Operations Update - New Mill and Level 8

4th Sep 2013 08:00

RNS Number : 1865N
Medusa Mining Limited
04 September 2013
 

 

MEDUSA MINING LIMITED

ABN: 60 099 377 849

Unit 7, 11 Preston Street

Como WA 6152

PO Box 860

Canning Bridge WA 6153

Telephone: 618-9367 0601

Facsimile: 618-9367 0602

Email: [email protected]

Internet: www.medusamining.com.au

 

4 September 2013

 

 

OPERATIONS UPDATE - NEW MILL AND LEVEL 8

(ASX & LSE: MML)

Medusa Mining Limited ("Medusa" or the "Company"), through its Philippine operating company, Philsaga Mining Corporation, wishes to announce the following updates:

New Mill Circuit

The upgraded new milling circuit has been commissioned but, during load commissioning, a compartment of the SAG mill power pack failed. The controller to the power pack has also been deemed faulty and needs to be sent off site for repairs. This is a Vendor supplied, installed and commissioned package and the Vendor has recommended that the whole power pack and controller be returned to their workshops for repair. A complete new power pack unit will be supplied within the next 45 days, therefore, the mill will not be operating until the Vendor has installed and commissioned the new controller and power pack unit.

Production for the September Quarter will be marginally affected by the delay in the commissioning of the new mill but the guidance for the December Quarter will remain unchanged. 

Level 8 Development

Since the announcement of 30 June 2013, development on Level 8 has started to achieve improving results, including:

· operation of the ore pass from Level 6 to Level 8 which feeds the underground ore bin by conveyor;

· connection of the Level 8 development with the ventilation rise from Level 6.

· the discovery of a new vein (Don Pedro) parallel to the cross faulting direction, and so far developed over 100 metres with an average width of 2 metres and an average grade of 8 g/t gold. This is being set up for stoping.

· intersection of the high grade Great Hamish Footwall and Main Veins, as well as Catto and Jereme Veins. On-vein development on these has commenced.

· driving south is continuing, aiming to intersect the Great Hamish Hanging Wall and Roysan Veins during September.

For further information please contact:

Australia

Medusa Mining Limited

+61 8 9367 0601

Peter Hepburn-Brown, Managing Director

United Kingdom

SP Angel Corporate Finance LLP (Financial Adviser & Broker)

+44 (0)20 3463 2260

Ewan Leggat/Laura Littley

DISCLAIMER

This announcement contains certain forward-looking statements. The words 'anticipate', 'believe', 'expect', 'project', 'forecast', 'estimate', 'likely', 'intend', 'should', 'could', 'may', 'target', 'plan' and other similar expressions are intended to identify forward-looking statements. Indications of, and guidance on, future earnings and financial position and performance are also forward-looking statements. Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of Medusa, and its officers, employees, agents and associates, that may cause actual results to differ materially from those expressed or implied in such statements. Actual results, performance or outcomes may differ materially from any projections and forward-looking statements and the assumptions on which those assumptions are based. You should not place undue reliance on forward-looking statements and neither Medusa nor any of its directors, employees, servants or agents assume any obligation to update such information.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCMMGGLVDLGFZG

Related Shares:

MML.L
FTSE 100 Latest
Value8,762.58
Change-12.07