Become a Member
  • Track your favourite stocks
  • Create & monitor portfolios
  • Daily portfolio value
Sign Up
Quickpicks
Add shares to your
quickpicks to
display them here!

TULU KAPI DRILLING UPDATE

24th Mar 2010 07:00

RNS Number : 0797J
Nyota Minerals Limited
24 March 2010
 



 

Nyota Minerals Limited ('Nyota' or the 'Company')

 

TULU KAPI DRILLING UPDATE

 

 

HIGHLIGHTS

 

·; On track for 2nd Quarter JORC compliant resource update

 

·; 35 holes completed

 

·; Positive assay results received for first 18 RC holes

 

·; Peak gold intersections achieved to date include more than 10 intersections in excess of 11g/t, of which 8 of those intersections exceed 14g/t and headline grades of 22.7g/t Au over 1m and 21.2g/t Au over 1m were recorded (see table below for details)

 

 

Nyota Minerals Limited (AIM: NYO/ ASX; NYO), which is focused on the exploration and development of gold and nickel projects in Africa, is pleased to announce assay results from the first 18 reverse circulation ('RC') holes of an ongoing drill programme at its Tulu Kapi gold project in Ethiopia. The accumulation of assay data is ongoing and, due to the significant number of high-grade intersections, repeat assay and verification will be required to confirm gold grades. An update and upgrade of the existing Tulu Kapi Inferred Resource of 690,000oz remains on track for completion during the second quarter of 2010.

 

Phase 1 and Phase 2 RC drilling to date shows:

 

·; the gold bearing lodes extend NE beyond the known limits of the Inferred Resource;

 

·; the existence of mineralised structures stacked beneath the previously identified lodes; and

 

·; that gold grades are, consistent with the expectations of Company geologists, increasing with depth.

 

The original diamond drill programme at Tulu Kapi intersected two lode structures. Subsequent drilling by Nyota has proven the presence of a further four lodes stacked beneath Lodes 1 and 2. Assay results clearly confirm that the gold grade is increasing with depth.

 

35 RC holes have been completed over the Up-Dip Extension of Tulu Kapi for a total of approximately 7,000m of drilling. To date, gold assays have been received for the first 18 holes, returning very encouraging results, including;

 

22.7g/t Au over 1m

21.1g/t Au over 1m

19.8g/t Au over 2m

17g/t Au over 1m

16.2g/t Au over 2m

16.1g/t Au over 1m

14.4g/t Au over 1m

14g/t Au over 1m

13.6g/t Au over 1m

12.5g/t Au over 2m

11.2g/t Au over 1m

9.92g/t Au over 1m

9.79g/t au over 1m

9.0g/t Au over 8m

9.0g/t Au over 5m

8.9g/t Au over 3m

 

A table setting out comprehensive results for each of those 18 holes follows at the end of this announcement.

 

The Company will continue to accumulate assay data before handing over the geological interpretation and results to the independent consultant to prepare an updated resource estimation.

 

Melissa Sturgess, CEO, commented "We are very encouraged by the quality of the drilling results to date. I feel that we are now starting to understand the orebody and its potential. Work on the Tulu Kapi Project is gaining momentum and we look forward to reporting the upgraded resource estimate to shareholders next Quarter."

 

For further information please contact:

 

Melissa Sturgess

Nyota Minerals Limited

(+44) (0)78 2555 1397 or [email protected]

 

Richard Brown/ Richard Greenfield

Ambrian Partners Limited

(+44) (0)20 7634 4700

 

Press enquiries

Charlie Geller or Leesa Peters

Conduit PR

+44 (0)20 7429 6604/ +44 (0)75 2823 3383

 

Or visit: http://www.nyotaminerals.com

 

 

 

DETAILED INTERSECTION RESULTS

 

 

Borehole

UTME

UTMN

Final

Line

Inters-ection

Inter-section

Mineralised

Grade

Internal

 

Depth

From

To

Width

(g/t Au)

