29th Jan 2015 07:00
29 January 2015
Kaz minerals PLC Production Report for 12 MONTHS AND the fourth Quarter Ended 31 december 2014
l Full year copper cathode production from continuing operations 83.5 kt
§ Achieved upper end of guidance, 80-85 kt
§ 2014 cathode production from continuing operations rose by 9%, supported by increase in copper in concentrate production
§ Movement from prior year also impacted by build-up of work in progress at the smelter during 2013
§ Increased recovery rate at Nikolayevsky concentrator following modernisation programme
l Q4 2014 copper cathode production from continuing operations 24.1 kt
§ Strong Q4 2014 copper cathode output of 24.1 kt (Q3 2014: 18.3 kt) as concentrate work in progress from the previous quarter was processed
l Full year by-product output from continuing operations robust
§ Zinc in concentrate output of 121 kt - ahead of guidance
§ Silver output of 3,435 koz - in line with guidance
§ Gold output of 34.6 koz - 4.0 koz gold in concentrate delivered from Bozymchak will be processed in 2015
Basis of preparation - continuing operations versus discontinued operations
§ The 'Mining Production - Retained Assets' section contains production figures, comparative data and commentary that relate to the continuing operations in the East Region and Bozymchak
§ The 'Group Production Summary' section includes separate production data for the Disposal Assets that were under the ownership of the Group until the Restructuring was completed on 31 October 2014
Oleg Novachuk, Chief Executive, said: "Our continuing operations in the East Region delivered a strong fourth quarter of copper cathode production and we have achieved the upper end of our full year guidance. The fourth quarter also included copper cathode production from our new copper-gold mine at Bozymchak, which made its first shipment of concentrate to the Balkhash smelter in December 2014. We look forward to updating the market on 26 February 2015 with our full year results for 2014 and on progress at our major growth projects, Bozshakol and Aktogay."
For further information please contact:
KAZ Minerals PLC | |||
Chris Bucknall | Investor Relations, London | Tel: +44 20 7901 7882 | |
Maria Babkina | Corporate Communications, London | Tel: +44 20 7901 7849 | |
Irene Burton | Financial Analyst, London | Tel: +44 20 7901 7814 | |
Maksut Zhapabayev | Corporate Communications, Almaty | Tel: +7 727 244 03 53 | |
Instinctif Partners | |||
David Simonson | Tel: +44 20 7457 2020 | ||
Anca Spiridon | Tel: +44 20 7457 2020 | ||
Hill & Knowlton Hong Kong | |||
K W Lam | Tel: +852 2894 6321 | ||
REGISTERED OFFICE
6th Floor, Cardinal Place, 100 Victoria Street, London SW1E 5JL, United Kingdom.
NOTES TO EDITORS
KAZ Minerals PLC("KAZ Minerals") is a high growth copper company focused on large scale, low cost, open pit mining in Kazakhstan. It is a leading copper producer in Kazakhstan with five operating mines and four concentrators. In 2014, total copper cathode output from continuing operations was 84 kt. The Group's continuing operations also produced 121 kt of zinc in concentrate, 3,435 koz of silver and 35 koz of gold in 2014.
The Group has two major copper projects under construction, Bozshakol and Aktogay, and a third, Koksay, at scoping stage. These projects are expected to deliver one of the highest growth rates in the industry and transform KAZ Minerals into a company dominated by world class open pit copper mines.
KAZ Minerals PLC is listed on the London Stock Exchange, the Kazakhstan Stock Exchange and the Hong Kong Stock Exchange and employs around 10,000 people, principally in Kazakhstan.
Group Restructuring
In October 2014, the Group completed the disposal of certain mature assets in the Zhezkazgan and Central Regions (the "Disposal Assets") to Cuprum Netherlands Holding B.V. (the "Restructuring").
Following completion of the Restructuring, the Company was renamed KAZ Minerals PLC. The Company retained mining and processing assets in the East Region, Bozymchak (the new mine and concentrator in Kyrgyzstan) and the three major growth projects Bozshakol, Aktogay and Koksay (the "Retained Assets"). As a result of the Restructuring, KAZ Minerals is a smaller, focused group, with the potential for exceptional future growth as it develops its projects.
