Q3 2010 Production Report and IMS

22nd Jul 2010 07:00

RNS Number : 7263P
Lonmin PLC
22 July 2010
 



 

 

 

 

 

 

22 July 2010

 

Lonmin Plc

 

Third Quarter 2010 Production Report

& Interim Management Statement

 

Lonmin Plc, ("Lonmin" or "the company") today announces its production report and interim management statement for the three and nine months to 30 June 2010 (unaudited).

 

Overview

 

This quarter has seen us deliver increased output at our Marikana underground operations as we continue to see operational improvements. Year to date our underground tonnage is up on the comparable prior year period whilst metal in concentrate is at the same level as last year as the increased ounces from our underground operations have offset the impact of the operations closed last year.

 

Q3 2010 Production

 

Our underground mining operations at Marikana produced 2.6 million tonnes during the third quarter of the 2010 financial year, an increase of 10.2% from the third quarter of the 2009 financial year. This was mainly due to an increase in production during the quarter from Hossy and Saffy which continued to ramp up and increased production by 40.9%, to 0.5 million tonnes, over the prior year period. Sequentially output from those shafts increased by 11.7% quarter on quarter. The increase in the conventional mining tonnage was some 0.1 million tonnes or 4.8%. The impact of Section 54 shut downs was around 109,000 tonnes in lost production during the quarter mainly at our K3 shaft. This compares to a loss in production during the same period last year of around 160,000 tonnes.

 

Pandora underground production showed a quarter on quarter increase of 10.3% and increased by 30.9% from the prior year period, whilst production at the Merensky opencast pit at Marikana has commenced and is beginning to ramp up.

 

Total tonnes milled in the quarter were flat year on year, at 2.8 million tonnes but showed an increase of 9.8% from 2.5 million tonnes milled in the second quarter of the 2010 financial year. Platinum in concentrate from the Marikana operations was 163,311 saleable ounces during the third quarter of 2010, an increase of 16.3% from the prior year period and an increase of 5.6% quarter on quarter. This was due to achieving another excellent quarter of concentrator recoveries. In total, the concentrators produced 169,614 saleable ounces of Platinum in concentrate for the quarter, a 10.9 % increase from the third quarter of the prior year.

 

Underground and overall concentrator recoveries increased to 85.1% and 85.0% from 80.5% and 79.0% respectively year on year. Sequentially recoveries have been very consistent at 84% to 85% with each quarter being much higher than the equivalent period last year. This improvement in our performance on a quarter by quarter basis is pleasing and demonstrates the success of the rigorous approach we have taken on batch milling the right ore through the appropriate concentrators, recognition of the importance of regular plant maintenance as well as the continued benefits from our concentrator optimisation programme.

 

Our underground milled head grade increased marginally to 4.6 grammes per tonne (5PGE + Au) from 4.57 grammes per tonne in the prior year period whilst overall head grade increased by 4.1% year on year to 4.55 grammes per tonne (5PGE + Au). Underground milled head grade declined by 3.0% from 4.74 grammes per tonne quarter on quarter due to an increase in the percentage of Merensky ore milled and some lower grade development ore arising from our UG2 operations.

 

As previously announced, the Number one furnace suffered a setback in May 2010 during its recommissioning following a matte run out on 30 March 2010. Following its repair, the Number one furnace was recommissioned and has been performing steadily for over one month now. The Pyromet furnaces, which have around 40% of the Number one furnace capacity, have been operating since 30 March 2010.

The Number one furnace incident has impacted refined metal production and metal sales in the third quarter of the 2010 financial year. Consequently total refined production in the third quarter of the 2010 financial year was 91,952 ounces of Platinum and 194,234 ounces of PGMs, a decrease of 46.7% and 39.5% respectively from the third quarter of the 2009 financial year.

 

Metal sales during the third quarter of the 2010 financial year also decreased significantly from the prior year to 91,952 ounces of Platinum and 192,507 ounces of PGMs.

