Q4 and Full Year 2017 Production Report

25th Jan 2018 07:00

RNS Number : 8571C
KAZ Minerals PLC
25 January 2018
 

 

 

KAZ MINERALS PLC

6TH FLOOR

CARDINAL PLACE

100 VICTORIA STREET

LONDON SW1E 5JL

Tel: +44 (0) 20 7901 7800

 

 

 

 

25 January 2018

 

KAZ MINERALS GROUP PRODUCTION REPORT FOR 12 MONTHS AND THE fourth QUARTER ENDED 31 december 2017

 

l Full year copper production1 increased by 80% to 259 kt (FY 2016: 144 kt)

§ Copper at top of February 2017 FY guidance (225-260 kt) and in line with updated range (250-270 kt)

§ Full year gold production2 of 179 koz at upper end of guidance range (160-180 koz)

§ Q4 copper production1 of 65 kt (Q3 2017: 75 kt) reflecting expected grade reduction at Aktogay and Bozshakol concentrator maintenance

 

l Bozshakol copper production2 of 23 kt in Q4 (Q3 2017: 27 kt)

§ Full year copper production2 of 101 kt (FY 2016: 48 kt), in line with guidance of 100-110 kt

§ Gold production2 maintained at 28 koz in Q4 (Q3 2017: 28 koz), FY 2017 output of 119 koz at top of range (110-120 koz)

§ Sulphide plant throughput limited in Q4 due to 13 day stoppage for maintenance in November

§ Changes to mining sequence resulted in a reduced sulphide ore mined copper grade of 0.49% in Q4 2017 and a processed grade of 0.44% is now expected for 2018. Copper production2 at Bozshakol is expected to be in the region of 100 kt in 2018

 

l Aktogay copper production1 of 26 kt in Q4 (Q3 2017: 31 kt)

§ Full year copper production1 of 90 kt (FY 2016: 18 kt), in line with guidance of 85-95 kt

§ Main sulphide concentrator achieved 68% of design throughput in Q4

§ Oxide production of 7 kt in Q4 and 25 kt for the full year, at the top end of guidance of up to 25 kt

 

l 17 kt of copper production2 in Q4 from East Region and Bozymchak results in FY production of 67 kt

§ Ahead of FY 2017 copper production2 guidance of c.65 kt

§ Q4 zinc in concentrate output of 12 kt, full year production of 58 kt below guidance of 60-70 kt due to delayed access to high grade ore at Artemyevsky

 

1 Payable metal in concentrate and copper cathode from Aktogay oxide ore.

2 Payable metal in concentrate.

 

Andrew Southam, Chief Executive Officer, said: "I am pleased that in 2017 we achieved copper production targets across all of our assets including at Aktogay, where we launched sulphide production in February 2017 and declared the concentrator commercial in October. The performance of our two recently commissioned mines at Bozshakol and Aktogay has delivered an 80% increase in annual copper output into a tightening market and gold production at the top of our guidance range."

 

For further information please contact:

 

KAZ Minerals PLC

 

 

Chris Bucknall

Investor Relations, London

Tel: +44 20 7901 7882

Anna Mallere

Investor Relations, London

Tel: +44 20 7901 7814

Maksut Zhapabayev

Corporate Communications, Almaty

Tel: +7 727 244 03 53

Instinctif Partners

 

 

David Simonson

 

Tel: +44 20 7457 2020

 

REGISTERED OFFICE

6th Floor, Cardinal Place, 100 Victoria Street, London SW1E 5JL, United Kingdom.

NOTES TO EDITORS

KAZ Minerals PLC ("KAZ Minerals" or "the Group") is a high growth copper company focused on large scale, low cost, open pit mining in Kazakhstan. It operates the Bozshakol and Aktogay open pit copper mines in the Pavlodar and East Region of Kazakhstan, three underground mines and associated concentrators in the East Region of Kazakhstan and the Bozymchak copper-gold mine in Kyrgyzstan. In 2017, total copper production was 259 kt with by-products of 58 kt of zinc in concentrate, 179 koz of gold and 3,506 koz of silver.

The Group's new operations at Bozshakol and Aktogay have delivered one of the highest growth rates in the industry and transformed KAZ Minerals into a company dominated by world class, open pit copper mines.

Bozshakol is a first quartile asset on the global cost curve with an annual ore processing capacity of 30 million tonnes and a mine life of 40 years at a copper grade of 0.36%. The mine and processing facilities will produce an average of 100 kt of copper cathode equivalent and 120 koz of gold in concentrate per year over the first 10 years of operations.

