Become a Member
  • Track your favourite stocks
  • Create & monitor portfolios
  • Daily portfolio value
Sign Up
Quickpicks
Add shares to your
quickpicks to
display them here!

Leighton Update

7th Sep 2009 07:23

RNS Number : 6097Y
Global Petroleum Ltd
07 September 2009
 



7 September 2009

RNS AIM release

DRILLING COMMENCES ON FOURTH PRODUCTION WELL - LEIGHTON OIL AND GAS FIELD

Texon Petroleum Ltd (ASX: TXNhas advised that the fourth Leighton well, Tyler Ranch #3, commenced drilling on 5 September 2009. The well has a planned total depth of 2,743 metres (9,000 feet) and will take about 12-15 days to reach its target, which is the same oil and gas reservoir as in the first three Leighton wells (Peeler #1, Tyler Ranch #1 and Tyler Ranch #2).

Tyler Ranch #3 is located 420 metres south of Tyler Ranch #1.

Global has a 15% working interest (11.25% net revenue interest) in the Leighton Project with joint venture parties Texon Petroleum Limited (70%) and Excellong, Inc (15%).

Testing of the recently drilled Tyler Ranch #2 is planned for Wednesday, 9 September 2009. If the test is successful, the well will be placed on production as soon as testing has been concluded - probably by mid September.

Enquiries:

Global Petroleum Limited

Shane Cranswick

Tel

+ 61 8 9322 6322

Email

[email protected]

Astaire Securities Plc (Nominated Adviser and Broker)

William Vandyk

Tel

+44 20 7448 4400

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLQDLBBKKBLBBB

Related Shares:

Global Petroleum
FTSE 100 Latest
Value8,275.66
Change0.00