Copper Summary
mining Production - RETAINED ASSETS
East Region and Bozymchak Production Summary1
12m 2014 | 12m 2013 | Q4 2014 | Q3 2014 | Q4 2013 | ||||||
Ore extraction | kt | 4,628 | 4,350 | 1,116 | 1,260 | 1,076 | ||||
Average copper grade | % | 2.35 | 2.41 | 2.36 | 2.11 | 2.51 | ||||
Copper concentrate | kt | 474.6 | 462.1 | 125.3 | 114.4 | 126.5 | ||||
Copper in concentrate | kt | 89.9 | 86.8 | 23.6 | 21.9 | 23.3 | ||||
Copper cathode production | kt | 83.5 | 76.8 | 24.1 | 18.3 | 22.7 | ||||
1Includes output from the commissioning of the Bozymchak mine in 2014.
Copper cathode output from continuing operations rose by 9% in 2014 to 83.5 kt, supported by an increase in recovery rates at the Nikolayevsky concentrator. The movement from the prior year was also impacted by a build-up of work in progress at the Balkhash smelter during 2013.
2014 production includes a contribution from the new copper-gold Bozymchak mine of 426 kt of ore and 0.7 kt of copper in concentrate. The first shipment of concentrate reached the Balkhash smelter in December 2014, part of which was processed in the month.
In Q4 2014, copper cathode output from continuing operations of 24.1 kt was 32% above Q3 2014, assisted by an 8% increase in copper in concentrate production (5% excluding Bozymchak) and the release of work in progress accumulated in Q3 2014.
Copper Production Detail
MINING | 12m 2014 | 12m 2013 | Q4 2014 | Q3 2014 | Q4 2013 | ||||||
Artemyevsky | ore (kt) | 1,358 | 1,332 | 344 | 340 | 310 | |||||
grade (%) | 1.78 | 1.68 | 1.86 | 1.69 | 1.72 | ||||||
Irtyshsky | ore (kt) | 637 | 626 | 171 | 145 | 157 | |||||
grade (%) | 1.49 | 1.49 | 1.56 | 1.46 | 1.44 | ||||||
Orlovsky | ore (kt) | 1,548 | 1,557 | 390 | 376 | 392 | |||||
grade (%) | 3.66 | 3.45 | 3.46 | 3.48 | 3.60 | ||||||
Yubileyno-Snegirikhinsky | ore (kt) | 659 | 835 | 150 | 149 | 217 | |||||
grade (%) | 2.13 | 2.30 | 2.11 | 2.13 | 2.43 | ||||||
Bozymchak | ore (kt) | 426 | - | 61 | 250 | - | |||||
grade (%) | 1.00 | - | 1.01 | 1.00 | - | ||||||
Total | ore (kt) | 4,628 | 4,350 | 1,116 | 1,260 | 1,076 | |||||
Average | grade (%) | 2.35 | 2.41 | 2.36 | 2.11 | 2.51 | |||||
Ore extraction from the East Region operations and Bozymchak mine increased to 4,628 kt in 2014, 6% above the prior year, with the Bozymchak mine in Kyrgyzstan contributing 426 kt of ore at 1.00% copper grade. Ore output in the East Region decreased by 3% in 2014 mainly due to a 21% reduction in ore extraction at the mature Yubileyno-Snegirikhinsky mine, with the mine expected to cease operations within the next two years. Ore output at the Artemyevsky and Orlovsky mines, which together produced 74% of the copper in ore in 2014, was consistent with the prior year.
Copper Summary
mining Production - RETAINED ASSETS
The average copper grade achieved of 2.35% in 2014 was below the prior year, as lower grade contributions from the Bozymchak (1.00%) and Yubileyno-Snegirikhinsky (2.13%) mines were only partially offset by extraction from copper rich sections at the Orlovsky and Artemyevsky mines. The average copper grade at Orlovsky increased from 3.45% to 3.66% in 2014, whilst the Artemyevsky mine average copper grade increased from 1.68% to 1.78%. The average copper grade at Irtyshsky was in line with the prior year.