Aktogay is a large scale, open pit mine similar to Bozshakol, with average copper grades of 0.36% (oxide) and 0.34% (sulphide) and a mine life of approximately 28 years. Aktogay commenced production of copper cathode from oxide ore in December 2015 and copper in concentrate from sulphide ore in February 2017. The operating sulphide concentrator has an annual ore processing capacity of 25 million tonnes and the sulphide processing capacity will be doubled to 50 million tonnes with the addition of a second concentrator by the end of 2021. Aktogay is competitively positioned on the global cost curve and will produce an average of 90 kt of copper per year from sulphide ore until 2021, increasing to 170 kt per year from 2022 to 2027, after the second concentrator commences operations. Copper production from oxide ore will be in the region of 20 kt per annum until 2025.

KAZ Minerals is listed on the London Stock Exchange, the Kazakhstan Stock Exchange and the Hong Kong Stock Exchange and employs around 13,000 people, principally in Kazakhstan.

This announcement contains inside information.

 

 

GROUP PRODUCTION SUMMARY

 

 

 

12m 2017

12m

2016

 

Q4 2017

Q3 2017

Q4 2016

Ore extraction

kt

64,779

49,022

 

13,399

 16,959

13,258

Ore processed

kt

41,671

15,688

 

11,417

 12,025

5,971

Average copper grade processed

%

0.71

0.98

 

0.65

 0.68

0.81

 

 

 

 

 

 

 

 

Ore to leach pads

kt

13,040

15,989

 

2,173

2,570

3,247

 

 

 

 

 

 

 

 

Copper production1

kt

 258.5

143.5

 

65.2

 75.3

44.9

Bozshakol

kt

101.3

48.0

 

22.5

 26.8

21.2

Aktogay sulphide

kt

65.1

 -

 

19.3

 23.2

-

Aktogay oxide

kt

25.1

18.1

 

6.7

 8.0

6.1

East Region & Bozymchak

kt

67.0

77.4

 

16.7

 17.3

17.6

 

 

 

 

 

 

 

 

Zinc in concentrate

kt

57.6

75.4

 

11.8

 13.5

19.2

Gold production2

koz

178.7

127.7

 

40.9

 44.8

42.0

Silver production2

koz

3,506

3,284

 

798

 952

985

1 Payable metal in concentrate and copper cathode from Aktogay oxide ore.

2 Payable metal in concentrate.

 

Copper production of 65.2 kt in the fourth quarter resulted in full year output of 258.5 kt, an 80% increase compared to the full year 2016 and in line with the raised guidance issued in the second half of 2017 of 250-270 kt. Production growth in 2017 was driven by the commencement and ramp up of copper production from the Aktogay sulphide concentrator, which started operations in February 2017 and from the ramp up of Bozshakol. Aktogay sulphide operations added 65.1 kt of new copper production, representing 57% of the increase in annual output, whilst Bozshakol grew production by 53.3 kt, to 101.3 kt.

Total ore extraction in 2017 rose by 32% to 64.8 million tonnes (FY 2016: 49.0 million tonnes) as mining operations increased to feed the Bozshakol and Aktogay concentrators. 41.7 million tonnes of ore was processed by the Group's concentrators and 13.0 million tonnes of oxide ore placed on heap leach cells at Aktogay. Approximately 10 million tonnes of clay ore was stripped to allow access to sulphide ores at Bozshakol and stockpiled for future processing at the clay plant. The average copper grade processed was 0.71% (FY 2016: 0.98%) as processing volumes from the lower grade open pit mines at Bozshakol and Aktogay increased.

The Group achieved the upper end of its full year gold guidance range with 178.7 koz of production compared to guidance of 160-180 koz. Silver production was in line with expectations at 3,506 koz (guidance 3,450-3,700 koz) but zinc in concentrate output was below guidance, at 57.6 kt (60-65 kt), due to delayed access to higher grade zones in the East Region.

In Q4 2017 ore extraction decreased to 13.4 million tonnes (Q3 2017: 17.0 million tonnes), as the quantity of clay ore required to be extracted at Bozshakol to access sulphide ore reduced significantly. Processing volumes also decreased slightly, to 11.4 million tonnes from 12.0 million tonnes in the previous quarter, primarily due to a 13 day maintenance stoppage at Bozshakol for mill relining and equipment repairs in November. The average copper grade of ore processed in the quarter reduced to 0.65% as expected (Q3 2016: 0.68%), due to the reduced proportion of supergene enriched ore processed at Aktogay and slightly lower grades at Bozshakol.

