Q1 Production Report

26th Apr 2018 07:00

RNS Number : 1495M
KAZ Minerals PLC
26 April 2018
 

 

 

KAZ MINERALS PLC

6TH FLOOR

CARDINAL PLACE

100 VICTORIA STREET

LONDON SW1E 5JL

Tel: +44 (0) 20 7901 7800

 

 

 

26 April 2018

 

KAZ MINERALS GROUP Production Report

for THE FIRST QUARTER Ended 31 MARCH 2018

 

l Copper production1 increased by 3% to 67.3 kt (Q4 2017: 65.2 kt) supported by higher output at Bozshakol and Aktogay sulphide

l  On track to achieve 2018 production guidance for all metals

l Bozshakol

§ 20% increase in copper production2 to 26.9 kt (Q4 2017: 22.5 kt) supported by a 10% growth in ore throughput and improved copper recovery

§ Gold output increased by 29% to 36.0 koz (Q4 2017: 27.9 koz) due to higher gold grade and improved recovery rate

l  Aktogay

§ Copper production2 from sulphide ore increased by 9% to 21.1 kt (Q4 2017: 19.3 kt), benefitting from higher copper grade of 0.62% and recovery rate of 88%

§ Cathode production from oxide ore seasonally lower at 5.3 kt (Q4 2017: 6.7 kt), 13% above Q1 2017

l  East Region and Bozymchak

§ Copper production2 16% lower at 14.0 kt (Q4 2017: 16.7 kt) due to planned idling of the Nikolayevsky concentrator, full year guidance of c.65 kt maintained

§ By-products in line with expectations, with zinc output rising 20% to 14.2 kt (Q4 2017: 11.8 kt)

l  Financial update

§ Net debt of $2,206 million at 31 March 2018

§ $250 million deferred from 2016-17 paid to Aktogay construction contractor in the quarter

 

Group production summary3

Q1 2018

Q4

2017

Q1 2017

Copper production1

kt

67.3

 65.2

 52.1

Bozshakol

kt

26.9

 22.5

 22.9

Aktogay

kt

26.4

 26.0

 11.9

East Region & Bozymchak

kt

14.0

16.7

17.3

Zinc in concentrate

kt

14.2

 11.8

 15.5

Gold production2

koz

49.9

 40.9

 42.6

Silver production2

koz

852

 798

 795

      

1 Payable metal in concentrate and copper cathode from Aktogay oxide ore.

2 Payable metal in concentrate.

See appendix for metal production by asset.

 

 

 

Andrew Southam, Chief Executive Officer, said: "I am pleased to report further quarterly production growth in 2018 supported by higher output from the sulphide plants at Bozshakol and Aktogay. We are on track to achieve our guidance across all metals for the full year, targeting 270-300 kt of copper production and 160-175 koz of gold. The Group is delivering production growth into a balanced market and the medium-term outlook for copper prices remains strong."

 

 

For further information please contact:

 

KAZ Minerals PLC

 

 

Chris Bucknall

Investor Relations, London

Tel: +44 20 7901 7882

Anna Mallere

Investor Relations, London

Tel: +44 20 7901 7814

Maksut Zhapabayev

Corporate Communications, Almaty

Tel: +7 727 244 03 53

Instinctif Partners

 

 

David Simonson

 

Tel: +44 20 7457 2020

 

REGISTERED OFFICE

6th Floor, Cardinal Place, 100 Victoria Street, London SW1E 5JL, United Kingdom.

NOTES TO EDITORS

KAZ Minerals PLC ("KAZ Minerals" or "the Group") is a high growth copper company focused on large scale, low cost, open pit mining in Kazakhstan. It operates the Bozshakol and Aktogay open pit copper mines in the Pavlodar and East Region of Kazakhstan, three underground mines and associated concentrators in the East Region of Kazakhstan and the Bozymchak copper-gold mine in Kyrgyzstan. In 2017, total copper production was 259 kt with by-products of 58 kt of zinc in concentrate, 179 koz of gold and 3,506 koz of silver.

The Group's new operations at Bozshakol and Aktogay have delivered one of the highest growth rates in the industry and transformed KAZ Minerals into a company dominated by world class, open pit copper mines.

