Q3 Production Report and IMS

30th Oct 2014 07:00

RNS Number : 6546V
Kazakhmys PLC
30 October 2014
 



 

30 October 2014

 

 

Kazakhmys PLC Production Report for NINE MONTHS AND the Third Quarter Ended 30 september 2014 and Interim Management Statement

 

l East Region and Bozymchak - Retained Assets

§ Copper cathode output of 59 kt for the nine months, 10% above the prior year period

§ Output benefited from the Nikolayevsky modernisation programme which raised the concentrator recovery rate from 80% to 88%

§ Retained Assets remain on track to achieve 2014 full year copper cathode production guidance of 80 kt to 85 kt

§ Zinc in concentrate output of 89 kt, silver output of 2,630 koz, both in line with expectations for full year target

§ Gold output of 23 koz for the first nine months, full year output should include a contribution from Bozymchak, dependent on the timing of processing at the Balkhash smelter

 

l Restructuring

§ Approved by independent shareholders on 15 August 2014

§ Economic separation of the Disposal Assets effective from 1 August 2014

§ Regulatory consents obtained, transaction expected to complete imminently

 

Oleg Novachuk, Chief Executive, said: "Our Retained Assets in the East Region are on track to deliver the copper production guidance for 2014. Output of concentrate from Bozymchak has commenced and we anticipate the first shipment of concentrate from Bozymchak to Balkhash for processing to be dispatched in November. Meanwhile I am pleased to report that regulatory consents for the restructuring have been obtained. We are now very close to the completion of the transaction and with it the creation of KAZ Minerals, a high growth copper company focused on large scale, low cost open pit mining in Kazakhstan."

  

For further information please contact:

 

Kazakhmys PLC

Chris Bucknall

Investor Relations, London

Tel: +44 20 7901 7882

Maria Babkina

Corporate Communications, London

Tel: +44 20 7901 7849

Irene Burton

Financial Analyst, London

Tel: +44 20 7901 7814

Maksut Zhapabayev

Corporate Communications, Almaty

Tel: +727 2440 353

Instinctif Partners

David Simonson

Tel: +44 20 7457 2020

Anca Spiridon

Tel: +44 20 7457 2020

Hill & Knowlton Hong Kong

 

K W Lam

Tel: +852 2894 6321

 

REGISTERED OFFICE

6th Floor, Cardinal Place, 100 Victoria Street, London SW1E 5JL, United Kingdom.

Notes to Editors

Kazakhmys PLC is a leading international natural resources group. It is the largest copper producer in Kazakhstan and one of the top worldwide with 16 operating mines, seven concentrators and a copper smelter. Kazakhmys Mining has a full range of facilities enabling it to process ore extracted through to finished metal. Total copper cathode equivalent output from own ore was 294 kt in 2013. The Group has two major copper projects under construction.

 

Kazakhmys Mining produces significant volumes of other metals, including zinc, silver and gold. In 2013, it produced 134 kt of zinc in concentrate. The Group is amongst the largest global silver producers with output of 14 Moz in 2013.

 

Kazakhmys Power operates three captive power stations which supply electricity to Kazakhmys Mining and third parties. In 2013, net power generated by captive power stations was 5,723 GWh.

 

The Group is listed on the London Stock Exchange, the Kazakhstan Stock Exchange and the Hong Kong Stock Exchange. It had revenues from continuing operations of $3.1 billion in 2013 and a Group EBITDA of $1.1 billion. The Group employs around 53,000 people, principally in Kazakhstan.

 

Group Restructuring

 

In February 2014, the Group announced plans for a potential restructuring of its business to improve profitability and cash returns.

 

On 23 July 2014, Kazakhmys made a further announcement on its proposed restructuring, having entered into an agreement to transfer certain mature assets in the Zhezkazgan and Central Regions (the "Disposal Assets") to Cuprum Netherlands Holding B.V., a company owned by Vladimir Kim and Eduard Ogay. The transaction was approved by independent shareholders on 15 August 2014 and completion is expected imminently.

 

Following completion of the transaction, the Group will continue to own the mining and producing assets in the East Region and the Bozymchak mine in Kyrgyzstan, as well as the major growth projects Bozshakol, Aktogay and Koksay (the "Retained Assets"). The Company will be renamed KAZ Minerals PLC upon completion.

 

Copper Summary

Kazakhmys mining Production - Retained assets

East Region and Bozymchak

Production Summary

9m

2014

9m

2013

Q3

2014

Q2

2014

Q3

 2013

Ore extraction1

kt

3,147

3,274

1,010

1,093

1,104

Average copper grade

%

2.50

2.37

2.39

2.50

2.41

Copper concentrate2

kt

348.9

335.6

114.0

115.8

121.2

Copper in concentrate2

kt

66.3

63.5

21.9

22.3

22.6

Copper cathode production

kt

59.4

54.1

18.3

19.9

18.1

1 Excludes ore output from the Bozymchak mine.

2 Includes own material processed by third parties.

 

In the first nine months of 2014, copper cathode production in the East Region was 59.4 kt, a 10% increase compared to the corresponding period in 2013. This rise in production partly reflects a 4% growth in copper in concentrate output and also that the prior year period was impacted by a build up of work in progress at the Balkhash smelter.