Copper production in Q4 of 65.2 kt reduced by 13% compared to 75.3 kt in the previous quarter due to the maintenance at Bozshakol and a lower average copper grade processed at Aktogay. Gold output in Q4 was lower than the previous quarter at 40.9 koz, due to reduced grades and recovery rates in the East Region and Bozymchak. Silver and zinc in concentrate production in Q4 were both impacted by low grades in the East Region during the quarter, as access to high grade areas scheduled for Q4 2017 was delayed into 2018.

 

BOZSHAKOL

 

 

 

12m 2017

12m

2016

 

Q4 2017

Q3 2017

Q4 2016

Ore extraction

kt

34,612

28,272

 

5,952

9,234

8,790

Sulphide

kt

19,540

13,387

 

5,078

5,429

4,493

Clay

kt

15,072

14,885

 

874

3,805

4,297

 

 

 

 

 

 

 

 

Ore processed

kt

 24,558

11,068

 

 6,060

6,808

4,916

 

 

 

 

 

 

 

 

Copper

 

 

 

 

 

 

 

Average copper grade processed

%

0.53

0.56

 

0.50

0.51

0.57

Copper in ore processed

kt

130.2

62.5

 

 30.1

34.5

28.1

Copper recovery rate

%

81.4

80.3

 

78.2

81.3

79.0

Copper in concentrate

kt

106.0

50.3

 

 23.5

28.1

22.2

Copper production1

kt

101.3

48.0

 

 22.5

26.8

21.2

 

 

 

 

 

 

 

 

Gold

 

 

 

 

 

 

 

Average gold grade processed

g/t

 0.28

0.33

 

 0.26

0.25

0.31

Gold recovery rate

%

57.9

58.2

 

58.8

55.5

57.1

Gold in concentrate

koz

 127.2

68.0

 

 29.8

30.2

28.4

Gold production1

koz

119.0

64.2

 

27.9

28.2

26.5

 

 

 

 

 

 

 

 

Silver production1

koz

687

304

 

 170

156

146

1 Payable metal in concentrate.

 

Ore extraction in Q4 at Bozshakol was 36% lower at 5,952 kt (Q3 2017: 9,234 kt), as the volume of clay ore extraction reduced. The quantity of clay ore required to be mined to access sulphide ore reduced to 874 kt from 3,805 kt in the previous quarter. Clay ore processing volumes of 1,027 kt in Q4 exceeded the quantity of clay ore extracted for the first time since mining operations began in 2015.

The quantity of sulphide ore extracted in Q4 reduced slightly from the previous quarter, to 5.1 million tonnes (Q3 2017: 5.4 million tonnes), in line with the requirements of the main sulphide plant.

Having achieved 93% of design capacity in Q3, average throughput in the main concentrator was temporarily lower at 80% in Q4 due to a 13 day shut down for scheduled mill relining and other repairs. The concentrator returned to 91% throughput in December and has operated at similar levels in 2018 year-to-date.

The average recovery rate at Bozshakol in Q4 2017 of 78.2% was lower than the 81.3% achieved in the previous quarter reflecting lower recovery rates at the clay plant during the period.

Copper production in Q4 of 22.5 kt was 16% below the previous quarter, primarily as a result of the shut down at the main sulphide plant. Gold production was maintained at 27.9 koz, in line with Q3 2017, as a higher average gold grade and an increase in the gold recovery rate offset the lower ore processing volumes.

In the 12 months to 31 December 2017, ore extraction at Bozshakol increased by 22% compared to 2016, to 34,612 kt. Processing volumes rose by 122%, from 11,068 kt to 24,558 kt, as the sulphide concentrator and clay plant ramped up. As expected, the average copper grade processed reduced from 0.56% in 2016 to 0.53% in 2017.

Full year copper production at Bozshakol in 2017 was in line with guidance of 100-110 kt, at 101.3 kt. Gold production in Q4 of 27.9 koz resulted in full year output of 119.0 koz, at the upper end of guidance of 110-120 koz, supported by high gold grades throughout the year and an improvement in recovery rates in Q4 2017. Silver output of 687 koz was 6% above full year guidance of approximately 650 koz.