 

Nine Month Production

 

Total tonnes mined during the first nine months of the 2010 financial year were 7.9 million tonnes, a decrease of 0.2 million tonnes from 2009, reflecting the closure in 2009 of the opencast and Limpopo operations. During the period we mined 7.7 million tonnes from the Marikana underground operations, an increase of 1.6% in the nine month period of the 2010 financial year, when compared against the same period in 2009. The impact of Section 54s shut downs on the nine month period in 2010 financial year has been a loss of around 258,000 tonnes. This compares to around 316,000 tonnes for the same period last year.

 

Total tonnes milled during the first nine months of the 2010 financial year declined by 8.2% to 7.9 million tonnes when compared to the same period in the prior year due to the impact of the closure of Limpopo and opencast during 2009. Marikana underground tonnes milled were marginally up on last year. The concentrators produced a total of 491,478 saleable ounces of Platinum in concentrate in the nine months, a marginal year on year increase. Overall concentrator recoveries improved significantly during the first nine months of the 2010 financial year, to 84.6% from 79.7% in the same period in 2009.

 

During the nine month period to 30 June 2010 underground head grade improved by 2.7% to 4.69 grammes per tonne (5PGE + Au) as a result of cleaner mining and less development ore particularly at Hossy and Saffy.

 

Total refined production for the first nine months of the 2010 financial year was 383,873 ounces of Platinum and 781,385 ounces of total PGMs, a decrease of 21.8% and 15.7% respectively when compared to the same period in 2009. This reflects the impact of the Number 1 furnace incidents.

 

Final metal sales for the nine months were 383,874 ounces of Platinum and 786,036 ounces of total PGMs, a decrease of 21.7% and 13.6% respectively.

 

Overall

 

During the quarter Shanduka purchased 50.03% of Incwala, our Black Economic Empowerment partner and Lonmin provided a loan to Shanduka of to help facilitate this transaction. The resultant cash outflow of approximately £150 million was fully funded by a placing undertaken on 10 May 2010.

 

The quarter by quarter improvement in underground mining tonnes when compared to last year gives us confidence that, absent material safety stoppages, we will have a strong quarter four, well up on last year. This combined with good concentrator recoveries should lead to a material increase in underground metal in concentrate output when compared to last year, indicating the turnaround in Lonmin's mining division is well underway. In addition our opencast operation will continue to ramp up and in total we fully expect metal in concentrate to exceed last years level.

 

As stated in our announcement of 24 May we have decided to toll refine and sell some part processed Platinum ounces due to the need to rundown concentrate stockpiles given that the smelter will be down in November/December for a redesign and rebuild. On this basis, we continue to expect to meet our sales target of 700,000 Platinum ounces. The cost of the toll refining and selling in process inventory is expected to be around $17.5 million. The incremental cost incurred does not form part of our cost guidance for the year.

 

 

 

ENQUIRIES:

 

Investors / Analysts:

 

Tanya Chikanza +44 (0) 207 201 6007

Head of Investor Relations

 

Media:

 

Cardew Group +44 (0) 207 930 0777

Rupert Pittman/Jamie Milton

 

Financial Dynamics +27 (0) 21 487 9000

Dani Cohen / Ravin Maharaj

 