Bozshakol is a first quartile asset on the global cost curve with an annual ore processing capacity of 30 million tonnes and a remaining mine life of 39 years at an average copper grade of 0.35%. The mine and processing facilities will produce an average of 100 kt of copper cathode equivalent and 120 koz of gold in concentrate per year over the first 10 years of operations.

Aktogay is a large scale, open pit mine similar to Bozshakol, with a remaining mine life of 28 years at an average copper grade of 0.36% (oxide) and 0.33% (sulphide). Aktogay commenced production of copper cathode from oxide ore in December 2015 and copper in concentrate from sulphide ore in February 2017. The operating sulphide concentrator has an annual ore processing capacity of 25 million tonnes and the sulphide processing capacity will be doubled to 50 million tonnes with the addition of a second concentrator by the end of 2021. Aktogay is competitively positioned on the global cost curve and will produce an average of 90 kt of copper per year from sulphide ore until 2021, increasing to 170 kt per year from 2022 to 2027, after the second concentrator commences operations. Copper production from oxide ore will be in the region of 20 kt per annum until 2025.

KAZ Minerals is listed on the London Stock Exchange, the Kazakhstan Stock Exchange and the Hong Kong Stock Exchange and employs around 13,000 people, principally in Kazakhstan.

This announcement contains inside information.

 

 

BOZSHAKOL

 

 

 

Q1 2018

Q4

2017

Q1 2017

Ore extraction

kt

8,136

 5,952

 9,904

Sulphide

kt

5,881

 5,078

 4,255

Clay

kt

2,255

 874

 5,649

 

 

 

 

 

Ore processed

kt

6,674

 6,060

 5,060

 

 

 

 

 

Copper

 

 

 

 

Average copper grade processed

%

0.52

 0.50

 0.57

Copper recovery rate

%

81.4

 78.2

 83.7

Copper in concentrate

kt

28.2

 23.5

 24.0

Copper production1

kt

26.9

 22.5

 22.9

 

 

 

 

 

Gold

 

 

 

 

Average gold grade processed

g/t

0.29

 0.26

 0.33

Gold recovery rate

%

62.5

 58.8

 57.6

Gold in concentrate

koz

38.5

 29.8

 30.5

Gold production1

koz

36.0

27.9

28.5

 

 

 

 

 

Silver production1

koz

183

170

161

      

1 Payable metal in concentrate.

Ore extraction increased by 37% to 8,136 kt (Q4 2017: 5,952 kt), mainly due to the stripping of 2,255 kt of clay bearing material (Q4 2017: 874 kt) to access sulphide ore in future periods. Sulphide ore extraction increased by 16% to 5,881 kt (Q4 2017: 5,078 kt) to support higher throughput at the main sulphide concentrator. Ore extraction reduced by 18% versus the prior year comparative period, when additional clay extraction was required.

Ore processed increased by 10% to 6,674 kt (Q4 2017: 6,060 kt) with the main sulphide plant processing 5,867 kt and operating at an average throughput of 95% in the quarter, during which there were no major maintenance stoppages. Mill re-linings are scheduled for Q2 and Q4 2018. Ore throughput in the clay plant was 807 kt, representing 65% of design capacity in Q1, down from 82% in the previous quarter, due to the plant's first extended shutdown for maintenance. A number of upgrades to the crusher were completed which have resulted in a step up in throughput in April. Total processing volumes at Bozshakol were 32% higher compared to the 5,060 kt processed in Q1 2017.

The average grade of ore processed increased to 0.52% from 0.50% in Q4 2017, in line with the mine plan. Sulphide processing grades over the remaining nine months of 2018 will vary depending on the blocks being mined, with the average sulphide grade processed for the year expected to be in the region of 0.44%, as previously guided.

Copper production increased by 20% compared to the previous quarter as throughput growth was supported by improved recoveries and higher average grades. Copper production was 17% higher compared to output of 22.9 kt in Q1 2017.

Following the 26.9 kt produced in Q1, Bozshakol remains on track for 2018 copper production of 95-105 kt, with a reduction in grades processed expected during the remainder of the year.

Gold production of 36.0 koz represents a 29% increase from Q4, driven by higher throughput, improved recovery and strong grades. Full year gold guidance is maintained at 115-125 koz, with lower grades expected for the remainder of the year. 

