Become a Member
  • Track your favourite stocks
  • Create & monitor portfolios
  • Daily portfolio value
Sign Up
Quickpicks
Add shares to your
quickpicks to
display them here!

High Grade Uranium Intersections - Chirundu J/V

8th Dec 2008 07:20

RNS Number : 6908J
Albidon Limited
08 December 2008
 



Albidon Limited

level 1

62 colin street

west perth WA 6005

Australia

Telephone: +61 89211 4600

Facsimile: +61 8 9211 4699

 

8 December 2008

HIGH-GRADE URANIUM INTERSECTIONS IN GWABE RESOURCE DELINEATION DRILLING, CHIRUNDU JVZAMBIA

 

http://www.rns-pdf.londonstockexchange.com/rns/6908J_-2008-12-8.pdf

 

HIGHLIGHTS:

Reverse circulation (RC) drilling at the Gwabe uranium deposit in the Chirundu JV continues to deliver good assay results as part of the resource infill drilling programme.

Recently received assay results from infill RC drilling at the Gwabe deposit continue to demonstrate ore grades and thicknesses of uranium mineralisation, and include:

Hole

From (m)

To (m)

Interval (m)

U3O8 ppm

GWN293

15

25

10

907

GWN235

16

28

12

669

GWN301

14

26

12

621

GWN244

22

30

8

625

GWN253

7

23

16

294

GWN297

20

34

14

313

GWN243

21

28

7

599

GWN229

11

24

13

190

GWN255

13

21

8

289

GWN228

14

21

7

330

GWN299

16

25

9

256

GWN257

7

15

8

273

All resource delineation drilling and core drilling to provide samples for metallurgical test work at the Njame and Gwabe deposits in the Chirundu JV has been completed.

A Measured and Indicated Resource statement will be finalised in Q1, 2009.

Metallurgical test work to finalise design of the Process Flowsheet and to optimise mineral processing parameters has commenced at Mintek Laboratories in Johannesburg.

 

INTRODUCTION

The Bankable Feasibility Study ("BFS") for the Chirundu Uranium Project commenced in May 2008. It comprises two deposits in Zambia, Njame and Gwabe, and is a joint venture between African Energy Resources Limited (the JV Manager and 70% equity holder) and Albidon Exploration Limited (30% equity holder)

The project is located 150km by road from the Zambian capital city, Lusaka (Diagram 1). 

Prefeasibility Studies (PFS) completed in 2008 demonstrated that commercially viable mining of uranium from the Chirundu JV is possible under the projected uranium price, capital cost and operating cost scenarios derived from the PFS, with mining operations to be by open pit methods and using an acid heap leach and ion-exchange recovery process.

In October 2008, the joint venture participants announced that some aspects of the BFS would be suspended due to deteriorating market conditions and commodity prices. However, the update of the mineral resources to Measured and Indicated categories, the metallurgical test work programme to design and optimize the Process Flowsheet and an assessment of mining options would continue as planned. The suspension of the other aspects of the BFS will be reviewed in the first quarter of 2009.

RESOURCE DRILLING UPDATE

Infill drilling programmes at Gwabe and Njame were completed in early October 2008, satisfying the following goals:

Reverse circulation (RC) percussion drilling to decrease the spacing between sampling points to permit a higher confidence resource classification to be derived. 

Drill hole spacing has locally been reduced to a 25m x 25m grid at Njame to provide enough information to derive a Measured Resource for the first two years of planned production, with the remainder of Njame and all of Gwabe drilled to a 100m x 50m or 50m x 50m grid suitable for an Indicated Resource (refer to Diagrams 2 and 3).

A programme of large diameter core drilling (PQ core, 85mm diameter) at both deposits was completed to supplement the assay samples collected from RC drilling, to provide core for geotechnical logging and to provide up to 20 tonnes of mineralised sample for metallurgical test work.

The RC drilling programme was completed in mid-September, ahead of schedule and on budget, and the core drilling programme was completed in early October. Assays results for most of the RC drilling have been received, but those for the diamond drill core will not be available until January 2009. These data will be used as the basis for a resource upgrade to Measured and Indicated Resources, as outlined above.