 

In Q3 2014 copper cathode output of 18.3 kt was 8% below Q2 2014 mainly due to an increase in work in progress at the Balkhash smelter at the end of September 2014, as well as a 2% decrease in copper concentrate production in the quarter.

 

Overall copper cathode production for the East Region and Bozymchak remains on target to meet the Group's guidance of 80 kt to 85 kt for 2014.

 

Copper Production Detail

 

MINING

9m

2014

9m

2013

Q3

2014

Q2

2014

Q3

 2013

Artemyevsky

ore (kt)

1,014

1,021

340

350

341

grade (%)

1.76

1.67

1.69

1.78

1.48

Irtyshsky

ore (kt)

466

469

145

159

165

grade (%)

1.46

1.51

1.46

1.49

1.48

Orlovsky

ore (kt)

1,158

1,166

376

400

384

grade (%)

3.73

3.39

3.48

3.83

3.77

Yubileyno-Snegirikhinsky

ore (kt)

509

618

149

184

214

grade (%)

2.13

2.26

2.13

1.88

2.18

Total

ore (kt)

3,147

3,274

1,010

1,093

1,104

Overall average

grade (%)

2.50

2.37

2.39

2.50

2.41

 

 

In the first nine months of 2014, ore extraction in the East Region was 4% below the comparative period, mainly due to lower extraction volumes at the mature Yubileyno-Snegirikhinsky mine. Mining is expected to cease at Yubileyno-Snegirikhinsky in the next two years due to the depletion of reserves. Output from the region's three other operating mines was in line with the prior year period.

 

Ore extraction in Q3 2014 was 8% lower than Q2 2014 due to the continuing decline in output at the mature Yubileyno-Snegirikhinsky mine and some minor equipment

Copper Summary

Kazakhmys mining Production - Retained assets (Continued)

downtime across the other mines in the region. There was a 12% decrease in metal in ore mined in Q3 2014 compared to Q2 2014, mainly due to lower copper grade (3.48% versus 3.83%) and ore extraction at the Orlovsky mine.

 

The average copper grade achieved in the first nine months of 2014 was 2.50%, above the 2.37% in the comparative period in 2013, as higher grade sections were exploited at the Orlovsky mine in the first half of the year. As indicated in our Q2 2014 production report, the average copper grade for Q3 2014 at the Orlovsky mine reduced, from 3.83% in the first half of 2014 to 3.48%. The change in extraction area at Orlovsky was the main reason for the lower average copper grade for the region during Q3 2014. It is expected that the copper grade at the Orlovsky mine will continue to decline in Q4 2014 but will remain above 3%.

 

PROCESSING

9m

2014

9m

2013

Q3

2014

Q2

2014

Q3

 2013

Orlovsky concentrator

kt

38.6

35.1

12.0

13.3

12.8

Nikolayevsky concentrator

kt

19.4

10.3

7.5

6.0

3.9

Belousovsky concentrator

kt

6.6

7.2

2.3

2.3

2.5

Berezovsky concentrator

kt

-

5.6

-

-

1.9

Third party processing

kt

1.7

5.3

-

0.7

1.5

Total copper in concentrate output

kt

66.3

63.5

21.8

22.3

22.6

Copper cathode production

kt

59.4

54.1

18.3

19.9

18.1

 

The 4% increase in copper in concentrate production to 66.3 kt in the first nine months of 2014 reflects an increase in metal in ore mined and higher concentrator recovery rates. The recovery rate achieved at the Nikolayevsky concentrator was 88% in the first nine months of 2014 compared to 80% in the corresponding period in 2013. The Nikolayevsky concentrator is undergoing a modernisation programme raising both recovery rates and its throughput capacity. However, work at the concentrator does restrict processing from time to time and around 2.0 kt of copper in ore mined was stockpiled at Nikolayevsky as at 30 September 2014, largely due to a build up in Q2 2014. Some of this stockpiled material may not be processed until 2015.

 

In H1 2014, 1.7 kt of copper in concentrate was produced from ore mined in the East Region by a third party. As the Nikolayevsky concentrator is operating at improved recovery rates and once its modernisation programme is completed it will have an increased capacity, no shipments of ore for third party processing were made in Q3 2014.

 

In December 2013 the Berezovsky concentrator, which processed ore from Irtyshsky mine, was suspended. Ore from Irtyshsky mine is now sent to the Belousovsky concentrator together with 16% of the ore from the Yubileyno-Snegirikhinsky mine, raising utilisation levels at that concentrator.

 

Copper in concentrate production in Q3 2014 decreased by only 2% versus Q2 2014, despite a 12% decrease in metal in ore mined, due to stockpiling of ore in Q2 2014.