 

AKTOGAY

 

 

 

Q1 2018

Q4

2017

Q1 2017

Ore extraction

kt

8,474

 6,470

 6,019

Oxide

kt

4,359

 2,173

 4,213

Sulphide

kt

4,115

 4,297

1,806

 

 

 

 

 

Oxide

 

 

 

 

Oxide ore to leach pads

kt

4,359

 2,173

 4,213

Grade

%

0.30

 0.29

 0.44

Copper cathode

kt

5.3

 6.7

 4.7

 

 

 

 

 

Sulphide

 

 

 

 

Sulphide ore processed

kt

4,059

 4,265

 1,637

Average grade processed

%

0.62

 0.58

 0.80

Recovery rate

%

87.6

 81.6

 57.7

Copper in concentrate

kt

22.1

 20.2

 7.5

Copper production1

kt

21.1

 19.3

 7.2

 

 

 

 

 

Total copper production

kt

26.4

 26.0

 11.9

 

 

 

 

 

Gold production1, 2

koz

0.3

-

 0.1

Silver production1, 2

koz

95

 79

 38

1 Payable metal in concentrate.

2 Minimal volume recovered from Aktogay material.

Ore extraction increased by 31% due to increased mining of oxide ore in Q1 2018 compared to the lower than average volume extracted in the previous quarter. Ore extraction was 41% higher than the prior year comparative period due to the increase in the quantity of ore mined to feed the ramp up of the sulphide concentrator.

The average sulphide processing grade in the quarter increased to 0.62% (Q4 2017: 0.58%). Recovery rates also improved significantly to 87.6% (Q4 2017: 81.6%), assisted by the higher grade and increased utilisation of the HPGR circuit. Higher grades and recoveries more than offset the 5% reduction in processing volumes as throughput was restricted in January and February due to delays in the delivery to site of certain replacement parts and the plant subsequently ramped up to 76% of design capacity in March. Copper production from sulphide ore increased by 9% to 21.1 kt (Q4 2017: 19.3 kt) and full year guidance is held at 90-105 kt.

Copper cathode production from oxide ore reduced, as expected, to 5.3 kt (Q4 2017: 6.7 kt), with winter temperatures in Kazakhstan reaching exceptionally low levels in Q1. Production was 13% higher than the prior year comparative period, reflecting the progress in ramping up output at the SX/EW facility during 2017, and remains on track to achieve the 2018 target of 20-25 kt.

Total copper production of 26.4 kt represents an increase of 2% compared to the previous quarter and 122% compared to Q1 2017. With sulphide processing volumes planned to ramp up in 2018 and seasonally higher SX/EW output in Q2 and Q3, the Group is expected to reach its guided range of 110-130 kt of copper production at Aktogay in 2018. 

 

EAST REGION & BOZYMCHAK

 

 

 

Q1 2018

Q4

2017

Q1 2017

Ore extraction

kt

959

 977

 961

 

 

 

 

 

Ore processed

kt

934

 1,092

 1,003

 

 

 

 

 

Copper

 

 

 

 

Average grade processed

%

1.79

 1.80

 2.01

Orlovsky concentrator

%

 3.17

 3.32

 3.87

Nikolayevsky concentrator

%

 1.35

 1.46

 1.52

Belousovsky concentrator

%

 1.50

 1.51

 1.50

Bozymchak concentrator

%

 0.86

 0.88

 0.90

Average recovery rate

%

88.5

 90.1

 91.0

East Region

%

88.3

90.3

91.2

Bozymchak

%

89.9

88.1

89.6

Copper in concentrate

kt

14.7

 17.8

 18.3

Orlovsky concentrator

kt

7.9

8.2

9.8

Nikolayevsky concentrator

kt

2.8

5.5

4.4

Belousovsky concentrator

kt

2.1

2.1

2.1

Bozymchak concentrator

kt

1.9

2.0

2.0

Copper production1

kt

14.0

16.7

17.3

East Region

kt

12.2

14.9

15.4

Bozymchak

kt

1.8

1.8

1.9

 

 

 

 

 

Zinc in concentrate

kt

14.2

 11.8

 15.5

Gold production1

koz

13.6

 13.0

 14.0

Silver production1

koz

574

549

596

      

1 Payable metal in concentrate.

Ore extraction volumes of 959 kt were 2% lower than the previous quarter and in line with Q1 2017.