Initial assay results from the infill RC drilling programme at Gwabe have been received, and continue to confirm the presence of ore grades and thicknesses of uranium mineralisation (refer to Table 1 below, Diagram 3 and Table 2):

Table 1. Significant assay intersections in Gwabe RC infill drilling

Hole

From (m)

To (m)

Interval (m)

U3O8 ppm

Hole

From (m)

To (m)

Interval (m)

U3O8 ppm

GWN293

15

25

10

907

GWN235

16

28

12

669

GWN301

14

26

12

621

GWN244

22

30

8

625

GWN253

7

23

16

294

GWN297

20

34

14

313

GWN243

21

28

7

599

GWN229

11

24

13

190

GWN255

13

21

8

289

GWN228

14

21

7

330

GWN299

16

25

9

256

GWN257

7

15

8

273

GWN295

16

24

8

249

GWN251

20

29

9

190

GWN281

10

18

8

209

GWN227

9

18

9

180

GWN256

19

27

8

177

GWN250

19

26

7

190

GWN277

23

27

4

257

The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the 'JORC Code') sets out minimum standards, recommendations and guidelines for Public Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves. The information contained in this announcement has been presented in accordance with the JORC Code and references to "Measured and Indicated Resources" are to those terms as defined in the JORC Code.

Information in this report relating to Exploration results, Mineral Resources or Ore Reserves is based on information compiled by Dr Frazer Tabeart (an employee and the Managing Director of African Energy Resources Limited) who is a member of The Australian Institute of Geoscientists. Dr Tabeart has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person under the 2004 Edition of the Australasian Code for reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr Tabeart consents to the inclusion of the data in the form and context in which it appears.

For more information about Albidon and its projects please visit our web site at www.albidon.com or contact: Paul Chapman or Alasdair Cooke (Albidon's Joint Managing Directors) on +61 8 9211 4600 or email [email protected]

Albidon's nominated adviser is RFC Corporate Finance Ltd, contact Stephen Allen +61 8 9480 2500

  

Table 2 Drill collar coordinates (wgs84 utm35S) and assays for Gwabe infill drilling programme. 

All holes drilled vertically. All assays by XRF pressed pellet method XRF-05u at ALS Chemex laboratories. 