Changes to the mining sequence have resulted in a reduced sulphide ore mined copper grade of 0.49% in Q4 2017 and a revised forecast of 0.44% for FY 2018. Copper production at Bozshakol is now expected to be in the region of 100 kt in 2018. Further details on production guidance for 2018 will be given with the 2017 full year results on 22 February 2018.

 

AKTOGAY

 

 

 

12m 2017

12m

2016

 

Q4 2017

Q3 2017

Q4 2016

Ore extraction

kt

 26,248

16,086

 

 6,470

6,756

3,344

Oxide

kt

13,040

15,989

 

2,173

2,570

3,247

Sulphide

kt

13,208

97

 

4,297

4,186

97

 

 

 

 

 

 

 

 

Oxide

 

 

 

 

 

 

 

Oxide ore to leach pads

kt

13,040

15,989

 

2,173

2,570

3,247

Grade

%

0.36

0.41

 

0.29

0.27

0.43

Copper cathode

kt

 25.1

18.1

 

 6.7

8.0

6.1

 

 

 

 

 

 

 

 

Sulphide

 

 

 

 

 

 

 

Sulphide ore processed

kt

 12,941

-

 

 4,265

4,102

-

Average grade processed

%

0.66

-

 

0.58

0.65

-

Recovery rate

%

79.6

-

 

81.6

90.7

-

Copper in concentrate

kt

68.2

-

 

20.2

24.3

-

Copper production1

kt

65.1

-

 

19.3

23.2

-

 

 

 

 

 

 

 

 

Total copper production

kt

90.2

18.1

 

26.0

31.2

6.1

1 Payable metal in concentrate.

Ore extraction at Aktogay of 6,470 kt in Q4 represents a 4% decrease compared to the previous quarter, with oxide extraction reducing by 15% to match the requirements of the heap leaching operation and sulphide ore extraction increasing by 3% in line with the ramp up of the sulphide concentrator.

Commercial levels of copper production from the sulphide plant were declared at the beginning of October and throughput was increased to 68% in Q4 from 66% in Q3 2017. As expected, the grade of sulphide ore processed decreased from 0.65% in Q3 2017 to 0.58% in Q4, as the proportion of supergene enriched ore reduced. The lower copper grade processed in Q4 also saw recovery rates reduce from the elevated levels of 90.7% in Q3 to 81.6% in Q4 2017, a more typical recovery rate for this stage of the ramp up. Copper production from sulphide ore therefore reduced to 19.3 kt in Q4, from 23.2 kt in the previous quarter.

At the oxide operations, the grade of ore placed on leach pads was 0.29%, in line with the previous quarter. Seasonally lower temperatures in Q4 resulted in copper cathode output of 6.7 kt, a reduction of 16% from the previous quarter but an increase of 10% compared to Q4 2016.

Full year ore extraction increased by 63% compared to 2016, to 26,248 kt, with 100% of oxide ore mined placed on leach pads and 98% of sulphide ore mined processed through the concentrator during the year.

The sulphide concentrator remains on track to achieve 100% of design capacity in 2018, as guided. Copper production from sulphide ore of 65.1 kt, combined with 25.1 kt of copper cathode from oxide ore, resulted in full year copper production of 90.2 kt, in line with the guidance range of 85-95 kt. 

EAST REGION & BOZYMCHAK

Copper

 

 

12m 2017

12m

2016

 

Q4 2017

Q3 2017

Q4 2016

Ore extraction

kt

3,919

4,664

 

977

969

1,124

 

 

 

 

 

 

 

 

Ore processed

kt

4,172

4,620

 

1,092

1,115

1,055

Orlovsky concentrator

kt

 1,067

1,262

 

272

249

290

 

grade (%)

3.60

3.66

 

3.32

3.63

3.88

Nikolayevsky concentrator

kt

 1,460

1,673

 

415

451

362

 

grade (%)

1.49

1.51

 

1.46

1.50

1.31

Belousovsky concentrator

kt

636

651

 

160

159

160

 

grade (%)

1.54

1.54

 

1.51

1.51

1.52

Bozymchak concentrator

kt

 1,009

1,034

 

245

256

243

 

grade (%)

0.89

0.88

 

0.88

0.89

0.88

Average grade processed

%

1.89

1.96

 

1.80

1.84

1.95

Average recovery rate

%

90.0

89.6

 

90.1

89.4

90.3

 

 

