Become a Member
  • Track your favourite stocks
  • Create & monitor portfolios
  • Daily portfolio value
Sign Up
Quickpicks
Add shares to your
quickpicks to
display them here!

Mollacas Project Update

16th Jan 2012 07:37

RNS Number : 5992V
Metminco Limited
16 January 2012
 



 

 

Level 6, 122 Walker St

North Sydney, NSW 2060

Australia

T +61 (0)2 9460 1856

F +61 (0)2 9460 1857

 

16 January 2012

ASX ANNOUNCEMENT

 

MOLLACAS COPPER LEACH PROJECT

·; DRILLING CONFIRMS CONTINUITY OF SUPERGENE ENRICHMENT ZONE

·; TALL COLUMN LEACH TESTWORK COMMENCES

 

 

Latest drilling results from Metminco's 100% owned Mollacas copper leach project in Chile confirms the continuity of the copper oxide and enriched supergene zones. To view the complete press release including a surface geological plan showing the drill hole locations and extent of mineralised envelope at the Mollacas Project please download the following pdf http://www.rns-pdf.londonstockexchange.com/rns/5992V_1-2012-1-16.pdf.

Metminco has now received all assay data for drill holes MD 61 to MD 84, which completes the drilling phase of the project in advance of completing a final resource estimate, conducting confirmatory metallurgical testwork and commissioning a feasibility study.

These drill holes form part of an in-fill drilling program designed to convert current resources into JORC-compliant Measured and Indicated Resource categories, as well as to define the outer limits of the oxide and supergene mineralisation. Significant intersections are summarised in Table 1 below.

 

Table 1: Mollacas Project: Summary of significant intersections.

 

MD 61

33

0.53%

Oxide

0

33

23

0.45%

Supergene

34

57

MD 67

10

0.60%

Oxide

27

37

57

0.70%

Supergene

53

110

MD 70

38

0.78%

Oxide

37

75

27

0.71%

Supergene

75

102

MD 74

47

0.96%

Supergene

42

89

MD 76

31

0.47%

Oxide

20

51

37

0.67%

Supergene

52

89

MD 81

12

1.01%

Supergene

39

51

MD 83

27

0.57%

Supergene

42

69

 

 

Mollacas Project 

The Mollacas copper leach project, prior to this drill program, had a JORC-compliant resource of 17 million tonnes consisting of Indicated Resources of 7.2 million tonnes @0.56% copper and Inferred Resources of 9.8 million tonnes @0.52% copper (at a 0.2% copper cut-off grade). The in-fill drilling program was designed to upgrade the current resource in advance of the feasibility study planned for H1 2012, and the subsequent development of the project.

The drilling program comprised 23 diamond drill holes (2,250 metres) for resource definition and metallurgical testwork purposes (Tables 1 and 2), and 1,154m of reverse circulation drilling for hydrological testwork.

A final resource estimate based on the in-fill drilling results is expected in Q1 2012. A further metallurgical testwork program has commenced with the selection of samples for tall column leach testwork in order to facilitate the optimal design of the plant and leach circuit.

The Company is close to finalising the environmental base line study for the project and has completed the purchase of land and water rights for its development. It is anticipated that the application to the Chilean Government authorities for a development licence will be completed Q4 2012.

 

 

 

Table 2: Mollacas Project: Summary of in-fill drill hole results.

 

