Vedanta Q1 Production Release

31st Jul 2013 07:00

RNS Number : 5547K
Vedanta Resources PLC
31 July 2013
 



31 July 2013

 Vedanta Resources Plc

 Production Release for the First Quarter Ended 30 June 2013

 

Q1 Highlights

·; Mined metal production up 27% and integrated zinc production up 10% at Zinc India

·; Continued production ramp-up at Rajasthan oil & gas operations

·; Tuticorin copper smelter recommenced operations following a temporary shutdown

·; Supreme court has cleared iron ore mining in Karnataka, and we expect to resume mining in Q2

·; Power generation up 34% at the 2,400MW Jharsuguda power plant, driving substantial increase in commercial power sales

·; Group Structure consolidation and simplification received approval from the High Court of Madras on July 25, 2013

 

Zinc India

Q1

Q4

Full Year

Particulars (in'000 tonnes, or as stated)

FY2014

FY2013

% change YoY

FY2013

FY2013

Mined metal content

238

187

27%

260

870

Refined Zinc - Total

174

161

8%

182

677

Refined Zinc - Integrated

173

157

10%

181

660

Refined Zinc - Custom

1

4

(78%)

-

17

Refined Lead - Total 1

33

31

5%

35

125

Refined Lead - Integrated

29

29

1%

32

107

Refined Lead - Custom

3

2

70%

3

18

Saleable Silver - Total (in '000 ounces) 2

3,090

2,351

31%

3,480

12,021

Saleable Silver - Integrated (in '000 ounces)

2,475

2,274

9%

2,924

9,267

Saleable Silver - Custom (in '000 ounces)

614

77

700%

556

2,754

Revenue (US$ million)

513.7

487.2

5%

704.4

2,263.3

EBITDA (US$ million)

257.6

252.0

2%

388.0

1,165.3

 

During Q1, mined metal production was 27% higher than the corresponding prior quarter, in line with our plan to deliver 1 million tonnes of mined metal production during the year.

 

Integrated production of refined zinc was 10% higher due to higher smelter utilization. Integrated production of refined lead was in line with the corresponding prior quarter. Integrated saleable silver production was 9% higher driven by higher volumes from Sindesar Khurd and Zawar mines.

 

The cost of production (COP) of zinc excluding royalty was 1% lower at US$836 per tonne as compared with US$844 per tonne in the corresponding prior quarter due to lower specific consumption and price of coal, higher volumes and the depreciation of the Indian Rupee, partially offset by lower sulphuric acid credits and higher excavation costs.

 

EBITDA was marginally higher at US$258 million as the favourable impact of higher zinc sales was partially offset by lower LME and lower by-product realizations.

 

 

Zinc International

 

Q1

Q4

Full Year

Particulars (in'000 tonnes, or as stated)

FY2014

FY2013

% change YoY

FY2013

FY2013

Zinc International

90

106

(15%)

102

426

Refined Zinc - Skorpion

34

36

(4%)

36

145

Mined metal content - BMM and Lisheen

56

70

(21%)

65

280

Revenue(US$ million)

167.4

186.8

(10%)

209.1

797.2

EBITDA(US$ million)

53.5

62.4

(14%)

79.3

294.5

 

Zinc-Lead Metal in Concentrate (MIC) production was lower than the corresponding prior quarter on account of disruptions in production caused by accidents at Lisheen and BMM. COP was $1,162 per tonne as compared with $1,126 per tonne earlier. EBITDA was 14% lower due to lower volumes, lower LME and higher COP.

 

 

Oil and Gas

 

Q1

Q4

Full Year

Particulars

FY2014

FY2013

% change YoY

FY2013

FY 2013

OIL AND GAS (boepd)

Average Daily Gross Operated Production (boepd)

212,442

206,963

3%

202,014

205,323

Rajasthan

173,517

167,146

4%

168,594

169,390

Ravva

28,253

32,589

(13%)

27,205

29,161

Cambay

10,672

7,228

48%

6,215

6,772

Average Daily Working Interest Production (boepd)

132,087

127,226

4%

126,623

127,843

Rajasthan

121,462

117,002

4%

118,016

118,573

Ravva

6,357

7,333

(13%)

6,121

6,561

Cambay

4,269

2,891

48%

2,486

2,709

Total Oil and Gas Production (million boe)

Oil & Gas- Gross

19.33

18.83

3%

18.18

74.94

Oil & Gas-Working Interest

12.02

11.58

4%

11.40

46.66

Revenue(US$ million)

726.0

822.7

(12%)

804.6

3,223.4

EBITDA(US$ million)

545.7

655.5

(17%)

539.0

2,439.7

 

During Q1, average daily gross production was 212,442 barrels of oil equivalent (boe), 3% higher than the corresponding prior year period, driven primarily by the production ramp-up of the Rajasthan block fields. The CB-OS/2 (Cambay Field) has increased its oil production by 48% with the help of two new infill wells and one work over well. Production from Ravva, a mature field, declined as expected.

