Become a Member
  • Track your favourite stocks
  • Create & monitor portfolios
  • Daily portfolio value
Sign Up
Quickpicks
Add shares to your
quickpicks to
display them here!

Leighton Update

30th Apr 2010 07:20

RNS Number : 1089L
Global Petroleum Ltd
30 April 2010
 



 

30 April 2010

RNS AIM release

SIXTH LEIGHTON WELL FLOWS OIL AND GAS 445 BOEPD

 

Texon Petroleum Ltd (ASX: TXN) has advised that that the sixth well on the Leighton Project, Tyler Ranch #5, has begun to flow oil and gas at the gross rate of 445 boepd from the Olmos reservoir (comprising 420 bopd and 150 mcf of gas per day) through a 8/64" choke.

 

The combined production rate of the five (5) existing Leighton wells (Peeler #1, Tyler Ranch #1, Tyler Ranch #2, Tyler Ranch #3 and Tyler Ranch # 4) at this time is a gross 460 boepd with Global's Working Interest share being 69 boepd.

 

Tyler Ranch #5 has been connected to oil tanks and a gas sales pipeline so that Global will now begin to obtain revenue from the production. The time from well spud to revenue earning production has been 22 days.

 

Global has a 15% working interest (11.25% net revenue interest) in the Leighton Project with joint venture parties Texon Petroleum Limited and Excellong, Inc.

 

 

 

Glossary:

bbl: barrel

boepd: barrels of oil equivalent per day (including gas converted to oil equiv barrels on basis of 6mcf to 1 barrel of oil equiv)

bopd: barrels of oil per day

mcf: thousand cubic feet

mmbtu: million British thermal units

psi: pounds per square inch

 

 

 

Enquiries:

 

Global Petroleum Limited

Shane Cranswick

Tel

+ 61 8 9322 6322

Email

[email protected]

Astaire Securities Plc (Nominated Adviser and Broker)

William Vandyk

Tel

+44 20 7448 4400

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCQBLBXBZFFBBD

Related Shares:

Global Petroleum
FTSE 100 Latest
Value8,275.66
Change0.00