 

 

 

 

 

 

Copper in concentrate

kt

71.0

81.0

 

17.8

18.3

18.6

Orlovsky concentrator

kt

34.9

41.7

 

8.2

8.2

10.4

Nikolayevsky concentrator

kt

19.6

22.5

 

5.5

6.1

4.2

Belousovsky concentrator

kt

8.5

8.6

 

2.1

2.0

2.1

Bozymchak concentrator

kt

8.0

8.2

 

2.0

2.0

1.9

 

 

 

 

 

 

 

 

Copper production1

kt

67.0

77.4

 

16.7

17.3

17.6

1 Payable metal in concentrate.

Ore extraction in the East Region and Bozymchak was in line with the previous quarter at 977 kt (Q3 2017: 969 kt). The 1,092 kt of ore processed exceeded mined volumes, as the Nikolayevsky concentrator processed a small volume of stockpiled ore. The average copper grade of ore processed was slightly lower than the previous quarter at 1.80% (Q3 2017: 1.84%), with quarterly copper in concentrate production and copper production both 3% lower as a result, at 17.8 kt and 16.7 kt respectively (Q3 2017 copper production: 17.3 kt).

In the 12 months to 31 December 2017, ore extraction volumes were 16% below the prior year, mainly due to the closure of the Yubileyno-Snegirikhinsky mine at the end of 2016. The average copper grade of ore processed reduced to 1.89% from 1.96% in the prior year, as grades were lower at Orlovsky and Nikolayevsky. Processing volumes reduced in line with lower mining output to 4,172 kt from 4,620 kt, resulting in copper production of 67.0 kt (2016: 77.4 kt), ahead of full year group guidance of c.65 kt. Bozymchak performed at full design capacity during the year, producing 8.0 kt copper (FY 2016: 8.2 kt).

 

By-products

Zinc

 

12m 2017

12m

2016

 

Q4 2017

Q3 2017

Q4 2016

Zinc bearing ore processed

kt

 3,163

3,586

 

847

859

812

Average grade processed

%

2.65

2.95

 

2.19

2.40

3.21

Average recovery rate

%

68.6

71.3

 

63.6

65.3

73.4

Zinc in concentrate

kt

57.6

75.4

 

11.8

13.5

19.2

 

 

 

 

 

 

 

 

Gold

 

 

 

 

 

 

 

Gold bearing ore processed

kt

4,172

4,620

 

1,092

1,115

1,055

Average grade processed

g/t

0.76

0.81

 

0.65

0.77

0.83

Average recovery rate

%

61.3

56.1

 

61.0

62.6

58.4

Gold in concentrate

koz

62.7

67.6

 

13.9

17.2

16.5

Gold production1

koz

58.9

63.5

 

13.0

16.2

15.5

 

 

 

 

 

 

 

 

Silver

 

 

 

 

 

 

 

Silver bearing ore processed

kt

4,172

4,620

 

1,092

1,115

1,055

Average grade processed

g/t

33.6

37.6

 

28.3

34.9

41.9

Average recovery rate

%

62.1

57.7

 

60.8

63.1

64.8

Silver in concentrate

koz

 2,801

3,224

 

603

789

922

Silver production1

koz

2,549

2,980

 

549

718

839

1 Payable metal in concentrate.

Zinc bearing ore volumes in Q4 were in line with the previous quarter at 847 kt (Q3 2017: 859 kt) but continued low zinc grades of 2.19% resulted in zinc in concentrate output of 11.8 kt, down from 13.5 kt in the previous quarter. Access to higher zinc grades at Artemyevsky which was expected to occur in the second half of 2017 is now delayed until 2018. Lower than expected grades at Orlovsky also contributed to the decline, with full year zinc in concentrate output of 57.6 kt, below the guidance range of 60-65 kt.

Gold bearing ore processing volumes in Q4 were in line with Q3 2017, though a lower average grade of 0.65 g/t led to a 20% reduction in gold production to 13.0 koz, from 16.2 koz in the previous quarter. However, full year gold production was at the top end of the guidance range of 50-60 koz, driven by strong output of 41.3 koz from the Bozymchak mine which more than offset the effect of lower grades in the East Region.

Silver production of 2,549 koz was slightly below guidance of 2,600-2,850 koz due to lower silver grades in Q4, which were impacted by the delayed access to high by-product grade areas at Artemyevsky.