MD 61

90

0

33

33

0.53

Oxide

34

57

23

0.45

Supergene

MD 62

90

41

50

9

0.18

Supergene

MD 63

75

36

75

39

0.32

Primary

MD 64

110

51

103

52

0.15

Supergene

MD 65

120

31

65

34

0.15

Oxide

70

112

42

0.37

Supergene

MD 66

90

41

53

12

0.10

Supergene

MD 67

120

27

37

10

0.60

Oxide

41

53

12

0.24

Oxide

53

110

57

0.70

Supergene

MD 68

60

15

26

11

0.50

Supergene

MD 69

135

71

103

32

0.54

Supergene

MD 70

120

37

75

38

0.78

Oxide

75

102

27

0.71

Supergene

MD 71

63

49

55

6

0.32

Primary

MD 72

50

14

37

23

0.46

Supergene

MD 73

80

0

25

25

0.42

Oxide

MD 74

100

42

89

47

0.96

Supergene

MD 75

120

115

118

3

0.23

Primary

MD 76

105

20

51

31

0.47

Oxide

52

89

37

0.67

Supergene

MD 77

110

13

37

24

0.58

Oxide

44

79

35

0.57

Supergene

MD 78

nil

MD 79

80

35

76

41

0.42

Supergene

including

35

51

16

0.77

Supergene

MD 80

80

0

29

29

0.39

Oxide

44

80

36

0.48

Supergene

MD 81

70

0

9

9

0.26

Oxide

39

51

12

1.01

Supergene

MD 82

110

58

73

15

0.34

Oxide

80

110

30

0.26

Supergene

MD 83

90

42

69

27

0.57

Supergene

MD 84

85

48

56

8

0.17

Supergene

 

 

 

William Howe

Managing Director

 

About Metminco:

Metminco is a dual ASX and AIM listed company with a portfolio of copper and gold projects in Peru and Chile. The Los Calatos project, located in southern Peru, has a JORC compliant resource of 926 million tonnes, comprising Indicated Resources of 111 million tonnes at 0.39% Cu and 380ppm Mo, and an Inferred Resource of 815 million tonnes at 0.37% Cu and 260ppm Mo (at a 0.2% copper cut-off grade).

The Chilean assets include the Mollacas copper leach project with a JORC compliant resource of 17 million tonnes consisting of Indicated Resources of 7.2 million tonnes at 0.56% copper and Inferred Resources of 9.8 million tonnes @ 0.52% copper (at a 0.2% copper cut-off grade); and the Vallecillo gold zinc project with a JORC compliant resource of 10.1 million tonnes consisting of Indicated Resources of 7.9 million tonnes @ 1.14g/t Au; 11.4g/t Ag; 1.32% Zn; 0.29% Pb and an Inferred Resource of 2.2 million tonnes @ 0.78g/t Au; 8.2g/t Ag; 0.58% Zn; 0.26% Pb (at a cut-off grade of 0.3g/t Au).

 

Competent Persons Statement

The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Colin Sinclair, BSc, MSc, who is a Member of the Australasian Institute of Mining and Metallurgy and is a full-time employee of the Company as General Manager Exploration.

Colin Sinclair has sufficient experience (over 30 years) which is relevant to the style of mineralisation, type of deposit under consideration, and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results'. Mr Sinclair, as Competent Person for this announcement, has consented to the inclusion of this information in the form and context in which it appears herein.

For further information please contact:

 

 

South America:

William Howe - Managing Director Ph: +56 (2) 411 2600

 

 

Australia:

Stephen Tainton - Investor Relations Ph: +61 (0) 9460 1856

Philip Killen - Company Secretary & CFO Ph: +61 (0) 408 609 916

Broker - BGF Equities

Warwick Grigor / Marcus Freeman Ph: +61 3 8688 9100

Financial Public Relations Consultant - Collins St Media

Ian Howarth Ph: +61 (0) 407 822 319

 

 

United Kingdom:

Tim Read - Non-Executive Director Ph: +44 (0) 777 072 1809

Nomad and Joint Broker - Canaccord Genuity Limited

Robert Finlay/ Andrew Chubb Ph: +44 (0) 207 050 6500

Joint Broker - Liberum Capital Limited

Michael Rawlinson / Clayton Bush Ph: +44 (0) 20 3100 2227

Financial Public Relations Consultant - Buchanan

Tim Thompson / James Strong Ph: +44 (0) 20 7466 5000

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEAXFKFDAAEEF

Related Shares:

Metminco
FTSE 100 Latest
Value8,275.66
Change0.00