 

Bozymchak Project (Kyrgyzstan)

The first copper concentrate output from the mine was produced in October and optimisation of equipment is being carried out across all processing stages in preparation for ramp up to commercial production levels.

 

Copper Summary

Kazakhmys mining Production - Retained assets (Continued)

In the first nine months of 2014, 365 kt of ore has been extracted, including 250 kt in Q3 2014. At the end of September 2014, 807 kt of ore had been stockpiled, containing approximately 8.2 kt of copper and 52.1 koz of gold.

 

A shipment of concentrate to the Balkhash smelter is expected in November 2014 but dependent on the timing of processing this may not be recognised as finished goods until the beginning of 2015.

 

By-Product Production

 

PROCESSING

9m

2014

9m

2013

Q3

2014

Q2

2014

Q3

 2013

Average zinc grade

%

4.07

4.11

3.58

3.96

4.36

Zinc in concentrate

kt

89.4

99.6

27.7

30.0

36.5

Average silver grade

g/t

57.57

64.04

49.16

59.56

71.64

Silver in concentrate

koz

2,678

3,906

890

888

1,514

Silver

koz

2,630

3,477

962

717

1,053

Average gold grade

g/t

0.80

0.84

0.75

0.81

0.94

Gold in concentrate

koz

25.3

35.4

8.1

8.3

13.0

Gold

koz

23.3

34.1

5.6

7.7

12.2

 

Zinc

In the first nine months of 2014, zinc in concentrate output decreased by 10% to 89.4 kt, resulting from a combination of lower ore extraction volumes and lower grade compared to the corresponding prior year period. A decrease in zinc grade at the Artemyevsky and Yubileyno-Snegirikhinsky mines was partially offset by a higher zinc grade at the Orlovsky mine. Output in the first nine months of 2014 was also impacted by a build up in stockpiled material, in particular at the Nikolayevsky concentrator, some of which may not be processed until 2015.

 

In Q3 2014, zinc in concentrate output reduced by 8% to 27.7 kt from the previous quarter, reflecting the lower volumes of zinc metal in ore mined, mainly due to the decrease in average zinc grade during the quarter at the Orlovsky and Artemyevsky mines.

 

Zinc in concentrate production remains on target to achieve the full year guidance of 115 kt to 120 kt.

 

Silver

Silver metal in ore mined in the first nine months of 2014 was 14% below the comparative period in the prior year, largely due to lower silver grades at the Artemyevsky mine.

 

In the first nine months of 2014, silver in concentrate output was 31% below the comparative period in 2013, with a 23% decline in the volume of silver in ore processed due to output from stockpiled ore in 2013 and a decrease in recovery rates resulting from the processing of lower grade ore. Silver output decreased by 24% to 2,630 koz, reflecting lower silver in concentrate production and a higher release of work in progress when compared to the prior year period.

Copper Summary

Kazakhmys mining Production - Retained assets (Continued)

In Q3 2014, silver in concentrate output was in line with the prior quarter despite a 24% decrease in silver metal in ore mined, as there was a build up of stockpiles in the previous quarter. The output of silver bar and granule in Q3 2014 was 34% above Q2 2014 after a release of work in progress at the precious metals refinery.

 

Silver output remains on target to achieve the full year guidance of 3,300 koz to 3,700 koz.

 

Gold

In the first nine months of 2014, the gold in ore mined decreased by 8%, mainly as a consequence of the lower gold grade reported at Artemyevsky mine compared to the prior year period in 2013. There was a 28% decrease in gold in concentrate output, reflecting a combination of processing stockpiled ore in 2013 and a decrease in recovery rates during the first nine months of 2014 resulting from the lower grade material.

 

Gold metal output was 23.3 koz, 32% below the production achieved in the first nine months of 2013, due to the lower gold in concentrate output in the reporting period and build up of work in progress at the end of September 2014.

 

Whilst gold in ore mined decreased by 14% in Q3 2014 compared to Q2 2014, the gold in concentrate output was only 2% below the prior quarter, as a result of the stockpiling of ore in Q2 2014. The output of gold in Q3 2014 decreased by 2.1 koz from the previous quarter to 5.6 koz due to an increase in material at the smelter and precious metals refinery which will be processed in the fourth quarter.

 

The ramp up of Bozymchak, and the timing of processing of concentrate produced there, will be a key factor in achieving the Group's gold production guidance for the Retained Assets of 37 koz to 42 koz for 2014.

 

Copper Summary

Kazakhmys MINING Production - disposal assets

ZHEZKAZGAN AND CENTRAL REGION

 

 

9m

2014

9m

2013

Q3

2014

Q2

2014

Q3

 2013

Ore extraction

kt

24,548

26,296

8,510

8,438

8,880

Average copper grade

%

0.82

0.80

0.83

0.82

0.83

Copper concentrate

kt

809.7

799.1

274.0

277.1

264.2

Own copper in concentrate

kt

167.3

173.0

59.2

57.3

56.0

Own copper cathode equivalent production1

kt

153.7

160.8

55.6

49.8

52.5

Cathode

kt

81.2

155.7

30.1

25.9

47.4

Concentrate2

kt

72.5

5.1

25.5

23.9

5.1

Silver3,4

koz

5,509

6,942

1,953

1,694

2,222

Gold4

koz

51.1

44.1

17.8

15.1

15.4

1Includes copper cathode converted into rod, excluding tolling.