NSI = no significant intersection in hole TBA = assays yet to be received

Hole

Depth

Type

Northing

Easting

RL

From

To

Interval

U3O8 ppm

Hole

Depth

Type

Northing

Easting

RL

From

To

Interval

U3O8 ppm

GWN227

36.00

RC

8,232,621

690,240

408

9

18

9

180

GWN228

36.00

RC

8,232,669

690,205

396

14

21

7

330

GWN229

32.00

RC

8,232,663

690,268

389

11

24

13

190

GWN230

34.00

RC

8,232,740

690,115

405

17

24

7

112

GWN231

23.00

RC

8,232,894

690,104

396

NSI

GWN232

34.00

RC

8,232,852

690,148

408

NSI

GWN233

28.00

RC

8,232,817

690,176

403

NSI

GWN234

30.00

RC

8,232,692

690,326

389

19

24

5

193

GWN235

34.00

RC

8,232,655

690,355

391

16

28

12

669

GWN236

32.00

RC

8,232,595

690,435

394

TBA

GWN237

32.00

RC

8,232,510

690,505

377

TBA

GWN238

34.00

RC

8,232,556

690,600

380

19

23

4

202

GWN239

30.00

RC

8,232,492

690,687

389

TBA

GWN240

35.00

RC

8,232,458

690,581

392

23

26

3

160

GWN241

30.00

RC

8,232,629

690,538

387

TBA

GWN242

34.00

RC

8,232,699

690,461

383

25

28

3

162

GWN243

34.00

RC

8,232,737

690,427

383

21

28

7

599

GWN244

36.00

RC

8,232,768

690,380

389

22

30

8

625

GWN245

28.00

RC

8,232,986

690,154

417

NSI

GWN246

28.00

RC

8,232,964

690,168

402

NSI

GWN247

33.00

RC

8,232,929

690,209

399

NSI

GWN248

37.00

RC

8,232,902

690,240

392

25

30

5

150

GWN249

31.00

RC

8,233,038

690,240

387

11

16

5

142

GWN250

37.00

RC

8,233,008

690,269

395

19

26

7

190

GWN251

37.00

RC

8,232,975

690,304

395

20

29

9

190

GWN252

34.00

RC

8,233,083

690,337

391

26

28

2

418

GWN253

32.00

RC

8,233,039

690,376

388

7

23

16

294

GWN254

28.00

RC

8,233,075

690,414

396

16

21

5

198

GWN255

27.00

RC

8,233,088

690,481

377

13

21

8

289

GWN256

32.00

RC

8,233,046

690,454

395

19

27

8

177

GWN257

25.00

RC

8,233,118

690,452

382

7

15

8

273

GWN258

27.00

RC

8,233,126

690,381

375

TBA

GWN259

25.00

RC

8,233,077

690,201

383

NSI

GWN261

23.00

RC

8,233,147

690,270

388

NSI

GWN263

23.00

RC

8,233,152

690,343

382

NSI

GWN265

20.00

RC

8,233,184

690,311

397

NSI

GWN267

20.00

RC

8,233,222

690,373

403

NSI

GWN269

23.00

RC

8,233,185

690,378

396

NSI

GWN271

23.00

RC

8,233,252

690,364

384

NSI

GWN273

27.00

RC

8,233,222

690,408

381

NSI

GWN275

25.00

RC

8,233,148

690,417

373

2

6

4

202

GWN277

32.00

RC

8,232,804

690,489

385

23

27

4

257

GWN279

30.00

RC

8,232,876

690,564

380

TBA

GWN281

23.00

RC

8,233,197

690,693

386

10

18

8

209

GWN283

35.00

RC

8,233,197

690,693

386

NSI

GWN285

45.00

RC

8,233,067

690,732

396

TBA

GWN287

25.00

RC

8,233,303

690,411

384

NSI

GWN289

30.00

RC

8,233,268

690,439

380

NSI

GWN291

30.00

RC

8,233,225

690,479

383

NSI

GWN293

26.00

RC

8,233,170

690,485

377

15

25

10

907

GWN295

27.00

RC

8,233,199

690,518

392

16

24

8

249

GWN297

34.00

RC

8,233,231

690,548

383

20

34

14

313

GWN299

33.00

RC

8,233,185

690,589

389

16

25

9

256

GWN301

28.00

RC

8,233,162

690,561

385

14

26

12

621

GWN260

33.00

DDH

8,232,698

690,230

403

TBA

GWN262

32.00

DDH

8,232,733

690,195

395

TBA

GWN264

35.00

DDH

8,232,741

690,268

390

TBA

GWN266

30.00

DDH

8,232,779

690,229

399

TBA

GWN268

35.00

DDH

8,232,781

690,304

393

TBA

GWN270

32.00

DDH

8,232,805

690,263

391

TBA

GWN272

30.50

DDH

8,232,843

690,228

393

TBA

GWN274

36.00

DDH

8,232,863

690,277

389

TBA

GWN276

40.00

DDH

8,232,909

690,300

387

TBA

GWN278

40.00

DDH

8,232,888

690,333

393

TBA

GWN280

38.50

DDH

8,232,858

690,365

376

TBA

GWN282

40.00

DDH

8,232,943

690,343

404

TBA

GWN284

37.00

DDH

8,232,910

690,386

380

TBA

GWN286

29.00

DDH

8,232,865

690,419

385

TBA

GWN288

33.50

DDH

8,232,834

690,461

379

TBA

GWN290

30.50

DDH

8,232,905

690,451

387

TBA

GWN292

35.00

DDH

8,233,030

690,335

387

TBA

GWN294

35.50

DDH

8,232,988

690,356

400

TBA

GWN296

35.50

DDH

8,233,014

690,407

375

TBA

GWN298

29.00

DDH

8,233,016

690,472

381

TBA

GWN300

32.10

DDH

8,232,985

690,453

401

TBA

GWN302

32.00

DDH

8,232,951

690,491

377

TBA

GWN303

30.50

DDH

8,232,916

690,525

385

TBA

GWN304

25.00

DDH

8,232,987

690,591

384

TBA

GWN305

28.00

DDH

8,233,014

690,553

TBA

GWN306

28.00

DDH

8,233,056

690,523

369

TBA

GWN307

37.00

DDH

8,233,047

690,662

375

TBA

GWN308

37.50

DDH

8,233,097

690,623

398

TBA

GWN309

28.00

DDH

8,233,127

690,582

376

TBA

GWN310

35.00

DDH

8,233,160

690,623

379

TBA

GWN311

45.50

DDH

8,233,131

690,656

390

TBA

GWN312

45.50

DDH

8,233,097

690,691

402

TBA

GWN313

30.50

DDH

8,232,668

690,262

387

TBA

GWN314

33.00

DDH

8,232,621

690,240

408

TBA

.

Location of the Chirundu Uranium JV Project and the prospects referred to in the text. See Diagram 1 in the hyperlink above 

Drill location plan for Gwabe showing the locations of all drill holes completed for resource delineation drilling on a background image of the airborne radiometric survey uranium channel. See Diagram 2 in the hyperlink above  

Drill location plan for Gwabe showing the locations of drill holes completed for resource delineation drilling coded by assay grade multiplied by intersection thickness, and highlighting those holes referenced in the text. See Diagram 3 in the hyperlink above

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFKFKDOBDKABK

Related Shares:

ALD.L
FTSE 100 Latest
Value8,775.40
Change14.44