In Q4 2014, the average copper grade of 2.36% was above the previous quarter due to mining at higher grade zones at Artemyevsky, and the effect of lower ore output in Q4 2014 from Bozymchak, which has a copper grade of 1.00%. Bozymchak ore output in Q3 2014 was higher as sufficient material was stockpiled for use in commissioning.
PROCESSING | 12m 2014 | 12m 2013 | Q4 2014 | Q3 2014 | Q4 2013 | ||||||
Orlovsky concentrator | kt | 50.7 | 47.6 | 12.2 | 12.0 | 12.5 | |||||
Nikolayevsky concentrator | kt | 27.8 | 14.5 | 8.4 | 7.5 | 4.2 | |||||
Belousovsky concentrator | kt | 9.0 | 10.0 | 2.4 | 2.3 | 2.8 | |||||
Other concentrators1 | kt | 1.7 | 14.7 | - | - | 3.8 | |||||
Bozymchak concentrator | kt | 0.7 | - | 0.6 | 0.1 | - | |||||
Total copper in concentrate output | kt | 89.9 | 86.8 | 23.6 | 21.9 | 23.3 | |||||
Copper cathode production | kt | 83.5 | 76.8 | 24.1 | 18.3 | 22.7 | |||||
1Includes third party processing and Berezovsky concentrator, which was suspended in December 2013.
East Region copper in concentrate production in 2014 was 3% or 3.1 kt above the prior year at 89.9 kt. Copper in concentrate output benefited from an increase in recovery rates at the Nikolayevsky concentrator, rising to 88% compared to 82% in 2013. Copper in concentrate production in 2014 does not fully reflect copper in ore mined output as some ore from Artemyevsky mine was stockpiled at the Nikolayevsky concentrator, where capacity was restricted due to modernisation works that occurred mainly during H1 2014. In H2 2014, ore processing volumes were in line with ore extraction and it is expected that the Nikolayevsky concentrator will increase its capacity in 2015. The processing of ore from the Bozymchak mine is limited during the commissioning of the concentrator, with production expected to ramp up in 2015.
Copper in concentrate output in Q4 2014 increased by 8% versus Q3 2014 to 23.6 kt, reflecting a 7% increase in copper in ore mined during the quarter in the East Region, in particular at the Artemyevsky and Irtyshsky mines due to the temporary mining of higher grade sections, and the 0.7 kt contribution from the Bozymchak concentrator.
Copper cathode production of 83.5 kt was 9% above the prior year supported by an increase in copper concentrate output. The movement from the prior year was also impacted by a build-up of work in progress at the Balkhash smelter during 2013.
In Q4 2014, copper cathode production toll processed at Balkhash of 24.1 kt reflected the combined benefit of an increase in copper in concentrate production compared to Q3 2014 and the release of work in progress at the smelter.
Other Metals Summary
mining Production - RETAINED ASSETS
By-Product Production
MINING & PROCESSING | 12m 2014 | 12m 2013 | Q4 2014 | Q3 2014 | Q4 2013 | |||||
Zinc bearing ore mined | kt | 4,202 | 4,350 | 1,055 | 1,010 | 1,076 | ||||
Average zinc grade | % | 4.07 | 4.16 | 4.09 | 3.58 | 4.28 | ||||
Zinc in concentrate | kt | 121.4 | 133.8 | 32.0 | 27.7 | 34.2 | ||||
Silver bearing ore mined | kt | 4,628 | 4,350 | 1,116 | 1,260 | 1,076 | ||||
Average silver grade | g/t | 54.54 | 63.87 | 60.54 | 41.38 | 63.36 | ||||
Silver in concentrate | koz | 3,862 | 5,164 | 1,181 | 893 | 1,258 | ||||
Silver granule | koz | 3,435 | 4,685 | 805 | 962 | 1,208 | ||||
Gold bearing ore mined | kt | 4,628 | 4,350 | 1,116 | 1,260 | 1,076 | ||||
Average gold grade | g/t | 0.91 | 0.86 | 0.91 | 0.96 | 0.93 | ||||
Gold in concentrate | koz | 39.5 | 46.9 | 13.6 | 8.7 | 11.5 | ||||
Gold bar | koz | 34.6 | 48.6 | 11.2 | 5.6 | 14.5 | ||||
Zinc
Zinc in concentrate output of 121.4 kt exceeded the guidance of 115-120 kt but this was a 9% decrease year on year, due to lower grades and lower zinc bearing ore production. All East Region mines with the exception of Orlovsky had lower zinc grades compared to the prior year. Zinc in concentrate output in 2014 was also impacted by a build-up of stockpiled ore while modernisation works took place at the Nikolayevsky concentrator.