 

APPENDIX - GROUP PRODUCTION SUMMARY

Copper mining & processing

 

 

12m 2017

12m

2016

 

Q4 2017

Q3 2017

Q4 2016

Ore extraction

kt

64,779

49,022

 

13,399

16,959

 13,258

Bozshakol

kt

34,612

28,272

 

5,952

9,234

 8,790

Aktogay

kt

26,248

16,086

 

6,470

6,756

3,344

East Region

kt

 2,998

 3,729

 

 752

 743

 905

Bozymchak

kt

 921

 935

 

 225

 226

 219

Average grade mined

%

0.61

0.66

 

0.57

0.59

0.67

Copper in ore mined

kt

395.1

324.2

 

76.8

99.6

88.6

 

 

 

 

 

 

 

 

Ore processed

kt

41,671

15,688

 

11,417

12,025

5,971

Bozshakol

kt

24,558

11,068

 

6,060

6,808

4,916

Aktogay (sulphide)

kt

12,941

 -

 

 4,265

 4,102

 -

East Region

kt

3,163

3,586

 

847

859

812

Bozymchak

kt

1,009

1,034

 

245

256

243

Average grade processed

%

0.71

0.98

 

0.65

0.68

0.81

Bozshakol

%

0.53

0.56

 

0.50

0.51

0.57

Aktogay (sulphide)

%

0.66

 -

 

0.58

0.65

 -

East Region

%

2.21

2.27

 

2.07

2.12

2.27

Bozymchak

%

0.89

0.88

 

0.88

0.89

0.88

Copper in ore processed

kt

294.8

153.0

 

74.5

81.8

48.7

Bozshakol

kt

130.2

62.5

 

30.1

34.5

28.1

Aktogay (sulphide)

kt

85.7

 -

 

24.7

26.8

-

East Region

kt

69.9

81.4

 

17.5

18.2

18.5

Bozymchak

kt

9.0

9.1

 

2.2

2.3

2.1

Average recovery rate

%

83.2

85.8

 

82.5

86.4

83.8

Bozshakol

%

81.4

80.3

 

78.2

81.3

 79.0

Aktogay (sulphide)

%

79.6

 -

 

81.6

90.7

 - 

East Region

%

90.1

89.4

 

90.3

89.4

90.4

Bozymchak

%

89.0

90.6

 

88.1

89.6

89.7

 

 

 

 

 

 

 

 

Aktogay oxide ore to leach pads

kt

13,040

15,989

 

2,173

2,570

3,247

Grade

%

0.36

0.41

 

0.29

0.27

0.43

 

Copper production

Bozshakol

 

12m 2017

12m

2016

 

Q4 2017

Q3 2017

Q4 2016

Copper concentrate

kt

 480.8

 214.4

 

 110.0

 127.1

 97.1

Copper in concentrate

kt

 106.0

 50.3

 

 23.5

 28.1

 22.2

Aktogay Sulphide

 

 

 

 

 

 

 

Copper concentrate

kt

 298.6

 - 

 

 95.9

 108.2

 - 

Copper in concentrate

kt

 68.2

 - 

 

20.2

 24.3

 - 

East Region

 

 

 

 

 

 

 

Copper concentrate

kt

308.5

 366.4

 

 83.1

 76.0

 86.3

Copper in concentrate

kt

63.0

 72.8

 

 15.8

 16.3

 16.7

Bozymchak

 

 

 

 

 

 

 

Copper concentrate

kt

 33.9

 33.9

 

 8.3

 8.6

 8.2

Copper in concentrate

kt

 8.0

 8.2

 

 2.0

 2.0

 1.9

 

 

 

 

 

 

 

 

Total copper concentrate

kt

1,121.8

 614.7

 

 297.3

 319.9

 191.6

Total copper in concentrate

kt

 245.2

 131.3

 

61.5

 70.7

 40.8

 

 

 

 

 

 

 

 

Copper production1

kt

258.5

 143.5

 

 65.2

 75.3

 44.9

Bozshakol

kt

 101.3

 48.0

 

 22.5

 26.8

 21.2

Aktogay sulphide

kt

 65.1

 - 

 

 19.3

 23.2

 - 

Aktogay oxide

kt

 25.1

 18.1

 

 6.7

 8.0

 6.1

East Region

kt

 59.5

 69.5

 

 14.9

 15.4

 15.8

Bozymchak

kt

 7.5

 7.9

 

 1.8

 1.9

 1.8

 

 

