Become a Member
  • Track your favourite stocks
  • Create & monitor portfolios
  • Daily portfolio value
Sign Up
Quickpicks
Add shares to your
quickpicks to
display them here!

Leon Project Update

15th Sep 2006 07:31

Alexander Mining PLC15 September 2006 Alexander Mining plc 15 September 2006 Leon Project Update • Leon feasibility study progressing well. • Pilot SX/EW (solvent extraction/electro-winning) processing plant on site. • Additional phase of resource drilling in Leon valley and newly discovered talus zone underway. • Leon regional exploration programme continues to generate new interesting outcrops and targets, with drilling on two of the already identified targets imminent. Alexander Mining plc ("Alexander", "the Company"), the AIM-listed copper, goldand silver mining company with projects in Argentina and Peru, is pleased torelease this Leon Project Update. Leon Project Good progress continues to be made with advancing Leon towards completion of thefeasibility study and a decision to proceed with mine construction. The pilot SX/EW processing plant brought in from Chile is on site ready to treatthe bulk sample from El Cobre which has been stacked on the leach pad. El Cobreis the zone targeted for initial mining. A 50m deep process water and groundwater monitoring well has been drilled. Keyprofessional appointments continue, with the hiring of a project manager, ametallurgist and an environmental/community relations officer. Photographs of the plant and the test heap can be seen on our website:www.alexandermining.com Additional resource drilling After review of the completed drilling programme, leading to the publishedindependent JORC Code compliant resource calculation, additional drill holesdesigned to add to the reported resource have been determined. This willcomprise some 15 diamond drill holes, which are currently in progress. Inaddition, sampling and trenching is underway on recently identified copper/silver talus material identified at the base of the Leon valley and near to theproposed mine leach pad location. Leon Regional Exploration Programme The regional reconnaissance work programme for Alexander's 100,000 hectaresclaim area is ongoing to build upon the reported identification of ninemineralised targets. Follow-up and further investigation is progressing well,with initial drilling planned to start at the end of September and designed toevaluate the El Salto (S block) and the El Vampiro areas. Matt Sutcliffe, Chairman and Chief Executive Officer, said: "We are pleased bythe rapid progress being made at Leon. Also, we are encouraged by the potentialof the additional drilling at Leon and the evaluation of the talus to add tomineral resources. Moreover, the regional Leon exploration programme isbecoming increasingly prospective as reconnaissance of our large claims areacontinues apace in identifying interesting outcrops of copper mineralisation." For further information please contact: Alexander Mining plc Matt Sutcliffe, Chairman and Chief Executive Officer1st Floor, 35 PiccadillyLondon, W1J 0DW Tel: +44 (0) 20 7292 1300Fax: +44 (0) 20 7292 1313Mobile: +44 (0) 7887 930 758Email: [email protected]: www.alexandermining.com Nominated Advisor and Broker Graham SwindellsArbuthnot Securities LimitedArbuthnot House, 20 Ropemaker StreetLondon, EC2Y 9ARTel: +44 (0) 20 7012 2000 Public/Media Relations Gary MiddletonSt Swithins Public RelationsTel: +44 (0) 20 7929 4391Mobile: +44 (0) 7951 603 289 Notes for editors Alexander Mining plc is a mining company that intends to grow rapidly into a lowcost and highly profitable diversified metal producer. The Company has a highlyskilled management team with expertise in both natural resources and finance. END This information is provided by RNS The company news service from the London Stock Exchange

Related Shares:

eEnergy Group
FTSE 100 Latest
Value8,837.66
Change27.92