In Q4 2014, zinc in concentrate output was 32.0 kt, an increase of 16% compared to the previous quarter. This reflected higher zinc grades at the Orlovsky and Artemyevsky mines, the main contributors of zinc metal in ore mined (82%) in the East Region.
It is expected that zinc metal grades at Artemyevsky and Orlovsky will decrease in 2015 from the level achieved in 2014 as production temporarily moves to lower grade areas.
Silver
Silver in ore mined in 2014 decreased by 9% compared to the prior year, mainly reflecting a decrease in silver grade at the Artemyevsky mine from 90.8 g/t to 63.8 g/t in 2014.
In 2014, silver granule production decreased by 27% to 3,435 koz compared to the prior year due to a 25% reduction in silver in concentrate production. This was anticipated in the full year guidance of 3,300-3,700 koz. Silver in concentrate output decreased due to falling recovery rates resulting from processing of lower grade material. In the prior year the volume of silver processed was higher than silver metal in ore extracted.
In Q4 2014, output of silver granule decreased by 16% to 805 koz, reflecting the release of work in progress in Q3 2014 compared to a build-up in Q4 2014.
Other Metals Summary
mining Production - RETAINED ASSETS
It is expected that silver metal grades at Artemyevsky and Orlovsky will decrease in 2015 from the level achieved in 2014 as production temporarily moves to lower grade areas.
Gold
In 2014, gold in ore mined increased by 12% compared to the prior year, benefiting from output from the gold-rich Bozymchak mine, which was partially offset by a decrease in grade at Artemyevsky.
Gold bar production of 34.6 koz in 2014 was below guidance of 37-42 koz, reflecting the timing of the first concentrate shipment from Bozymchak. Total concentrate produced in Q4 2014 at Bozymchak contained 4 koz of gold in concentrate, none of which was processed into finished goods in 2014.
In Q4 2014, output of gold bar doubled to 11.2 koz from the 5.6 koz reported in Q3 2014, reflecting both an increase in gold in concentrate produced from the East Region and the release of work in progress at the precious metals refinery.
It is expected that gold metal grades at Artemyevsky and Orlovsky will decrease in 2015 from the level achieved in 2014 as production temporarily moves to lower grade areas.