 

 

 

 

 

 

Copper cathodes

kt

112.5

92.9

 

 26.7

 31.4

 22.9

Bozshakol (toll processed)

kt

 10.0

 - 

 

 0.7

 4.7

 - 

Aktogay sulphide (toll processed)

kt

 9.3

 - 

 

 0.4

 4.8

 - 

Aktogay oxide

kt

 25.1

 18.1

 

 6.7

 8.0

 6.1

East Region (toll processed)

kt

 60.1

 68.5

 

 17.5

 11.4

 15.5

Bozymchak (toll processed)

kt

 8.0

 6.3

 

 1.4

 2.5

 1.3

         

1 Payable metal in concentrate and copper cathode from Aktogay oxide ore.

 

Zinc 

 

 

12m 2017

12m

2016

 

Q4 2017

Q3 2017

Q4 2016

Zinc bearing ore mined

kt

2,998

3,729

 

752

743

905

Orlovsky

kt

1,065

1,260

 

266

254

287

Artemyevsky

kt

1,305

1,309

 

328

332

323

Irtyshsky

kt

628

632

 

158

157

159

Yubileyno-Snegirikhinsky

kt

 -

528

 

-

 -

136

Zinc bearing ore processed

kt

3,163

3,586

 

847

859

812

Orlovsky concentrator

kt

1,067

1,262

 

272

249

290

 

grade (%)

3.42

4.38

 

2.87

3.01

4.38

Nikolayevsky concentrator

kt

1,460

1,673

 

415

451

362

 

grade (%)

1.76

1.80

 

1.31

1.71

2.20

Belousovsky concentrator

kt

636

651

 

160

159

160

 

grade (%)

3.43

3.11

 

3.31

3.40

3.37

Average grade processed

%

2.65

2.95

 

2.19

2.40

3.21

 

 

 

 

 

 

 

 

Zinc metal in ore processed

kt

84.0

105.8

 

18.6

20.6

26.1

Orlovsky concentrator

kt

36.5

55.3

 

7.8

7.5

12.7

Nikolayevsky concentrator

kt

25.7

30.2

 

5.4

7.7

8.0

Belousovsky concentrator

kt

21.8

20.3

 

5.4

5.3

5.4

Average recovery rate

%

68.6

71.3

 

63.6

65.3

73.4

Orlovsky concentrator

%

64.5

71.8

 

58.7

52.8

72.4

Nikolayevsky concentrator

%

72.8

72.2

 

63.6

73.6

76.9

Belousovsky concentrator

%

70.6

68.5

 

70.9

70.9

70.8

 

 

 

 

 

 

 

 

Zinc in concentrate

kt

57.6

75.4

 

11.8

13.5

19.2

Orlovsky concentrator

kt

23.5

39.7

 

4.5

4.0

9.2

Nikolayevsky concentrator

kt

18.7

21.8

 

3.5

5.7

6.1

Belousovsky concentrator

kt

15.4

13.9

 

3.8

3.8

3.9

 

Gold

 

 

12m 2017

12m 2016

 

Q4 2017

Q3 2017

Q4 2016

 

Gold bearing ore mined

kt

38,531

32,936

 

6,929

10,203

9,914

 

Bozshakol

kt

34,612

28,272

 

5,952

9,234

8,790

 

East Region

kt

2,998

3,729

 

752

743

905

 

Bozymchak

kt

 921

935

 

225

226

219

 

Gold bearing ore processed

kt

28,730

15,688

 

7,152

7,923

5,971

 

Bozshakol

kt

24,558

11,068

 

6,060

6,808

4,916

 

 

grade (g/t)

0.28

0.33

 

0.26

0.25

0.31

 

East Region

kt

3,163

3,586

 

847

859

812

 

 

grade (g/t)

0.48

0.56

 

0.38

0.49

0.58

 

Bozymchak

kt

1,009

1,034

 

245

256

243

 

 

grade (g/t)

1.64

1.68

 

1.58

1.68

1.66

 

Average grade processed

g/t

0.35

0.47

 

0.32

0.32

0.41

 

 

 

 

 

 

 

 

 

 

Gold in ore processed

koz

322.1

237.4

 

73.3

81.9

77.9

 

Bozshakol

koz

219.9

117.0

 

50.6

54.4

49.7

 

East Region

koz

48.8

64.7

 

10.3

13.6

15.3

 

Bozymchak

koz

53.4

55.7

 

