Become a Member
  • Track your favourite stocks
  • Create & monitor portfolios
  • Daily portfolio value
Sign Up
Quickpicks
Add shares to your
quickpicks to
display them here!

First oil from Shelley

6th Aug 2009 09:45

RNS Number : 9900W
Premier Oil PLC
06 August 2009
 



PREMIER OIL plc

("Premier" or "the Company")

First oil from Shelley

6th August 2009

Premier is pleased to announce that oil production from the Shelley field commenced at approximately 0900 this morning from the first of two wells. The second well is expected on-stream within the next 48 hours.

Premier is the operator of the field with 100% equity, which it acquired as part of the acquisition of Oilexco North Sea Limited ("ONSL") in May this year.

The Shelley field was discovered in 1984 by the 22/2-2 well and is located in 95m of water approximately 40 km south of the Premier-operated Balmoral complex. The field is located in a Palaeocene Forties reservoir and contains 31 degree API oil.

The field has been developed using two horizontal subsea production wells equipped with downhole electric submersible pumps. The wells are connected via a short flowline, and a control umbilical, to the Sevan Voyageur FPSO.

Simon Lockett, Chief Executive Officer, commented:

"Prior to Premier's acquisition of ONSL, the development of the Shelley field had been stopped and the contract with Sevan had been terminated. I am delighted that we have been able to negotiate a new contract with Sevan and, with the support of our key suppliers, restart the development, achieving first production so soon."

Enquiries

Premier Oil plc Tel: 020 7730 1111

Simon Lockett

Pelham PR

James Henderson Tel: 020 7337 1501 / 07774 444 163

Gavin Davis Tel: 020 7337 1515 / 07910 104 660

Evgeniy Chuikov Tel: 020 7337 1513 / 07894 608 606

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFGGGRRVDGLZG

Related Shares:

PMO.L
FTSE 100 Latest
Value8,576.80
Change-26.12