Grade

 

(m)

(m)

(m)

(m)

(g/t Au)

 

 

TKRC-001

780506.04

1004713.9

200

160N

0.00

2.00

2.00

0.62

 

130.00

132.00

2.00

0.70

 

144.00

148.00

4.00

1.87

 

153.00

155.00

2.00

2.25

 

186.00

196.00

10.00

4.79

5.0m @ 9.0g/t Au

 

 

TKRC-002

780515

1004725

201

160N

0.00

2.00

2.00

0.69

 

7.00

9.00

2.00

0.78

 

19.00

22.00

3.00

3.05

 

37.00

39.00

2.00

1.87

 

56.00

59.00

3.00

0.75

 

153.00

155.00

2.00

1.84

 

156.00

158.00

2.00

1.21

 

190.00

192.00

2.00

0.90

 

 

TKRC-003

780567

1004765

200

160N

1.00

3.00

2.00

0.61

 

10.00

12.00

2.00

0.62

 

23.00

24.00

1.00

2.81

 

51.00

54.00

3.00

1.28

 

123.00

132.00

2.00

10.71

1.0m @ 21.1g/t Au

 

184.00

187.00

3.00

4.90

1.0m @ 14.0g/t Au

 

 

TKRC-004

780518.04

1004619.9

208

80N

0.00

3.00

3.00

0.74

 

16.00

17.00

1.00

1.48

 

18.00

20.00

2.00

1.50

 

31.00

32.00

1.00

3.92

 

47.00

49.00

2.00

7.30

1.0m @13.6g/t Au

 

75.00

81.00

6.00

2.54

 

100.00

103.00

3.00

6.32

1.0m @ 9.36g/t Au

 

104.00

106.00

2.00

1.27

 

144.00

146.00

2.00

2.51

 

186.00

188.00

2.00

3.30

 

191.00

193.00

2.00

8.20

 

197.00

201.00

4.00

2.93

1.0m @ 6.9g/t Au

 

206.00

207.00

1.00

3.92

 

 

TKRC-005

780549

1004645

208

80N

0.00

3.00

3.00

1.25

 

79.00

87.00

8.00

1.11

 

106.00

108.00

2.00

1.74

 

111.00

113.00

2.00

1.13

 

130.00

132.00

2.00

0.90

 

140.00

147.00

7.00

1.77

 

165.00

166.00

11.19

1.19

 

194.00

200.00

6.00

3.04

1.0m @ 13.6g/t Au

 

 

TKRC-006

780567.9

1004556.9

196

00

0.00

4.00

4.00

0.41

 

42.00

44.00

2.00

1.23

 

101.00

104.00

3.00

1.37

 

111.00

112.00

1.00

1.47

 

155.00

156.00

1.00

3.66

 

160.00

168.00

8.00

7.00

2.0m @ 12.5g/t Au, 3.0m @ 8.9g/t Au

 

 

TKRC-007

780598.6

1004582.6

202

00

0.00

2.00

2.00

0.25

 

13.00

14.00

1.00

2.01

 

24.00

26.00

2.00

0.66

 

97.00

99.00

2.00

1.05

 

102.00

103.00

1.00

1.25

 

145.00

155.00

10.00

7.33

8.0m @ 9.0g/t Au

 

 

TKRC-008

780629.2

1004608.3

206

00

0.00

6.00

6.00

1.81

 

79.00

82.00

3.00

2.70

 

120.00

127.00

7.00

3.90

1.0m @22.7g/t Au

 

134.00

137.00

3.00

1.25

 

141.00

142.00

1.00

1.21

 

180.00

183.00

3.00

1.76

 

192.00

194.00

2.00

1.90

 

196.00

206.00

10.00

4.33

2.0m @ 19.8g/t Au

 

 

TKRC-009

780631

1004497

200

80S

0.00

2.00

2.00

0.60

 

9.00

10.00

1.00

2.52

 

33.00

34.00

1.00

1.45

 