Ore processing volumes decreased by 14% in Q1 2018 compared to the previous quarter and by 7% compared to the prior year comparative period. This was mainly due to the scheduled idling of the Nikolayevksy concentrator for 50 days, during which ore from the Artemyevsky mine was stockpiled for future processing to raise the utilisation rate of the concentrator over the remainder of the year.

The decrease in processing volumes led to a 16% reduction in copper production to 14.0 kt (Q4 2017: 16.7 kt). Copper production over the next nine months will be higher as the Nikolayevsky concentrator will process increased volumes and full year production guidance of around 65 kt is maintained.

Zinc in concentrate output increased by 20% to 14.2 kt compared to the previous quarter, with average processing grades rising from 2.19% in Q4 2017 to 2.95% in Q1 2018 as higher zinc grade zones were accessed at the Orlovsky (3.82%) and Irtyshsky mines (3.77%). The East Region is on track to achieve full year zinc guidance of around 60 kt.

Gold and silver production both increased by 5% compared to the previous quarter, to 13.6 koz and 574 koz respectively, due to higher grades at the East Region which more than offset the lower throughput volumes. Compared to Q1 2017, gold production decreased by 3% and silver output was 4% lower. Gold output is on track to achieve the guided range of 45-50 koz for 2018 with grades expected to reduce over the remainder of the year. Silver output is also on track to achieve full year expectations of around 2,000 koz.  

 

SALES VOLUMES, COMMODITY PRICES AND NET DEBT

 

Sales Volumes

The following table sets out the sales volumes of the Group's major products and includes pre-commercial sales volumes for Q1 2017.

 

 

 

Q1

 2018

Q1

 2017

Copper sales

kt

66.2

50.5

Copper cathode

kt

24.5

26.6

Copper in concentrate1

kt

41.7

23.9

Zinc in concentrate

kt

14.7

15.8

Gold sales2

koz

45.1

38.9

Silver sales2

koz

771

1,097

1 Payable metal in concentrate.

2 Payable metal in concentrate and toll processed metal.

 

 

Total copper in concentrate sales were 41.7 kt in the three months to 31 March 2018, an increase of 17.8 kt over Q1 2017. This was due to additional volumes from the Bozshakol sulphide plant, which is now operating at near design capacity, and the ramp up of production from the Aktogay sulphide plant. Copper cathode sales volumes were 2.1 kt below Q1 2017 resulting from lower production at the East Region, partly offset by increased Aktogay sulphide material toll processed into cathodes. Gold sales increased by 6.2 koz due to higher production from the Bozshakol sulphide plant. Silver sales were marginally lower than production and 326 koz below the prior year comparative period following a release of inventory from the Balkhash smelter in Q1 2017.

Commodity Prices

At 31 March 2018, the Group's provisionally priced copper in concentrate volumes were 25 kt at an average provisional price of $6,345/t. The copper in concentrate provisional prices are below LME prices due to the deduction of treatment and refining charges. For further details on the Group's provisional pricing arrangements please refer to Note 4(b) of the 2017 Annual Report and Accounts.

Commodity Hedging

The Group's policy is generally not to hedge commodity prices. At 31 March 2018, there were no commodity price hedges in place.

Net Debt

Net debt increased to $2,206 million at 31 March 2018 from $2,056 million at 31 December 2017 due to the payment of $250 million deferred from 2016-17 to the Aktogay construction contractor, interest payments of $94 million under the Group's debt facilities and mineral extraction tax and royalty payments of $58 million. Total cash and cash equivalents at 31 March 2018 amounted to $1,526 million with gross debt at $3,732 million.