 

During the quarter, as a part of the exploration program in the Rajasthan block, Cairn India has drilled two exploration wells and one appraisal well and has made its latest oil discovery, the 26th discovery so far in the Rajasthan block. The initial results have strengthened the belief in the prospectivity of the block.

 

During Q1 FY2014, revenues and EBITDA were affected by lower realizations and higher profit petroleum payout at Rajasthan block Development Area 1, partially offset by higher volumes and the depreciation of the Indian Rupee.

 

 

Iron Ore

Q1

Q4

Full Year

Particulars (in million dry metric tonnes, or as stated)

FY2014

FY2013

% change YoY

FY2013

FY2013

IRON ORE 3

Sales

0.0

2.9

-

0.0

3.1

Goa

-

2.8

-

-

3.0

Karnataka4

0.0

0.0

-

0.0

0.1

Production of Saleable Ore

-

3.4

-

-

3.7

Goa

-

3.4

-

-

3.7

Karnataka

-

-

-

-

-

Production ('000 tonnes)

Pig Iron

110

39

179%

104

308

Met Coke

85

64

33%

94

331

Revenue (US$ million)

64.7

313.5

(79%)

54.7

442.5

EBITDA (US$ million)

(8.4)

125.6

(107%)

(16.9)

84.2

 

During Q1, iron ore operations in both the states of Goa and Karnataka continued to remain suspended. Our Karnataka mine has received clearance from the Supreme Court, and is now awaiting final statutory clearances in order to restart mining. We expect to resume mining at Karnataka in Q2.

Regarding the suspension of mining in Goa, a date for hearing is yet to be fixed by the Supreme Court. Earlier, the State Government and major miners, including Sesa Goa, had filed their responses to the report submitted by the Central Empowered Committee. Separately, we have filed an application to the Supreme Court for a modification or vacation of the Court's existing order on the suspension of mining and restrictions on ore transportation.

 

Production of pig iron and metallurgical coke were 179% and 33% higher at 110,000 tonnes and 85,000 tonnes, respectively as compared with the corresponding prior period, due to the new capacities commissioned in Q2 FY2013.

 

At our Liberia iron ore project, exploration activities are progressing well with c.91,500 meters of drilling completed as of 30 June 2013 across the three deposits - Bomi, Bea and Mano River. We are working to complete the first phase of 2mtpa by December 2014, and remain on track to deliver the first shipment by March 2014.

 

 

Copper - India and Australia

Q1

Q4

Full Year

Particulars (in'000 tonnes, or as stated)

FY2014

FY2013

% change YoY

FY2013

FY2013

Copper - Mined metal content

6

7

(13%)

7

26

Copper - Cathodes

16

88

(82%)

86

353

Revenue (US$ million)

440.2

977.3

(55%)

1,080.8

3,991.1

EBITDA (US$ million)

4.0

45.4

(91%)

68.6

219.1

 

During Q1, mined metal production at Australia was 13% lower than the corresponding prior quarter due to lower grades. Copper cathode production at the Tuticorin smelter was lower due to a temporary closure of the smelter for most of the quarter, and revenues and EBITDA were not comparable to prior periods.

 

EBITDA was lower due to fixed expenses of the Tuticorin smelter, offset by gains on sale of surplus power from the Tuticorin power plant. EBITDA contribution from Australian mining operations was affected by lower sales, lower LME and higher cost.

 

Following the Tamil Nadu Pollution Control Board's (TNPCB) order for closure of the Tuticorin copper smelter on March 29, 2013, the National Green Tribunal (NGT) heard our appeal and passed an interim order on May 31, 2013 conditionally allowing the smelter to recommence operations, and the plant restarted on June 23, 2013. On July 15, 2013, an expert committee confirmed that the plant meets the prescribed standards, and the NGT permitted us to continue operations and has reserved its final order. Separately, the TNPCB has filed an appeal against the NGT's interim order before the Supreme Court and the appeal is being heard. The Supreme Court has not granted a stay on the NGT's interim order and has allowed the smelter to continue to operate.