3 months

3 months

9 months

9 months

to 30 Jun

to 30 Jun

to 30 Jun

to 30 Jun

2010

2009

2010

2009

Tonnes mined

Marikana

Underground - total

000

2,584

2,344

7,726

7,602

Underground - conventional

000

2,088

1,992

6,364

6,646

Underground - Hossy & Saffy1

000

496

352

1,362

956

Opencast

000

84

4

91

234

Total

000

2,668

2,348

7,817

7,836

Limpopo

Underground

000

-

-

-

87

Total

000

-

-

-

87

Pandora attributable2

Underground

000

43

33

120

104

Opencast

000

-

38

-

148

Total

000

43

70

120

252

Lonmin Platinum

Underground

000

2,626

2,377

7,846

7,794

Opencast

000

84

42

91

381

Total

000

2,711

2,419

7,937

8,175

Tonnes milled3

Marikana

Underground

000

2,614

2,348

7,513

7,472

Opencast

000

68

243

129

438

Total

000

2,682

2,591

7,642

7,910

Limpopo

Underground

000

-

-

-

92

Total

000

-

-

-

92

Pandora4

Underground

000

99

77

265

245

Opencast

000

-

121

-

372

Total

000

99

198

265

617

Lonmin Platinum

Underground

000

2,712

2,425

7,779

7,809

Head grade5

g/t

4.60

4.57

4.69

4.57

Recovery rate6

%

85.1%

80.5%

84.7%

80.7%

Opencast

000

68

365

129

810

Head grade5

g/t

2.51

3.03

2.25

3.94

Recovery rate6

%

78.9%

63.8%

63.8%

68.2%

Total

000

2,780

2,789

7,908

8,618

Head grade5

g/t

4.55

4.37

4.65

4.51

Recovery rate6

%

85.0%

79.0%

84.6%

79.7%

 

 

3 months

3 months

9 months

9 months

to 30 Jun

to 30 Jun

to 30 Jun

to 30 Jun

2010

2009

2010

2009

Metals in concentrate7

Marikana

Platinum

oz

163,311

140,422

473,914

449,040

Palladium

oz

76,922

65,050

222,097

208,160

Gold

oz

4,067

3,557

10,557

10,615

Rhodium

oz

22,350

19,473

66,152

62,473

Ruthenium

oz

35,259

29,993

102,152

96,447

Iridium

oz

7,683

6,526

22,318

21,045

Total PGMs

oz

309,592

265,021

897,190

847,780

Nickel8

MT

809

626

2,085

1,946

Copper8

MT

493

402

1,288

1,227

Limpopo

Platinum

oz

-

-

-

3,770

Palladium

oz

-

-

-

3,331

Gold

oz

-

-

-

243

Rhodium

oz

-

-

-

487

Ruthenium

oz

-

-

-

688

Iridium

oz

-

-

-

159

Total PGMs

oz

-

-

-

8,679

Nickel8

MT

-

-

-

76

Copper8

MT

-

-

-

54

Pandora3

Platinum

oz

6,303

12,455

17,564

38,209

Palladium

oz

2,991

5,548

8,267

17,149

Gold

oz

44

91

121

294

Rhodium

oz

987

1,755

2,769

5,320

Ruthenium

oz

1,533

2,585

4,225

7,802

Iridium

oz

257

499

712

1,470

Total PGMs

oz

12,113

22,934

33,658

70,244

Nickel8

MT

10

12

27

37

Copper8

MT

6

8

15

22

Lonmin Platinum

Platinum

oz

169,614

152,878

491,478

491,019

Palladium

oz

79,913

70,598

230,364

228,640

Gold

oz

4,110

3,649

10,678

11,152

Rhodium

oz

23,336

21,228

68,920

68,281

Ruthenium

oz

36,792

32,578

106,377

104,936

Iridium

oz

7,941

7,025

23,030

22,675

Total PGMs

oz

321,706

287,955

930,848

926,703

Nickel8

MT

819

638

2,111

2,059

Copper8

MT

499

410

1,303

1,303

 

 