 

 

 

APPENDIX - METAL PRODUCTION

 

 

Q1 2018

Q4

2017

Q1 2017

Copper production1

kt

67.3

65.2

52.1

Bozshakol

kt

26.9

22.5

22.9

Aktogay

kt

26.4

26.0

11.9

East Region

kt

12.2

14.9

15.4

Bozymchak

kt

1.8

1.8

1.9

Zinc in concentrate

kt

14.2

11.8

15.5

Bozshakol

kt

-

-

-

Aktogay

kt

-

-

-

East Region

kt

14.2

11.8

15.5

Bozymchak

kt

-

-

-

Gold production2

koz

49.9

40.9

42.6

Bozshakol

koz

36.0

27.9

28.5

Aktogay

koz

0.3

-

0.1

East Region

koz

3.8

3.6

3.9

Bozymchak

koz

9.8

9.4

10.1

Silver production2

koz

852

798

795

Bozshakol

koz

183

170

161

Aktogay

koz

95

79

38

East Region

koz

516

493

532

Bozymchak

koz

58

56

64

Payable metal in concentrate and copper cathode from Aktogay oxide ore.

Payable metal in concentrate.

 

TOLL PROCESSING & FINISHED METALS

 

Q1 2018

Q4

2017

Q1 2017

Copper cathodes

kt

25.6

26.7

25.6

Bozshakol (toll processed)

kt

2.7

0.7

0.9

Aktogay sulphide (toll processed)

kt

2.9

0.4

0.5

Aktogay oxide

kt

5.3

 6.7

 4.7

East Region (toll processed)

kt

12.6

17.5

17.2

Bozymchak (toll processed)

kt

2.1

1.4

2.3

 

 

 

 

 

Gold bar produced (toll processed)

koz

16.0

20.8

15.0

Silver bar produced (toll processed)

koz

652

871

785

 

 

 

 

 

APPENDIX - EAST REGION & BOZYMCHAK

 

 

 

Q1 2018

Q4

2017

Q1 2017

Ore extraction

kt

959

977

961

Orlovsky

kt

279

266

275

Artemyevsky

kt

301

328

294

Irtyshsky

kt

158

158

157

Bozymchak

kt

221

225

235

Ore processed

kt

934

1,092

1,003

Orlovsky concentrator

kt

278

272

276

Nikolayevsky concentrator

kt

249

415

319

Belousovsky concentrator

kt

158

160

155

Bozymchak concentrator

kt

249

245

253

 

 

 

 

 

Zinc

 

 

 

 

Average grade processed

grade (%)

2.95

2.19

2.89

Orlovsky concentrator

grade (%)

3.81

2.87

3.99

Nikolayevsky concentrator

grade (%)

1.47

1.31

1.78

Belousovsky concentrator

grade (%)

3.77

3.31

3.20

Average recovery rate

%

70.1

63.6

71.8

Orlovsky concentrator

%

69.7

58.7

72.6

Nikolayevsky concentrator

%

65.2

63.6

71.0

Belousovsky concentrator

%

73.8

70.9

70.6

Zinc in concentrate

kt

14.2

11.8

15.5

Orlovsky concentrator

kt

7.4

4.5

8.0

Nikolayevsky concentrator

kt

2.4

3.5

4.0

Belousovsky concentrator

kt

4.4

3.8

3.5

 

 

 

 

 

Gold

 

 

 

 

Average grade processed

grade (g/t)

0.80

0.65

0.78

East Region

grade (g/t)

0.53

 0.38

 0.50

Bozymchak

grade (g/t)

1.53

 1.58

 1.63

Average recovery rate

%

60.2

61.0

59.2

East Region

%

34.0

 37.2

 34.5

Bozymchak

%

85.5

 80.8

 81.5

Gold in concentrate

koz

14.5

13.9

14.9

East Region

koz

4.0

 3.8

 4.1

Bozymchak

koz

10.5

 10.1

 10.8

Gold production1

koz

13.6

 13.0

 14.0

East Region

koz

3.8

 3.6

 3.9

Bozymchak

koz

9.8

 9.4

 10.1

 

 

 

 

 

Silver

 

 

 

 

Average grade processed

grade (g/t)

35.5

28.3

31.6

East Region

grade (g/t)

44.7

 33.4

 38.5

Bozymchak

grade (g/t)

10.2

 10.4

 11.2

Average recovery rate

%

59.2

60.8

64.2

East Region

%

57.6

 59.4

 63.0

Bozymchak

%

78.7

 75.3

 76.4

Silver in concentrate

koz

631

603

655

East Region

koz

567

 541

 585

Bozymchak

koz

64

 62

 70

Silver production1

koz

574

549

596

East Region

koz

516

 493

 532

Bozymchak

koz

58

 56

 64

1 Payable metal in concentrate. 