2Copper cathode equivalent of copper in concentrate sold. The copper cathode equivalent is only recognised as 'produced'

 when the concentrate is transferred to the customer. Copper cathode equivalent is recognised at a recovery rate of 96.5%.

3Includes silver granule equivalent of silver in concentrate sold. Silver granule equivalent is recognised at a recovery rate

 of 90.0%.

4Includes a small volume of production from former Kazakhmys Gold's mines and slimes from purchased concentrate.

 

 

In the first nine months of 2014, ore extraction of 24,548 kt was 7% below the comparative period in 2013 with a reduction of output in some high cost areas in the Zhezkazgan Region to protect profit margins. Output in the Central Region decreased by 3% to 9,282 kt with lower output from Sayak mine due to equipment downtime.

 

Ore extraction in Q3 2014 was in line with the previous quarter at 8,510 kt.

 

The average copper grade was 0.82% in the first nine months of 2014, higher than in the comparative period, mainly driven by the increase in grade at Akbastau mine in the Central Region.

 

In the first nine months of 2014, the volume of copper in ore mined declined by 5% when compared to the corresponding period in the prior year, with lower volumes of ore mined. Copper in concentrate output from own material decreased by 3% to 167.3 kt in the first nine months of 2014, impacted by a reduction in copper in ore mined and processed, slightly offset by an increase in recovery rates at the concentrators due to processing of higher grade material.

 

In Q3 2014, copper in concentrate output was 3% above Q2 2014, closely matching the 2% increase in volume of copper in ore mined.

 

Copper cathode equivalent production in the first nine months of 2014 was 4% below the comparative period in 2013 mainly caused by 3% lower copper in concentrate production.

    

Copper Summary

Kazakhmys MINING Production - disposal assets (continued)

By-product Output

 

Silver

Silver production in the first nine months of 2014 decreased by 21% to 5,509 koz, reflecting the 12% decline in volume of silver metal in ore mined, mainly in the Zhezkazgan Region, compared with the same period in 2013. Silver production in the first nine months of 2013 benefited from a significant release of work in progress.

 

Gold

Gold metal in ore extracted in the first nine months of 2014 was 3% below the prior period as there was no output from the gold rich Abyz mine in Q3 2014, where operations have been suspended pending a study on the development of an underground mine. Gold production in the first nine months of 2014 was 16% above the comparative period at 51.1 koz due to a higher release of work in progress compared with prior year period.

 

Gold production in Q3 2014 increased by 18% to 17.8 koz compared with the prior quarter, despite similar volumes for both gold in ore mined and gold in concentrate output quarter on quarter, due to the release of work in progress at the end of the reporting quarter.

Kazakhmys Power Review

kazakhmys POWER PRODUCTION - disposal assets

9m

2014

9m

2013

Q3

2014

Q2

2014

Q3

 2013

Net power generated1

GWh

3,788

4,242

1,226

1,020

1,348

Internal sales

GWh

2,204

2,539

668

706

770

External sales

GWh

1,584

1,703

558

314

578

Net dependable capacity2

MW

833

846

826

849

847

1Electricity generated and sold to customers less internal consumption and transformer losses in

power stations.

2The net dependable capacity is the maximum capacity a unit can sustain over a specified period of time modified for seasonal limitations and reduced by the capacity required for station service and auxiliaries.

 

Net power generated in the first nine months of 2014 was 11% below the comparative period in 2013 due to lower demand and the decommissioning of turbines in Q4 2013 and Q2 2014. As a result, net dependable capacity was 833 MW in the first nine months of 2014 compared with 846 MW in the first nine months of 2013.

 

Internal power sales in the first nine months of 2014 were 13% below the comparative period in 2013, impacted by the suspension of the Zhezkazgan smelter and two concentrators in the second half of 2013. External sales also decreased by 7% versus the corresponding nine month period in 2013.

 

Net power generated in Q3 2014 was 20% higher than Q2 2014 due to completion of the maintenance season and because sales in Q2 2014 were held back by an increase in the availability of low cost hydro-electricity.

   

Interim Management Statement

MATERIAL eVENTS AND tRANSACTIONS

There were no material events and transactions in the period covered by this Interim Management Statement that were not disclosed as post balance sheet events in the Group's half-yearly report for the period ended 30 June 2014, other than as set out below.

 

Group Restructuring Update

Following the independent shareholders' approval of the Group Restructuring on 15 August 2014, regulatory consents have now been obtained and completion of the transaction is expected imminently.

