Become a Member
  • Track your favourite stocks
  • Create & monitor portfolios
  • Daily portfolio value
Sign Up
Quickpicks
Add shares to your
quickpicks to
display them here!

Findings from boiler spine inspections at Heysham 1 nuclear power station

11th Aug 2014 07:37

11 August 2014

FINDINGS FROM BOILER SPINE INSPECTIONS AT HEYSHAM 1 NUCLEAR POWER STATION

Centrica notes the statement issued this morning by EDF Energy in connection with the findings from boiler spine inspections at Heysham 1 nuclear power station. Centrica has a 20% interest in EDF Energy's existing nuclear operations.

On this basis, the resulting reduction in output from the affected nuclear power stations is currently estimated to reduce Centrica's earnings per share in 2014 by around 0.3 pence per share.

ENDS

Enquiries:
Centrica Investor Relations +44 (0) 1753 494900
Centrica Media Relations +44 (0) 800 107 7014

Copyright Business Wire 2014


Related Shares:

Centrica
FTSE 100 Latest
Value8,275.66
Change0.00