117.00

120.00

3.00

1.20

 

130.00

131.00

1.00

1.76

 

137.00

142.00

5.00

1.85

 

 

TKRC-010

780659

1004529

200

80S

0.00

3.00

3.00

1.04

 

93.00

96.00

3.00

10.93

2.0m @ 16.2g/t Au

 

104.00

105.00

1.00

3.07

 

114.00

121.00

7.00

1.07

 

128.00

129.00

1.00

1.28

 

 

TKRC-011

780692

1004552

200

80S

0.00

3.00

3.00

0.41

 

82.00

83.00

1.00

1.48

 

93.00

95.00

2.00

1.53

 

140.00

143.00

3.00

7.50

1.0m @17.0g/t Au

 

163.00

165.00

2.00

1.54

 

 

TKRC-012

780631

1004401

200

160S

0.00

1.00

1.00

0.66

 

3.00

5.00

2.00

2.93

 

26.00

28.00

2.00

2.00

 

43.00

51.00

8.00

2.71

3.0m @ 5.32g/t Au

 

58.00

60.00

2.00

0.98

 

93.00

94.00

1.00

1.54

 

117.00

119.00

2.00

2.60

 

129.00

131.00

2.00

7.27

1.0m @ 14.4g/t Au

 

 

TKRC-013

780662.06

1004427

199

160S

12.00

14.00

2.00

3.35

 

20.00

27.00

7.00

3.03

1.0m @ 16.1g/t Au

 

32.00

38.00

6.00

1.32

 

68.00

70.00

2.00

2.24

 

96.00

99.00

3.00

0.90

 

102.00

105.00

3.00

1.38

 

122.00

124.00

2.00

5.86

 

159.00

160.00

1.00

1.76

 

163.00

165.00

2.00

1.08

 

185.00

188.00

3.00

2.40

 

 

TKRC-014

780441

1004763

200

240N

0.00

5.00

5.00

1.07

 

15.00

16.00

1.00

1.79

 

 

TKRC-015

780471.69

1004789.5

202

240N

22.00

24.00

2.00

1.10

 

30.00

34.00

4.00

1.32

 

105.00

106.00

1.00

1.35

 

152.00

153.00

1.00

1.42

 

168.00

172.00

4.00

3.27

1.0m @ 9.79g/t Au

 

 

TKRC-016

780581

1004640

208

80N

26.00

28.00

2.00

3.16

 

35.00

36.00

1.00

2.38

 

48.00

50.00

2.00

1.00

 

55.00

60.00

5.00

2.20

 

65.00

68.00

3.00

1.72

 

73.00

74.00

1.00

1.32

 

 

TKRC-017

780582

1004641

200

80N

70.00

71.00

1.00

1.15

 

112.00

115.00

3.00

5.20

1.0m @ 11.2g/t Au

 

119.00

120.00

1.00

1.60

 

130.00

132.00

2.00

1.86

 

139.00

141.00

2.00

1.45

 

152.00

153.00

1.00

1.00

 

183.00

186.00

3.00

3.55

1.0m @ 9.92g/t Au

 

195.00

196.00

1.00

2.29

 

 

TKRC-018

 780661

1004638 

202

00

64.00

65.00

1.00

1.19

 

104.00

107.00

3.00

2.61

1.0m @4.91g/t au

 

109.00

110.00

1.00

1.14

 

112.00

113.00

1.00

1.04

 

119.00

120.00

1.00

1.00

 

 

The technical information contained in this announcement has been reviewed and approved by Mr. RN Chapman. Mr. Chapman has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity to which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves and as a qualified person under the AIM Note for Mining, Oil and Gas Companies. Mr. Chapman is an employee of Mineral Exploration Management Limited, an independent geological consultancy established in 2005 and is a member of the Australasian Institute of Mining and metallurgy (Aus.I.M.M).

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSEASFLFSSELD

Related Shares:

Nyota Minerals
FTSE 100 Latest
Value8,275.66
Change0.00