 

As disclosed in the Group's half-yearly report for the period ended 30 June 2014, the Disposal Assets were classified as assets held for sale with effect from 15 August 2014 and measured at their fair value less costs to sell. As a result of the classification, the Group will recognise a charge of approximately $1.7 billion on the remeasurement of the Disposal Assets. Upon completion of the restructuring, a further loss arising from the recycling to the income statement of the cumulative foreign exchange losses relating to the Disposal Assets, which had previously been recognised in equity, will be recognised. The value of the recycled reserves will depend on the KZT/USD exchange rate at the date of completion and will have no impact on the Group's net assets.

 

Growth Projects

On 24 September 2014 the Group announced an update on the Aktogay growth project following the appointment of Non Ferrous China as the contractor for the construction of the sulphide concentrator. The sulphide concentrator is the largest item in the capital expenditure budget for the project and subsequent to the contract award the Group was able to confirm that the total capital cost for the Aktogay project will be in the region of $2.3 billion. Aktogay remains on track for copper production from oxide in the fourth quarter of 2015 and for sulphide production to commence in 2017.

 

PXF Refinancing

On 29 October 2014 the Group signed an amendment to its pre-export finance ("PXF") debt facility. The amended facility replaces the existing $500 million facility which contained certain undertakings which would not permit it to continue post completion of the restructuring. At signing, commitments from the existing syndicate of lending banks totalled $334 million. The amended facility can be extended to enable existing lenders to increase their commitment, or new lenders to join, up to a maximum total facility amount of $500 million.

 

A number of changes to the terms of the facility were made which grant additional flexibility to the Group including the extension of the final maturity and grace periods by one year, the suspension of the net debt to EBITDA covenant until 1 July 2016 and a variable interest margin of between 3.0% and 4.5% plus US$ LIBOR dependent on the ratio of net debt to EBITDA tested semi-annually.

  

Interim Management Statement

financial Performance

Sales Volumes

The following table sets out the sales volumes of the Group's major products:

 

 

 

Retained Assets

9m 2014

Group

9m

 2014

Group

9m

 2013

Copper in concentrate1

kt

-

72.5

5.1

Copper cathodes

kt

60.9

130.8

216.5

Copper rod

kt

-

8.8

8.9

Total copper cathode equivalent sales

kt

 

60.9

212.1

230.5

 

 

 

 

Zinc in concentrate

kt

89.3

89.3

103.1

 

 

 

 

Silver in copper concentrate2

koz

-

3,212

232

Silver bar and granules3

koz

3,097

5,827

10,331

Silver bar and granule equivalent sales

koz

 

3,097

9,039

10,563

 

 

 

 

Gold bar3

koz

24.6

76.0

78.2

 

 

 

 

Electricity sales4

kWh

-

3,788

4,242

1 Cathode equivalent of copper in concentrate sold.

2 Granule and bar equivalent of silver in concentrate sold.

3 Sales include output of silver and gold doré from former Kazakhmys Gold's mines.

4 External and internal sales.

 

 

Retained Assets Sales Volumes

Copper cathode sales volumes from the East Region were 60.9 kt in the first nine months of 2014 which was consistent with production volumes.

 

Sales of zinc in concentrate, which is only produced in the East Region, were 89.3 kt in the first nine months of 2014. The 13.8 kt decline in sales volumes compared to the comparative prior year period reflects the 10.2 kt decrease in production volumes and a 3.5 kt release of finished goods in the prior year period. 

 

Silver bar and granule sales volumes in the first nine months of 2014 were 3,097 koz which was 467 koz above production levels due to the release of inventory during 2014.

 

Sales of gold bar totalled 24.6 koz in the first nine months of 2014 which was 1.3 koz above production volumes due to the release of inventory during the period.

 

Group Sales Volumes

Total copper cathode equivalent sales volumes in the first nine months of 2014 were 18.4 kt below the comparative period in 2013. The decrease in copper product sales was principally due to a release of finished goods inventory in 2013 of 14.7 kt.

 

  

Interim Management Statement

financial Performance (continued)

Sales of copper concentrate from the Zhezkazgan Region commenced following the suspension of the Zhezkazgan smelter in the second half of 2013. In the first nine months of 2014, 75.1 kt of copper in concentrate was sold from the Zhezkazgan Region to external customers, equivalent to 72.5 kt of copper cathode.

 

Silver bar and granule equivalent sales volumes were 1,524 koz below the comparative prior period due to a 2,380 koz decline in production volumes partially offset by a release of inventory in 2014. The copper concentrate sold in the period contained 3,569 koz of silver material which is equivalent to 3,212 koz of silver bar and granule.

 

Gold sales volumes in the first nine months of 2014 were 2.2 koz below the comparative period in 2013 as the 3.8 koz decline in production volumes was partially offset by a release of inventory in 2014.