 

Copper - Zambia

 

Q1

Q4

Full Year

Particulars (in'000 tonnes, or as stated)

FY2014

FY2013

% change YoY

FY2013

FY2013

Mined metal

36

41

(12%)

33

159

Copper - Total

43

49

(12%)

54

216

Integrated

29

36

(21%)

36

160

Custom

15

13

12%

17

56

 Revenue (US$ million)

312.0

355.4

(12%)

443.8

1,742.8

 EBITDA (US$ million)

48.8

87.7

(44%)

35.6

257.3

 

During Q1, mined metal production was 36,000 tonnes, 12% lower than the corresponding prior quarter mainly due to lower production at the Nchanga open pits on account of temporary suspension of mining operations at COP F&D since January 2013, which was partially offset by higher output from Konkola mines and Tailings Leach Plant.

 

Integrated copper production was lower at 29,000 tonnes and total copper production was 12% lower at 43,000 tonnes due to a temporary shutdown of the Nchanga smelter, resulting in a build up of concentrate inventory that will be processed in Q2 and Q3.

 

Cost of integrated production excluding royalty was in line with earlier guidance at USc223/lb and 23% lower than Q4, when COP F&D was suspended. The benefit of stable costs was outweighed by lower volumes and lower LME, resulting in an EBITDA of US$48.8 million.

 

We now expect to deliver integrated production of around 160kt at a cost of c. USc230/lb for the full year, FY2014, primarily due to the suspension of mining at COP F&D.

 

Aluminium

Q1

Q4

Full Year

Particulars (in'000 tonnes, or as stated)

FY2014

FY2013

% change YoY

FY2013

FY2013

Alumina - Lanjigarh

0

218

-

0

527

Total Aluminium Production

195

185

5%

195

774

Jharsuguda-I

134

124

8%

133

527

Korba-II

61

60

1%

62

247

BALCO 270MW Power Sales (mu)

187

338

(45%)

282

1,241

Revenue (US$ million)

436.9

447.3

(2%)

502.4

1,920.8

EBITDA (US$ million)

50.8

49.3

3%

62.3

214.0

 

During Q1, aluminium production was 195,000 tonnes, 5% higher than the corresponding prior quarter as the Jharsuguda-I 500kt smelter operated at 7% above its rated capacity. This was driven by significant improvements in specific power consumption and other operational parameters and the depreciation of the Indian Rupee, resulting in a lower cost of production (COP) of US$1,675 per tonne, as compared to US$1,845 per tonne earlier, despite running the smelter with third-party alumina feed as operations of the Lanjigarh alumina refinery were temporarily suspended. The refinery has subsequently recommenced operations in July.

 

The Korba-II aluminium smelter continues to operate at its rated capacity. Aluminium COP at Balco was higher at US$1,934 per tonne, primarily on account of further tapering of coal linkage (around $70/tonne of aluminium) as per the Coal Block policy and a maintenance shutdown of one of our captive power units.

 

Revenues were marginally lower on account of lower LME. Premiums were US$445 per tonne at BALCO and US$320 per tonne at VAL Jharsuguda. EBITDA for the quarter was 3% higher at US$51 million despite the temporary suspension of operations of the Lanjigarh refinery and lower LME.

The BALCO 1,200MW captive power plant is awaiting consent to operate. We expect to tap first metal at 325 ktpa BALCO-III Aluminium smelter in Q3 FY2014. Having obtained the forest clearance for the BALCO coal block, we are working on obtaining other approvals which are taking longer than expected, and we expect to commence mining in Q1 FY2015.

 

We continue to evaluate the potential start-up date of the 1.25 mtpa Jharsuguda smelter. In the meantime, we have stopped capitalising the interest cost related to this smelter and have started to expense this from Q1 FY2014, in compliance with the relevant accounting standard. This interest cost was $46 mn for Q1.

 

Power

Q1

Q4

Full Year

Particulars (in million units)

FY2014

FY2013

% change YoY

FY2013

FY2013

Total Power Sales

2,990

2,329

28%

2,356

8,888

SEL 5

2,604

1,938

34%

2,073

7,530

MALCO

224

209

7%

204

847

HZL Wind Power

162

182

(11%)

78

511

Revenue (US$ million)

211.7

157.8

34%

156.9

576.1

EBITDA (US$ million)

76.9

64.2

20%

60.9

215.0

Note: Unit refers to kWh

During Q1, power sales were 28% higher than the corresponding prior period due to higher power generation from Jharsuguda 2,400MW plant, which operated at PLF of 54% for all four units as compared with 50% for three units during the corresponding prior period.