3 months

3 months

9 months

9 months

to 30 Jun

to 30 Jun

to 30 Jun

to 30 Jun

2010

2009

2010

2009

Metallurgy

Lonmin refined Metal Production12

Platinum

oz

91,928

172,136

383,670

490,040

Palladium

oz

57,230

79,164

207,522

226,557

Gold

oz

3,080

5,202

10,517

13,849

Rhodium

oz

16,823

20,062

59,769

64,750

Ruthenium

oz

19,621

37,821

92,370

110,773

Iridium

oz

3,899

5,589

24,321

18,068

Total PGMs

oz

192,581

319,974

778,169

924,037

Toll refined metal production

Platinum

oz

25

438

204

754

Palladium

oz

26

206

89

206

Gold

oz

-

10

-

10

Rhodium

oz

1

422

810

994

Ruthenium

oz

1,242

-

1,754

1,009

Iridium

oz

360

-

360

184

Total PGMs

oz

1,654

1,076

3,216

3,157

Total refined PGMs

Platinum

oz

91,952

172,574

383,873

490,794

Palladium

oz

57,256

79,370

207,611

226,763

Gold

oz

3,080

5,212

10,517

13,859

Rhodium

oz

16,824

20,484

60,578

65,745

Ruthenium

oz

20,864

37,821

94,124

111,782

Iridium

oz

4,259

5,589

24,681

18,252

Total PGMs

oz

194,234

321,050

781,385

927,194

Base metals

Nickel9

MT

560

764

2,110

2,395

Copper9

MT

274

438

1,178

1,517

Sales

Refined Metal Sales

Platinum

oz

91,952

178,486

383,874

492,157

Palladium

oz

54,113

79,150

204,468

226,334

Gold

oz

2,718

4,049

10,131

13,368

Rhodium

oz

16,146

20,809

63,447

59,548

Ruthenium

oz

22,348

37,970

98,219

105,471

Iridium

oz

5,231

5,760

25,898

18,260

Total PGMs

oz

192,507

326,225

786,036

915,137

Concentrate and other10

Platinum

oz

-

8

-

(1,810)

Palladium

oz

-

4

-

(3,218)

Gold

oz

-

-

-

-

Rhodium

oz

-

1

-

1

Ruthenium

oz

-

2

-

2

Iridium

oz

-

-

-

-

Total PGMs

oz

-

14

-

(5,025)

Lonmin Platinum

Platinum

oz

91,952

178,494

383,874

490,347

Palladium

oz

54,113

79,154

204,468

223,117

Gold

oz

2,718

4,049

10,131

13,368

Rhodium

oz

16,146

20,810

63,447

59,549

Ruthenium

oz

22,348

37,972

98,219

105,473

Iridium

oz

5,231

5,760

25,898

18,260

Total PGMs

oz

192,507

326,239

786,036

910,112

Nickel9

MT

410

986

1,795

2,354

Copper9

MT

282

362

1,288

1,268

 

 

3 months

3 months

9 months

9 months

to 30 Jun

to 30 Jun

to 30 Jun

to 30 Jun

2010

2009

2010

2009

Average prices

Platinum

$/oz

1,595

1,148

1,514

1,020

Palladium

$/oz

481

234

422

207

Gold

$/oz

1,136

927

1,128

888

Rhodium

$/oz

2,592

1,354

2,398

1,546

Ruthenium

$/oz

214

70

168

104

Iridium

$/oz

614

388

460

391

Basket price of PGMs11

$/oz

1,172

798

1,093

735

Basket price of PGMs11

R/oz

8,884

6,592

8,203

6,844

Nickel9

$/MT

22,002

12,839

17,249

14,514

Copper9

$/MT

7,244

7,075

6,598

6,351

Exchange Rates

Average rate for period13

R/$

7.53

8.43

7.49

9.41

Closing rate

R/$

7.66

7.72

7.66

7.72

 

Notes:

1.

Hossy and Saffy are replacement/growth shafts in ramp up. Hossy is fully mechanised whilst Saffy has conventional stoping but mechanised development. In previous production reports this section showed all M&A/Hybrid mining. All comparatives have been restated.

2.

Pandora attributable tonnes mined includes Lonmin's share (42.5%) of the total tonnes mined on the Pandora joint venture.

3.

Tonnes milled excludes slag milling.

4.

Lonmin purchases 100% of the ore produced by the Pandora joint venture for onward processing which is included in downstream operating statistics.

5.

Head Grade is the grammes per tonne (5PGE + Au) value contained in the tonnes milled and fed into the concentrator from the mines (excludes slag milled).

6.

Recovery rate in the concentrators is the total content produced divided by the total content milled (excluding slag).

7.

Metals in concentrate include metal derived from slag processing and have been calculated at industry standard downstream processing losses to present produced saleable ounces.

8.

Corresponds to contained base metals in concentrate.

9.

Nickel is produced and sold as nickel sulphate crystals or solution and the volumes shown correspond to contained metal. Copper is produced as refined product but typically at LME grade C.

10.

Concentrate and others sales essentially relates to BMR concentrate and BMR/PMR residues.

11.

Basket price of PGMs is based on the revenue generated from the actual PGMs (5PGE + Au) sold in the period.

12.

Lonmin refined metal production and sales include an estimated 3koz saleable ounces of Platinum produced from toll refining third party concentrate in Q3 (2009 - nil).

13.

Exchange rates are calculated using the market average daily closing rate over the course of the period.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
IMSSEDFMFFSSEIW