Interim Management Statement

FINANCIAL PERFORMANCE (CONTINUED)

Commodity Prices

The following table sets out the average realised prices for the Group's major products:

Retained Assets

9m 2014

Group

9m

 2014

Group

9m

 2013

Copper cathode

$/tonne

7,047

7,047

7,393

Copper rod

$/tonne

-

6,982

7,750

Copper in concentrate1

$/tonne

-

6,057

6,725

Zinc in concentrate

$/tonne

1,215

1,215

1,051

Silver2

$/tr.oz

20

20

24

Gold

$/tr.oz

1,270

1,270

1,424

Electricity tariff3

KZT/kWh

-

5.50

5.10

1 The realised price excludes revenue from the silver material in the copper concentrate sold

and is calculated using the copper cathode equivalent of the copper in concentrate sold.

2 Excludes revenue from silver in copper concentrate sales.

3 External and internal sales from the captive power stations.

 

The following table sets out the average LME/LBMA prices:

9m

 2014

9m

 2013

Copper

$/tonne

6,943

7,379

Zinc

$/tonne

2,140

1,910

Silver

$/tr.oz

20

25

Gold

$/tr.oz

1,288

1,455

 

The realised prices for the finished products sold will differ from the average LME/LBMA prices during the same period, principally because sales of the products are not made evenly over the period. Premiums or discounts to metal exchange prices negotiated with customers also impact average realised prices.

 

The copper in concentrate and zinc in concentrate realised prices are below the LME average price for the finished products due to the deduction of treatment and refining charges from the revenue derived from the sale of the products.

 

The weighted average realised tariff for the captive power stations in the first nine months of 2014 was above the tariff in the prior year period due to the increase in the ceiling tariff for electricity sales set by the Government of Kazakhstan from 5.10 KZT/kWh to 5.50 KZT/kWh from 1 January 2014.

 

Commodity Hedging

At 30 September 2014, there were no commodity hedges in place.

 

Exchange Rates

The KZT/USD exchange rate at 30 September 2014 was KZT/USD 181.96 compared with KZT/USD 153.62 at 30 September 2013. As a result of the devaluation of the tenge against the US dollar in February 2014, the average exchange rate for the nine months ended 30 September 2014 was KZT/USD 178.46, compared with an average rate of KZT/USD 151.57 in the prior year period. 

Interim Management Statement

fINANCIAL POSITION

Except as described in this statement, there has been no significant change in the financial position of the Group since 30 June 2014.

 

Group Net Debt

The net debt of the Group increased from $192 million at 30 June 2014 to $434 million at 30 September 2014 as the Group continued to develop the Bozshakol and Aktogay projects. Operating cash flows during the period included a VAT refund of $23 million, quarterly mineral extraction tax payments of $35 million and interest payments of $62 million under the Group's debt facilities.

 

Group net debt is stated before the working capital payment due to Cuprum Netherlands Holding B.V. upon completion of the Group restructuring.

 

At 30 September 2014, gross debt was $2,668 million compared to $2,726 million at 30 June 2014 largely reflecting a $94 million principal repayment under the $2.7 billion China Development Bank/Samruk-Kazyna finance facility and an additional $33 million drawn down under the China Development Bank facility for the Aktogay project.

 

Of the gross debt at 30 September 2014, $2,065 million related to the $2.7 billion China Development Bank/Samruk-Kazyna finance facility, $113 million related to the China Development Bank facility for the Aktogay project and $490 million related to the PXF facility.

 

Total cash and cash equivalents and current investments for the Group of $2,234 million at 30 September 2014 were $300 million lower than the $2,534 million at 30 June 2014. Of these funds, $146 million is reserved for the development of the Group's projects under the relevant finance facilities.

 

Kazakhmys Mining Production Appendix

Copper MINing

East Region - Retained Assets

9m

2014

9m

2013

Q3

2014

Q2

2014

Q3

 2013

Artemyevsky

ore (kt)

1,014

1,021

340

350

341

grade (%)

1.76

1.67

1.69

1.78

1.48

Irtyshsky

ore (kt)

466

469

145

159

165

grade (%)

1.46

1.51

1.46

1.49

1.48

Orlovsky

ore (kt)

1,158

1,166

376

400

384

grade (%)

3.73

3.39

3.48

3.83

3.77

Yubileyno-Snegirikhinsky

ore (kt)

509

618

149

184

214

grade (%)

2.13

2.26

2.13

1.88

2.18

Region total1

ore (kt)

3,147

3,274

1,010

1,093

1,104

Region average

grade (%)

2.50

2.37

2.39

2.50

2.41

 

Zhezkazgan Region - Disposal Assets

 

 

 

 

 

 

 

 

 

 

North

ore (kt)

1,255

2,034

444

471

727

grade (%)

0.75

0.66

0.72

0.79

0.72

East (incl. West)

ore (kt)

4,968

5,295

1,761

1,682

1,593

grade (%)

0.83

0.77

0.85

0.85

0.85

South (incl. Stepnoy)

ore (kt)

6,208

6,583

2,069

2,069

2,122

grade (%)