Group Production Summary
Copper MINing
Retained Assets | |||||||||
East Region and Bozymchak | 12m 2014 | 12m 2013 | Q4 2014 | Q3 2014 | Q4 2013 | ||||
Artemyevsky | ore (kt) | 1,358 | 1,332 | 344 | 340 | 310 | |||
grade (%) | 1.78 | 1.68 | 1.86 | 1.69 | 1.72 | ||||
Irtyshsky | ore (kt) | 637 | 626 | 171 | 145 | 157 | |||
grade (%) | 1.49 | 1.49 | 1.56 | 1.46 | 1.44 | ||||
Orlovsky | ore (kt) | 1,548 | 1,557 | 390 | 376 | 392 | |||
grade (%) | 3.66 | 3.45 | 3.46 | 3.48 | 3.60 | ||||
Yubileyno-Snegirikhinsky | ore (kt) | 659 | 835 | 150 | 149 | 217 | |||
grade (%) | 2.13 | 2.30 | 2.11 | 2.13 | 2.43 | ||||
Bozymchak | ore (kt) | 426 | - | 61 | 250 | - | |||
grade (%) | 1.00 | - | 1.01 | 1.00 | - | ||||
Total Retained Assets | ore (kt) | 4,628 | 4,350 | 1,116 | 1,260 | 1,076 | |||
Average | grade (%) | 2.35 | 2.41 | 2.36 | 2.11 | 2.51 | |||
Disposal Assets |
| ||||||||
Zhezkazgan Region | 10m 2014 | 12m 2013 |
| ||||||
North | ore (kt) | 1,396 | 2,601 |
| |||||
grade (%) | 0.74 | 0.66 |
| ||||||
East (incl. West) | ore (kt) | 5,511 | 6,935 |
| |||||
grade (%) | 0.83 | 0.80 |
| ||||||
South (incl. Stepnoy) | ore (kt) | 6,903 | 8,576 |
| |||||
grade (%) | 0.71 | 0.73 |
| ||||||
Zhomart | ore (kt) | 3,147 | 3,738 |
| |||||
grade (%) | 0.98 | 1.11 |
| ||||||
Central Region |
| ||||||||
Nurkazgan West | ore (kt) | 2,570 | 3,167 |
| |||||
grade (%) | 0.71 | 0.60 |
| ||||||
Abyz | ore (kt) | - | 391 |
| |||||
grade (%) | - | 0.62 |
| ||||||
Akbastau | ore (kt) | 1,786 | 2,163 |
| |||||
grade (%) | 1.99 | 1.80 |
| ||||||
Sayak | ore (kt) | 1,275 | 1,814 |
| |||||
grade (%) | 0.95 | 0.90 |
| ||||||
Shatyrkul | ore (kt) | 536 | 646 |
| |||||
grade (%) | 1.92 | 2.24 |
| ||||||
Konyrat | ore (kt) | 3,995 | 4,810 |
| |||||
grade (%) | 0.31 | 0.30 |
| ||||||
Total Disposal Assets | ore (kt) | 27,119 | 34,841 |
| |||||
Average | grade (%) | 0.83 | 0.81 |
| |||||
Group Production Summary
Copper processing
Retained Assets
East Region | 12m 2014 | 12m 2013 | Q4 2014 | Q3 2014 | Q4 2013 | ||||
Copper concentrate | kt | 471.9 | 462.1 | 123.0 | 114.0 | 126.5 | |||
Copper in concentrate | kt | 89.2 | - | 23.0 | 21.8 | - | |||
Bozymchak | |||||||||
Copper concentrate | kt | 2.7 | - | 2.3 | 0.4 | - | |||
Copper in concentrate | kt | 0.7 | - | 0.6 | 0.1 | - | |||
Total Retained Assets | |||||||||
Copper concentrate | kt | 474.6 | 462.1 | 125.3 | 114.4 | 126.5 | |||
Copper in concentrate | kt | 89.9 | 86.8 | 23.6 | 21.9 | 23.3 | |||
Copper cathode output | kt | 83.5 | 76.8 | 24.1 | 18.3 | 22.7 | |||
Disposal Assets | |||||||||
Zhezkazgan Region | 10m 2014 | 12m 2013 | |||||||
Copper concentrate | kt | 337.8 | 435.8 | ||||||
Copper in concentrate | kt | 113.9 | 145.0 | ||||||
Central Region | |||||||||
Copper concentrate | kt | 561.2 | 624.0 | ||||||
Copper in concentrate | kt | 72.7 | 82.8 | ||||||
Total Disposal Assets | |||||||||
Copper concentrate | kt | 899.0 | 1,059.8 | ||||||
Copper in concentrate | kt | 186.6 | 227.8 | ||||||
Cathode output | |||||||||
Zhezkazgan smelter | |||||||||
Own concentrate | kt | - | 76.3 | ||||||
Balkhash smelter | |||||||||
Own concentrate | kt | 89.5 | 109.4 | ||||||
Purchased concentrate | kt | 0.1 | 1.7 | ||||||
Tolling | kt | 4.0 | 0.1 | ||||||
Copper in concentrate sold1 | kt | 81.8 | 31.5 | ||||||
Total Disposal Assets | |||||||||
Own concentrate | kt | 89.5 | 185.7 | ||||||
Cathode equivalent production1 | kt | 171.3 | 217.2 | ||||||
1Copper cathode equivalent of copper in concentrate sold.