 

Average power realization increased to Rs. 3.65 per unit due to higher sales volume from open access. The power generation cost at Jharsuguda during the quarter was Rs. 2.21 per unit as compared with Rs. 2.14 per unit in corresponding prior quarter.

 

Revenues were 34% higher at US$ 212 million and EBITDA was 20% higher, primarily on account of higher power generation at Jharsuguda 2,400MW plant.

 

The first unit of the 1,980MW Talwandi Sabo power project is expected to be synchronized in Q3 FY2014.

 

 

Vedanta Group Consolidation and Simplification

The proposed Vedanta Group Consolidation and Simplification has received the approval of the High Court of Madras on July 25, 2013 and the approval of the High Court of Bombay at Goa on 3 April 2013.

 

One of the shareholders of Sesa Goa has filed an appeal against the order passed by the High Court of Bombay at Goa before the Division Bench of the same court. The hearings before the Division Bench have been completed and the order is awaited.

Production Summary (Unaudited)

(in '000 tonnes, except as stated)

Q1

Q4

Full Year

 

Particulars

FY2014

FY2013

% change YoY

FY2013

FY2013

 

ZINC INDIA

 

Mined metal content

238

187

27%

260

870

 

Refined Zinc - Total

174

161

8%

182

677

 

Refined Zinc - Integrated

173

157

10%

181

660

 

Refined Zinc - Custom

1

4

(78%)

0

17

 

Refined Lead - Total 1

33

31

5%

35

125

 

Refined Lead - Integrated

29

29

1%

32

107

 

Refined Lead - Custom

3

2

70%

3

18

 

Saleable Silver - Total (in '000 ounces) 2

3,090

2,351

31%

3,480

12,021

 

Saleable Silver - Integrated (in '000 ounces)

2,475

2,274

9%

2,924

9,267

 

Saleable Silver - Custom (in '000 ounces)

614

77

700%

556

2,754

 

 

ZINC INTERNATIONAL

90

106

(15%)

102

426

 

-Refined Zinc- Skorpion

34

36

(4%)

36

145

 

Mined metal content- BMM and Lisheen

56

70

(21%)

65

280

 

 

OIL AND GAS (boepd)

 

Average Daily Gross Operated Production

212,442

206,963

3%

202,014

205,323

 

Rajasthan

173,517

167,146

4%

168,594

169,390

 

Ravva

28,523

32,589

(13%)

27,205

29,161

 

Cambay

10,672

7,228

48%

6,215

6,772

 

Average Daily Working Interest Production

132,087

127,226

4%

126,623

127,843

 

Rajasthan

121,462

117,002

4%

118,016

118,573

 

Ravva

6,357

7,333

(13%)

6,121

6,561

 

Cambay

4,269

2,891

48%

2,486

2,709

 

Total Oil and Gas Production (million boe)

 

Oil & Gas - Gross

19.33

18.83

3%

18.18

74.94

 

Oil & Gas - Working Interest

12.02

11.58

4%

11.40

46.66

 

 

IRON ORE 3 (in million dry metric tonnes, or as stated)

 

Sales

0.0

2.9

-

0.0

3.1

 

Goa

-

2.8

-

-

3.0

 

Karnataka 4

0.0

0.0

-

0.0

0.1

 

Production of Saleable Ore

-

3.4

-

-

3.7

 

Goa

-

3.4

-

-

3.7

 

Karnataka

-

-

-

-

-

 

Production ('000 tonnes)

 

Pig Iron

110

39

179%

104

308

 

Met Coke

85

64

33%

94

331

 

-

-

Production Summary (Unaudited)

 

Q1

Q4

Full Year

Particulars

FY2014

FY2013

% change YoY

FY2013

FY2013

COPPER- INDIA / AUSTRALIA

Copper - Mined metal content

6

7

(13%)

7

26

Copper - Cathodes

16

88

(82%)

86

353

Tuticorin power sales (million units)

137

-

-

-

-

COPPER -ZAMBIA

Mined metal

36

41

(12%)

33

159

Copper - Total

43

49

(12%)

54

216

Integrated

29

36

(21%)

36

160

Custom

15

13

12%

17

56

ALUMINIUM

Alumina - Lanjigarh

0

218

-

0

527

Total Aluminium Production

195

185

5%

195

774

Jharsuguda-I

134

124

8%

133

527

Korba-II

61

60

1%

62

247

BALCO 270MW Power Sales

187

338

(45%)

282

1,241

POWER (in million units)

Total Power Sales

2,990

2,329

28%

2,356

8,888

SEL 5

2,604

1,938

34%

2,073

7,530

MALCO

224

209

7%

204

847

HZL Wind Power

162

182

(11%)