0.70

0.73

0.74

0.68

0.74

Zhomart

ore (kt)

2,835

2,805

880

972

981

grade (%)

0.97

1.13

0.99

0.91

0.94

Region total

ore (kt)

15,266

16,717

5,154

5,194

5,423

Region average

grade (%)

0.80

0.80

0.82

0.79

0.80

 

Kazakhmys Mining Production Appendix

Copper MINing (continued)

Central Region - Disposal Assets

9m

2014

9m

2013

Q3

2014

Q2

2014

Q3

 2013

Nurkazgan West

ore (kt)

2,241

2,216

833

772

964

grade (%)

0.70

0.59

0.76

0.70

0.62

Abyz

ore (kt)

-

81

-

-

72

grade (%)

-

0.72

-

-

0.73

Akbastau

ore (kt)

1,613

1,620

535

572

627

grade (%)

1.99

1.77

1.97

1.97

1.82

Sayak

ore (kt)

1,137

1,350

401

399

483

grade (%)

0.95

0.86

0.88

1.03

0.91

Shatyrkul

ore (kt)

477

487

179

163

172

grade (%)

1.89

2.24

1.78

1.96

2.32

Konyrat

ore (kt)

3,814

3,825

1,408

1,338

1,139

grade (%)

0.31

0.30

0.34

0.31

0.31

Region total

ore (kt)

9,282

9,579

3,356

3,244

3,456

Region average

grade (%)

0.86

0.80

0.84

0.87

0.86

Total Group

ore (kt)

27,695

29,570

9,520

9,531

9,984

Overall average

grade (%)

1.00

0.97

0.97

1.01

1.00

 

Kazakhmys Mining Production Appendix

Copper processing

9m

2014

9m

2013

Q3

2014

Q2

2014

Q3

 2013

East Region - Retained Assets

Copper concentrate

kt

348.9

335.6

114.0

115.8

121.2

Copper in concentrate1

kt

66.3

63.5

21.9

22.3

22.6

Zhezkazgan Region - Disposal Assets

Copper concentrate

kt

303.4

334.5

102.7

103.9

98.9

Copper in concentrate

kt

102.4

110.2

34.9

34.8

34.4

Central Region - Disposal Assets

Copper concentrate

kt

506.3

464.6

171.3

173.2

165.3

Copper in concentrate

kt

64.9

62.8

24.3

22.5

21.6

Total own

Copper concentrate

kt

1,158.6

1,134.7

388.0

392.9

385.4

Copper in concentrate

kt

233.6

236.5

81.1

79.6

78.7

Purchased concentrate

Copper concentrate

kt

0.1

1.6

0.1

-

1.1

Copper in concentrate

kt

-

0.8

-

-

0.6

Total copper in concentrate

kt

233.4

237.3

80.8

79.6

79.2

1 Includes own material processed by third parties.

Kazakhmys Mining Production Appendix

Copper smelter/refinery - copper cathode production

9m

2014

9m

2013

Q3

2014

Q2

2014

Q3

 2013

Zhezkazgan smelter

Own concentrate

kt

-

76.3

-

-

21.6

Total

kt

-

76.3

-

-

21.6

Balkhash smelter

Own concentrate

kt

140.6

133.5

48.4

45.8

43.9

Purchased concentrate

kt

-

0.9

-

-

0.5

Tolling

kt

2.9

0.1

2.9

-

0.1

Total including tolling

kt

143.5

134.5

51.3

45.8

44.5

Total including tolling

kt

143.5

210.8

51.3

45.8

66.1

Own copper cathode production - Disposal and Retained Assets

kt

140.6

209.8

48.4

45.8

65.5

Copper cathode production - Retained Assets

kt

59.4

54.1

18.3

19.9

18.1

Copper in concentrate sold1

kt

72.5

5.1

25.5

23.9

5.1

Own copper cathode equivalent production

kt

213.1

214.9

73.9

69.7

70.6

1 Copper cathode equivalent of copper in concentrate sold.

 

  

Kazakhmys Mining Production Appendix

Other metals Mining - Zinc

ZINC

9m

2014

9m

2013

Q3

2014

Q2

2014

Q3

 2013

East Region

Artemyevsky

grade (%)

3.85

4.83

3.23

3.86

5.36

Irtyshsky

grade (%)

3.29

3.24

3.02

3.28

3.22

Orlovsky

grade (%)

5.63

5.08

4.81

5.58

5.79

Yubileyno-Snegirikhinsky

grade (%)

1.62

1.76

1.88

1.22

1.58

Region average

grade (%)

4.07

4.11

3.58

3.96

4.36

Central Region

Abyz

grade (%)

-

2.46

-

-

2.57

Akbastau

grade (%)

1.42

1.07

1.12

1.36

1.31

Region average

grade (%)

1.42

1.14

1.12

1.36

1.44

Overall average

grade (%)

3.17

3.10

2.73

3.07

3.29

Zinc bearing ore mined

 (kt)