| |||||||||
Group Production Summary
Other metals Mining - Zinc
Retained Assets
East Region | 12m 2014 | 12m 2013 | Q4 2014 | Q3 2014 | Q4 2013 | |
Artemyevsky | grade (%) | 4.04 | 4.65 | 4.61 | 3.23 | 4.04 |
Irtyshsky | grade (%) | 3.21 | 3.31 | 2.98 | 3.02 | 3.50 |
Orlovsky | grade (%) | 5.48 | 5.31 | 5.02 | 4.81 | 6.00 |
Yubileyno-Snegirikhinsky | grade (%) | 1.65 | 1.85 | 1.73 | 1.88 | 2.08 |
Average | grade % | 4.07 | 4.16 | 4.09 | 3.58 | 4.28 |
Zinc bearing ore mined | kt | 4,202 | 4,350 | 1,055 | 1,010 | 1,076 |
Zinc in concentrate | kt | 121.4 | 133.8 | 32.0 | 27.7 | 34.2 |
| ||||||
Disposal Assets | ||||||
10m 2014 | 12m 2013 | |||||
Abyz | grade (%) | - | 1.98 | |||
Akbastau | grade (%) | 1.38 | 1.16 | |||
Average | grade (%) | 1.38 | 1.28 | |||
Zinc bearing ore mined | kt | 1,786 | 2,554 | |||
Zinc in concentrate | kt | - | 0.3 | |||
Group Production Summary
Other metals Mining - Silver
Retained Assets
East Region and Bozymchak | 12m 2014 | 12m 2013 | Q4 2014 | Q3 2014 | Q4 2013 |
| ||||||||||||||||
Artemyevsky | grade (g/t) | 63.76 | 90.83 | 65.78 | 47.92 | 74.34 |
| |||||||||||||||
Irtyshsky | grade (g/t) | 49.61 | 50.78 | 55.45 | 45.85 | 55.25 |
| |||||||||||||||
Orlovsky | grade (g/t) | 74.75 | 66.81 | 79.38 | 63.84 | 79.16 |
| |||||||||||||||
Yubileyno-Snegirikhinsky | grade (g/t) | 21.60 | 25.18 | 26.20 | 18.71 | 25.00 |
| |||||||||||||||
Bozymchak | grade (g/t) | 10.07 | - | 9.34 | 9.74 | - |
| |||||||||||||||
| ||||||||||||||||||||||
Average | grade (g/t) | 54.54 | 63.87 | 60.54 | 41.38 | 63.36 |
| |||||||||||||||
Silver bearing ore mined | kt | 4,628 | 4,350 | 1,116 | 1,260 | 1,076 |
| |||||||||||||||
Silver in concentrate | koz | 3,862 | 5,164 | 1,181 | 893 | 1,258 |
| |||||||||||||||
Silver granule output | koz | 3,435 | 4,685 | 805 | 962 | 1,208 |
| |||||||||||||||
|
| |||||||||||||||||||||
Disposal Assets | ||||||||||||||||||||||
Zhezkazgan Region | 10m 2014 | 12m 2013 |
| |||||||||||||||||||
North | grade (g/t) | 6.47 | 6.98 |
| ||||||||||||||||||
East (incl. West) | grade (g/t) | 9.83 | 11.84 |
| ||||||||||||||||||
South (incl. Stepnoy) | grade (g/t) | 14.6 | 15.79 |
| ||||||||||||||||||
Zhomart | grade (g/t) | 8.48 | 9.22 |
| ||||||||||||||||||
| ||||||||||||||||||||||
Central Region |
| |||||||||||||||||||||
Nurkazgan | grade (g/t) | 2.00 | 1.44 |
| ||||||||||||||||||
Abyz | grade (g/t) | - | 19.46 |
| ||||||||||||||||||
Akbastau | grade (g/t) | 16.62 | 16.28 |
| ||||||||||||||||||
Sayak | grade (g/t) | 5.44 | 4.66 |
| ||||||||||||||||||
Shatyrkul | grade (g/t) | 2.13 | 2.02 |
| ||||||||||||||||||
Konyrat | grade (g/t) | 1.71 | 1.20 |
| ||||||||||||||||||
| ||||||||||||||||||||||
Average | grade (g/t) | 8.87 | 9.56 |
| ||||||||||||||||||
Silver bearing ore mined | kt | 27,119 | 34,841 |
| ||||||||||||||||||
Silver in concentrate1 | koz | 6,862 | 9,126 |
| ||||||||||||||||||
Silver granule output2 | koz | 2,431 | 8,272 |
| ||||||||||||||||||
Silver granule equivalent in copper concentrate sold3 | koz | 3,608 | 1,391 |
| ||||||||||||||||||
1Includes a small volume of purchased concentrate.