78

511

 

1. Including captive consumption of 1,644 tonnes in Q1 FY2014 vs. 1,641 tonnes in Q1 FY2013.

2. Excluding captive consumption of 284,000 ounces in Q1 FY2014 vs. 278,000 ounces in Q1 FY2013.

3. Iron Ore sales include internal consumption of nil million tonnes in Q1 FY2014 vs. 0.06 million tonnes in Q1 FY2013.

4. Sales of iron ore from Karnataka were 0.2 million tonnes in Q1 FY 2014 vs 0.05 million tonnes in Q1 FY 2013 through court sponsored e-auction of inventory

5. Includes production under trial run of nil million units in Q1 FY2014 vs.202 million units in Q1 FY2013

 

 

 

Financial Summary (Unaudited)

(in US$ million, except as stated)

 Group REVENUE

 

Q1

Q4

Full Year

Particulars

FY2014

FY2013

% change YoY

 

FY2013

FY2013

Zinc

681.1

674.0

1%

913.5

3,060.5

- India

513.7

487.2

5%

704.4

2,263.3

- International

167.4

186.8

(10%)

209.1

797.2

Oil and Gas

726.0

822.7

(12%)

804.6

3,223.4

Iron Ore

64.7

313.5

(79%)

54.7

442.5

Copper

752.3

1,332.7

(44%)

1,524.6

5,733.9

- India/Australia

440.2

977.3

(55%)

1,080.8

3,991.1

- Zambia

312.0

355.4

(12%)

443.8

1,742.8

Aluminium

436.9

447.3

(2%)

502.4

1,920.8

Power

211.7

157.8

34%

156.9

576.1

Others

2.0

(1.5)

(233%)

6.2

32.6

Total Revenue

2,874.6

3,746.5

(23%)

3,962.9

14,989.8

 

 (in US$ million, except as stated)

 Group EBITDA

 

Q1

Q4

Full Year

Particulars

FY2014

FY2013

% change YoY

 

FY2013

FY2013

Zinc

311.1

314.4

(1%)

467.3

1,459.8

- India

257.6

252.0

2%

388.0

1,165.3

- International

53.5

62.4

(14%)

79.3

294.5

Oil and Gas

545.7

655.5

(17%)

539.0

2,439.7

Iron Ore

(8.4)

125.6

(107%)

(16.9)

84.2

Copper

52.8

133.1

(60%)

104.1

476.4

- India/Australia

4.0

45.4

(91%)

68.6

219.1

- Zambia

48.8

87.7

(44%)

35.6

257.3

Aluminium

50.8

49.3

3%

62.3

214.0

Power

76.9

64.2

20%

60.9

215.0

Others

1.7

(2.1)

181%

(0.4)

(0.8)

Total EBITDA

1,030.7

1,340.0

(23%)

1,216.4

4,888.3

 

For further information, please contact:

Investors

Ashwin Bajaj

Senior Vice President - Investor Relations

Vedanta Resources plc

 

[email protected]

Tel: +91 22 6646 1531

 

Media

Gordon Simpson

Finsbury

Tel: +44 20 7251 3801

 

About Vedanta Resources plc

Vedanta Resources plc ("Vedanta") is a London listed FTSE 100 diversified global natural resources major. The group produces aluminium, copper, zinc, lead, silver, iron ore, oil & gas and commercial energy. Vedanta has operations in India, Zambia, Namibia, South Africa, Ireland, Liberia, Australia and Sri Lanka. With an empowered talent pool globally, Vedanta places strong emphasis on partnering with all its stakeholders based on the core values of entrepreneurship, excellence, trust, inclusiveness and growth. For more information, please visit www.vedantaresources.com.

 

Disclaimer

This press release contains "forward-looking statements" - that is, statements related to future, not past, events. In this context, forward-looking statements often address our expected future business and financial performance, and often contain words such as "expects," "anticipates," "intends," "plans," "believes," "seeks," "should" or "will." Forward-looking statements by their nature address matters that are, to different degrees, uncertain. For us, uncertainties arise from the behaviour of financial and metals markets including the London Metal Exchange, fluctuations in interest and or exchange rates and metal prices; from future integration of acquired businesses; and from numerous other matters of national, regional and global scale, including those of a political, economic, business, competitive or regulatory nature. These uncertainties may cause our actual future results to be materially different that those expressed in our forward-looking statements. We do not undertake to update our forward-looking statements.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
QRFLIFFEDSILVIV

Related Shares:

Vedanta Resources
FTSE 100 Latest
Value8,717.97
Change-21.29