

Whole Intersection

33.46–33.85

0.39

0.02

0.15

104

Whole Intersection

64.74–67.21

2.47

0.41

0.14

93

Whole Intersection

77.36–77.83

0.47

0.03

0.05

130

LRD115

-60

Whole Intersection

16.97–22.43

5.46

0.62

0.34

110

LRD116

-60

Whole Intersection

57.80–58.94

1.14

0.06

0.06

123

Whole Intersection

148.55–150.38

1.83

0.15

0.13

69

LRD117

-45

Whole Intersection

8.10–27.94

19.84

0.48

0.12

65

Whole Intersection

134.03–134.44

0.41

0.02

0.20

91

Whole Intersection

230.73–232.69

1.96

0.11

0.10

55

Whole Intersection

237.68–238.07

0.39

0.05

0.03

121

Whole Intersection

246.83–250.12

3.29

0.31

0.06

33

Whole Intersection

252.73–258.48

5.75

0.25

0.01

19

LRD118

-50

Whole Intersection

15.24–17.49

2.25

0.26

0.16

102

LRD119

-60

Whole Intersection

160.68–160.93

0.25

0.12

0.13

109

Whole Intersection

163.01–164.00

0.99

0.15

0.13

96

Whole Intersection

165.30–175.65

10.35

1.13

0.10

55

Including

166.79–173.35

6.56

1.31

0.07

38

Whole Intersection

177.33–178.66

1.33

0.31

0.13

107

Whole Intersection

181.11–181.54

0.43

0.16

0.09

125

Whole Intersection

184.30–184.75

0.45

0.09

0.06

118

Whole Intersection

186.87–206.02

19.15

1.09

0.11

51

Including

195.73–202.42

6.69

1.37

0.10

37

LRD120

-45

Whole Intersection

29.20–32.00

2.80

0.74

0.11

79

Whole Intersection

32.59–35.67

3.08

0.36

0.12

108

Whole Intersection

38.53–38.78

0.25

0.16

0.04

71

Whole Intersection

42.43–43.37

0.94

0.13

0.14

86

LRD122

-60

Whole Intersection

23.95–24.20

0.25

0.12

0.01

257

Whole Intersection

32.19–32.71

0.52

0.04

0.40

73

LRD123

-60

Whole Intersection

74.39–74.64

0.25

0.05

0.02

312

Whole Intersection

75.43–75.77

0.34

0.02

0.18

152

Whole Intersection

77.77–78.02

0.25

0.05

0.06

172

Whole Intersection

78.95–79.35

0.40

0.03

0.03

435

Whole Intersection

80.38–80.64

0.26

0.03

0.03

204

Whole Intersection

81.15–81.41

0.26

0.02

0.04

294

Whole Intersection

90.11–90.36

0.25

0.09

0.02

231

Whole Intersection

118.25–118.50

0.25

0.05

0.03

113

LRD124

-60

Whole Intersection

128.82–129.33

0.51

0.04

0.10

124

Whole Intersection

130.89–132.73

1.84

0.71

0.12

112

Whole Intersection

137.24–169.31

32.07

1.02

0.13

53

Including

137.49–142.50

5.01

1.70

0.17

61

Whole Intersection

189.42–190.64

1.22

0.05

0.04

197

LRD126

-60

Whole Intersection

103.64–109.67

6.03

0.19

0.11

48

Whole Intersection

142.88–145.62

2.74

0.02

0.05

122

Whole Intersection

158.07–158.56

0.49

0.03

0.02

226

Whole Intersection

159.22–161.00

1.78

0.03

0.07

124

Whole Intersection

184.45–203.86

19.41

0.74

0.06

34

Including

185.45–188.45

3.00

1.54

0.04

33

Whole Intersection

259.25–259.56

0.31

0.10

0.12

88

Whole Intersection

264.58–288.75

24.17

1.30

0.08

28

Including

268.85–276.85

8.00

1.67

0.08

20

Whole Intersection

289.85–290.22

0.37

0.13

0.12

103

Whole Intersection

290.91–291.16

0.25

0.99

0.04

154

Whole Intersection

293.24–293.62

0.38

0.07

0.11

107

Whole Intersection

294.72–295.19

0.47

0.26

0.03

33

LRD126

-60

Whole Intersection

295.44–297.42

1.98

0.56

0.11

59

Whole Intersection

299.57–299.82

0.25

0.23

0.04

116

LRD127

-45

Whole Intersection

11.39–17.72

6.33

0.72

0.15

74

Including

14.33–15.72

1.39

1.66

0.15

59

Whole Intersection

28.77–29.37

0.60

0.02

0.17

164

LRD128

-45

Whole Intersection

16.03–17.78

1.75

0.09

0.14

72

Whole Intersection

18.16–22.16

4.00

0.11

0.25

77

LRD129

-45

Whole Intersection

10.51–15.00

4.49

1.18

0.16

123

Including

11.51–14.51

3.00

1.68

0.16

89

Whole Intersection

18.48–19.79

1.31

0.02

0.10

76

LRD130

-60

Whole Intersection

24.40–35.79

11.39

0.17

0.21

118

Whole Intersection

44.92–52.26

7.34

0.39

0.24

61

LRD131

-45

Whole Intersection

12.80–14.12

1.32

0.05

0.20

57

LRD133

-45

Whole Intersection

2.76–3.01

0.25

0.05

0.09

196

Whole Intersection

22.08–27.36

5.28

0.22

0.25

52

Whole Intersection

39.03–49.48

10.45

0.22

0.19

155

LRD134

-45

Whole Intersection

37.34–37.62

0.28

0.13

0.05

126

LRD135

-45

Whole Intersection

13.05–13.30

0.25

0.09

0.03

125

Whole Intersection

18.95–35.86

16.91

0.74

0.14

120

Including

19.95–22.95

3.00

1.71

0.13

118

Whole Intersection

36.13–36.97

0.84

0.08

0.02

116

LRD136

-45

Whole Intersection

22.77–23.02

0.25

0.07

0.09

103

Whole Intersection

24.13–24.38

0.25

0.02

0.06

128

Whole Intersection

31.71–32.14

0.43

0.15

0.16

184

Whole Intersection

32.39–35.85

3.46

0.87

0.17

122

LRD138

-45

Whole Intersection

13.58–22.49

8.91

0.61

0.10

80

Including

18.50–19.50

1.00

2.17

0.02

70

LRD139

-60

Whole Intersection

44.56–46.56

2.00

0.12

0.19

90

Whole Intersection

57.30–62.95

5.65

0.05

0.10

85

Whole Intersection

94.52–98.67

4.15

0.06

0.18

64

Whole Intersection

113.15–114.43

1.28

0.06

0.07

112

Whole Intersection

166.25–166.68

0.43

0.01

0.13

393

LRD140

-45

Whole Intersection

25.62–26.49

0.87

0.03

0.16

62

LRD142

-90

Whole Intersection

41.75–47.34

5.59

0.78

0.27

381

LRD143

-45

Whole Intersection

19.50–20.00

0.50

0.03

0.33

123

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact [email protected] or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCBXLLLQFLLFBX

Related Shares:

Andrada Mining
FTSE 100 Latest
Value10,467.07
Change-13.75