2Includes a small volume of by-product production from former Kazakhmys Gold's mines and slimes from purchased concentrate.
3Includes silver granule equivalent of silver in concentrate sold.
Group Production Summary
other metals Mining - gold
Retained Assets
East Region and Bozymchak | 12m 2014 | 12m 2013 | Q4 2014 | Q3 2014 | Q4 2013 | ||||||||||
Artemyevsky | grade (g/t) | 0.64 | 0.92 | 0.67 | 0.56 | 0.82 | |||||||||
Irtyshsky | grade (g/t) | 0.29 | 0.27 | 0.33 | 0.26 | 0.27 | |||||||||
Orlovsky | grade (g/t) | 1.35 | 1.27 | 1.38 | 1.25 | 1.53 | |||||||||
Yubileyno-Snegirikhinsky | grade (g/t) | 0.43 | 0.46 | 0.54 | 0.43 | 0.48 | |||||||||
Bozymchak | grade (g/t) | 1.83 | - | 1.77 | 1.79 | - | |||||||||
Average | grade (g/t) | 0.91 | 0.86 | 0.91 | 0.96 | 0.93 | |||||||||
Gold bearing ore mined | kt | 4,628 | 4,350 | 1,116 | 1,260 | 1,076 | |||||||||
Gold in concentrate | koz | 39.5 | 46.9 | 13.6 | 8.7 | 11.5 | |||||||||
Gold bar output | koz | 34.6 | 48.6 | 11.2 | 5.6 | 14.5 | |||||||||
Disposal Assets | |||||||||||||||
10m 2014 | 12m 2013 | ||||||||||||||
Nurkazgan | grade (g/t) | 0.29 | 0.27 | ||||||||||||
Abyz | grade (g/t) | - | 2.68 | ||||||||||||
Akbastau | grade (g/t) | 0.63 | 0.64 | ||||||||||||
Sayak | grade (g/t) | 0.45 | 0.22 | ||||||||||||
Shatyrkul | grade (g/t) | 0.30 | 0.35 | ||||||||||||
Average | grade (g/t) | 0.42 | 0.48 | ||||||||||||
Gold bearing ore mined | kt | 6,167 | 8,181 | ||||||||||||
Gold in concentrate1 | koz | 57.1 | 63.0 | ||||||||||||
Gold bar output2 | koz | 53.5 | 58.9 | ||||||||||||
1Includes a small volume of purchased concentrate.
2Includes slimes from purchased concentrate and a small volume from former Kazakhmys Gold's mines.
Group Production Summary
Power production
Disposal Assets
10m 2014 | 12m 2013 | |||
Net power generated1 | GWh | 4,129 | 5,723 | |
Net dependable capacity2 | MW | 832 | 843 | |
1Electricity generated and sold to customers less internal consumption and transformer losses in power stations.
2The net dependable capacity is the maximum capacity a unit can sustain over a specified period of time modified for
seasonal limitations and reduced by the capacity required for station service and auxiliaries.