4,760

4,975

1,546

1,665

1,803

Zinc in concentrate

(kt)

89.4

99.6

27.7

30.0

36.5

East Region zinc in concentrate

(kt)

89.4

99.6

27.7

30.0

36.5

 Kazakhmys Mining Production Appendix

Other metals Mining - Silver

SILVER

9m

2014

9m

2013

Q3

2014

Q2

2014

Q3

 2013

East Region

Artemyevsky

grade (g/t)

63.06

95.84

47.86

73.66

109.79

Irtyshsky

grade (g/t)

47.38

49.29

45.46

46.85

50.97

Orlovsky

grade (g/t)

73.25

62.66

63.82

70.69

71.57

Yubileyno-Snegirikhinsky

grade (g/t)

20.26

25.24

18.74

19.58

26.90

Region average

grade (g/t)

57.57

64.04

49.16

59.56

71.64

Zhezkazgan Region

North

grade (g/t)

6.49

7.34

6.53

7.53

7.63

East (incl. West)

grade (g/t)

9.96

11.31

9.95

10.28

10.92

South (incl. Stepnoy)

grade (g/t)

14.73

15.39

14.78

14.47

17.86

Zhomart

grade (g/t)

8.47

9.15

7.46

8.11

9.02

Region average

grade (g/t)

11.34

12.07

11.17

11.30

12.85

Central Region

Nurkazgan

grade (g/t)

1.88

1.38

2.14

1.92

1.33

Abyz

grade (g/t)

-

18.96

-

-

19.79

Akbastau

grade (g/t)

16.69

17.75

12.98

16.54

19.60

Sayak

grade (g/t)

5.22

4.53

5.13

5.80

4.40

Shatyrkul

grade (g/t)

1.99

1.99

2.04

1.88

1.91

Konyrat

grade (g/t)

1.76

1.23

1.94

2.13

1.22

Region average

grade (g/t)

4.82

4.71

4.14

5.06

5.45

Overall average

grade (g/t)

14.41

15.44

12.73

14.71

16.79

Silver bearing ore mined

(kt)

27,695

29,570

9,522

9,531

9,984

East Region silver bearing ore mined

(kt)

3,147

3,274

1,010

1,093

1,104

Silver in concentrate

(koz)

8,947

10,857

3,214

2,991

3,734

East Region silver in concentrate

(koz)

2,678

3,905

890

888

1,514

Own silver in concentrate

(koz)

8,911

10,826

3,188

2,981

3,716

Purchased concentrate

(koz)

36

31

26

10

18

Total silver output1, 2

(koz)

8,139

10,419

2,915

2,411

3,275

East Region silver

(koz)

2,630

3,477

962

717

1,053

Silver granule equivalent in copper concentrate sold

(koz)

3,212

232

1,118

1,083

232

1 Includes slimes from purchased concentrate.

2 Includes a small volume of by-product production from former Kazakhmys Gold's mines. Includes silver granule equivalent of silver in concentrate sold.

 

 

Kazakhmys Mining Production Appendix

other metals Mining - gold

GOLD

9m

2014

9m

2013

Q3

2014

Q2

2014

Q3

 2013

East Region

Artemyevsky

grade (g/t)

0.63

0.95

0.56

0.72

1.17

Irtyshsky

grade (g/t)

0.28

0.27

0.26

0.32

0.35

Orlovsky

grade (g/t)

1.35

1.18

1.25

1.27

1.22

Yubileyno-Snegirikhinsky

grade (g/t)

0.39

0.46

0.43

0.38

0.53

Region average

grade (g/t)

0.80

0.84

0.75

0.81

0.94

Central Region

Nurkazgan

grade (g/t)

0.28

0.25

0.32

0.26

0.27

Abyz

grade (g/t)

-

3.36

-

-

3.52

Akbastau

grade (g/t)

0.63

0.64

0.55

0.61

0.69

Sayak

grade (g/t)

0.41

0.19

0.43

0.45

0.20

Shatyrkul

grade (g/t)

0.28

0.37

0.26

0.28

0.35

Region average

grade (g/t)

0.41

0.40

0.40

0.41

0.48

Overall average

grade (g/t)

0.55

0.56

0.52

0.55

0.63

Gold bearing ore mined

(kt)

8,615

9,028

2,959

2,999

3,241

East Region gold bearing ore mined

(kt)

3,147

3,274

1,010

1,093

1,104

Gold in concentrate

(koz)

75.4

79.7

24.7

25.2

28.5

East Region gold in concentrate

(koz)

25.3

35.4

8.1

8.3

13.0

Own concentrate

(koz)

75.4

78.7

24.7

25.2

27.6

Purchased concentrate

(koz)

-

1.0

-

-

0.9

Total gold output1

(koz)

74.4

78.2

23.4

22.8

27.6

East Region gold output

(koz)

23.3

34.1

5.6

7.7

12.2

1 Includes slimes from purchased concentrate and a small volume from former Kazakhmys Gold's mines.

 

 

 

 

 

 