18th Mar 2021 12:00
This announcement contains inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 which is part of UK law by virtue of the European Union (Withdrawal) Act 2018.
18 March 2021
Ferro-Alloy Resources Limited ('the Company' or 'FAR')
Issue of Equity
Ferro Alloy Resources Limited (LSE: FAR), the vanadium mining and processing company with operations based in Southern Kazakhstan, announces that further to the announcement on 15 March and the issue by FAR of, in aggregate, 11,971,463 new ordinary shares ("Shares") in the Company, application has been made for admission of the Shares to the Official List of the FCA (Standard Segment) and trading on the London Stock Exchange's Main Market for listed securities ("Admission") which is expected to occur at 8 a.m. on or around 19 March 2021.
For further information, visit www.ferro-alloy.com or contact:
*ENDS*
Nick Bridgen, Chief Executive Officer [email protected]
Shore Capital (Corporate Broker)
Corporate Advisory: Toby Gibbs / Mark Percy / John More Tel: +44 (0)207 408 4090
Corporate Broking: Jerry Keen
VSA Capital Tel: +44 (0)203 005 5000
Andrew Monk / Simon Barton
St Brides Partners Limited (Financial PR & IR Adviser)
Catherine Leftley / Megan Dennison Tel: +44 (0)207 236 1177
About Ferro Alloy Resources Limited:
The Company's operations are all located at the Balasausqandiq Deposit in Kyzylordinskaya Oblast in the South of Kazakhstan. Currently the Company has two main business activities:
a) the high grade Balasausqandiq Vanadium Project (the "Balausa Project"); and
b) an existing profitable vanadium concentrate processing operation (the "Existing Operation")
Balasausqandiq is a very large deposit, with vanadium as the principal product, together with numerous byproducts. Owing the nature of the ore, the capital and operating costs of development are very much lower than for other projects.
A reserve on the JORC 2012 basis has been estimated only for the first ore-body (of five) which amounts to 23 million tonnes, not including the small amounts of near-surface oxidised material which is in the Inferred resource category. In the system of reserve estimation used in Kazakhstan the reserves are estimated to be over 70m tonnes in ore-bodies 1 to 5 but this does not include the full depth of ore-bodies 2-5.
There is an existing concentrate processing operation at the site of the Balasausqandiq Deposit. The production facilities were originally created from a 15,000 tonnes per year pilot plant which was then adapted to treat low-grade concentrates and is now in the process of being expanded and further adapted to treat a wider variety of raw materials.
The Company has already completed the first steps of a development plan for the existing operation which is expected to result in annualised production capacity increasing gradually to around 1,500 tonnes of contained vanadium pentoxide. The development plan includes upgrades to infrastructure, an extension to the existing factory and the installation of equipment to increase the throughput and to add the facilities to convert AMV into vanadium pentoxide.
The strategy of the Company is to develop both the Existing Operation and the Project in parallel. Although they are located on the same site and use some of the same infrastructure, they are separate operations.
Related Shares:
Ferro-alloy Re.