12.4

13.9

12.9

 

Average recovery rate

%

59.0

57.1

 

59.5

57.9

57.6

 

Bozshakol

%

57.9

58.2

 

58.8

55.5

57.1

 

East Region

%

38.4

33.6

 

37.2

41.0

38.4

 

Bozymchak

%

82.4

82.2

 

80.8

83.8

82.1

 

Gold in concentrate

koz

189.9

135.6

 

43.7

47.4

44.9

Bozshakol

koz

127.2

68.0

 

29.8

30.2

28.4

East Region

koz

18.7

21.8

 

3.8

5.6

5.9

Bozymchak

koz

44.0

45.8

 

10.1

11.6

10.6

 

 

 

 

 

 

 

 

Gold production1

koz

178.7

127.7

 

40.9

44.8

42.0

Bozshakol

koz

119.0

64.2

 

27.9

28.2

26.5

Aktogay (sulphide) 2

koz

0.8

 - 

 

 - 

0.4

 - 

East Region

koz

17.6

20.4

 

3.6

5.2

5.5

Bozymchak

koz

41.3

43.1

 

9.4

11.0

10.0

 

 

 

 

 

 

 

 

Gold bar produced (toll processed)

koz

73.1

55.1

 

20.8

23.7

14.1

Bozshakol

koz

10.4

 -

 

1.6

5.2

 -

Aktogay (sulphide)2

koz

0.8

 -

 

0.4

0.4

 -

East Region

koz

18.0

21.5

 

5.3

5.7

4.7

Bozymchak

koz

43.9

33.6

 

13.5

12.4

9.4

           

1 Payable metal in concentrate.

2 Minimal volume recovered from Aktogay material.

 

Silver

 

 

12m 2017

12m

2016

 

Q4 2017

Q3 2017

Q4 2016

Silver bearing ore mined

kt

38,531

32,936

 

6,929

10,203

9,914

Bozshakol

kt

34,612

28,272

 

5,952

9,234

8,790

East Region

kt

2,998

3,729

 

752

743

905

Bozymchak

kt

921

935

 

225

226

219

Silver bearing ore processed

kt

28,730

15,688

 

7,152

7,923

5,971

Bozshakol

kt

24,558

11,068

 

6,060

6,808

4,916

 

grade (g/t)

1.46

1.64

 

1.47

1.22

1.66

East Region

kt

3,163

3,586

 

847

859

812

 

grade (g/t)

40.8

45.1

 

33.4

41.9

51.5

Bozymchak

kt

1,009

1,034

 

245

256

243

 

grade (g/t)

11.2

11.6

 

10.4

11.3

10.0

Average grade processed

g/t

6.1

12.2

 

5.6

6.0

8.8

 

 

 

 

 

 

 

 

Silver in ore processed

koz

5,659

6,171

 

1,279

1,518

1,685

Bozshakol

koz

1,149

585

 

286

268

262

East Region

koz

4,147

5,201

 

911

1,156

1,345

Bozymchak

koz

363

385

 

82

94

78

Average recovery rate

%

63.0

57.7

 

61.8

63.4

64.3

Bozshakol

%

66.4

57.8

 

65.8

64.8

61.9

East Region

%

60.9

56.3

 

59.4

62.1

64.1

Bozymchak

%

75.4

77.0

 

75.3

75.0

77.3

Silver in concentrate

koz

3,564

3,562

 

791

962

1,084

Bozshakol

koz

763

338

 

188

173

162

East Region

koz

2,527

2,928

 

541

719

862

Bozymchak

koz

274

296

 

62

70

60

 

 

 

 

 

 

 

 

Silver production1

koz

3,506

3,284

 

798

952

985

Bozshakol

koz

687

304

 

170

156

146

Aktogay (sulphide)2

koz

270

 -

 

79

78

 -

East Region

koz

2,300

2,705

 

493

654

784

Bozymchak

koz

249

275

 

56

64

55

 

 

 

 

 

 

 

 

Silver bar produced (toll processed)

koz

2,843

2,757

 

871

602

726

Bozshakol

koz

53

 -

 

8

26

 -

Aktogay (sulphide)2

koz

41

 -

 

7

15

 -

East Region

koz

2,473

2,538

 

785

488

666

Bozymchak

koz

276

219

 

71

73

60

         

1 Payable metal in concentrate.

2 Minimal volume recovered from Aktogay material.

This information is provided by RNS