Final Results

10th Nov 2014 07:00

RNS Number : 5332W
Lonmin PLC
10 November 2014
 



 

 

 

 

 

 

 

 

 

 

REGULATORY RELEASE

 

 

10 November 2014

 

2014 Final Results Announcement

 

Lonmin Plc, ("Lonmin" or "the Company"), one of the world's largest primary Platinum producers, today publishes its Final Results for the year ended 30 September 2014.

 

HIGHLIGHTS

 

Results dominated by strike impact

· Regrettably one fatality on 26 October 2013

· Improved Lost Time Injury Frequency Rate (LTIFR) by 4.6% to 3.34

· Lost 391,000 platinum saleable ounces due to five month strike

· Industry leading safe and exceptional ramp up in a record two months

· Operational flexibility maintained with available ore reserves at an average of 21 months production

· Exceptional instantaneous recovery rates improved to 86.2%

· Platinum sales of 441,684 ounces

 

Financial Results

· Underlying profit before tax $46 million ($158 million in 2013)

· Net debt of $29 million with available committed facilities of $575 million (Net cash of $201 million in 2013)

· Costs of idle production during the strike resulted in the cost of production per PGM ounce increasing by 47%

· Capital expenditure $93 million carefully managed through the strike

· Underlying earnings per share of 5.4 cents versus 20.5 cents in prior year

 

FY2015 Guidance

· Platinum saleable metal in concentrate production in the region of 750,000 ounces

· Sales of around 730,000 Platinum ounces

· Unit costs of production around R10,800 per PGM ounce

· Capital expenditure of around $250 million

· Stable operating environment is key

 

Medium-term Outlook

· Expect to maintain sales of circa 750,000 Platinum ounces supported by capital expenditure of around $250 million to $350 million per annum

· Contain future unit cost increases below wage inflation

· Cost reduction and productivity improvement programmes in place to ensure business is sustainable through all cycles - value benefits of more than R2.0 billion have been identified and will be targeted over the next three years

Lonmin Chief Executive Officer Ben Magara said: "This year has been unique, with a strike of unprecedented length halting production for five months. Notwithstanding that, we have made progress in a number of areas. Our ramp-up exceeded all expectations and we are renewing our operational credibility. Our business review has surfaced real opportunities to reduce costs, improve productivity and capital efficiency and we are seeing increasingly encouraging results in these areas. We have made significant management and operating model changes as we take Lonmin to the next level."

 

 

FINANCIAL HIGHLIGHTS

 

30 September 2014

30 September 2013

Revenue

$965m

$1,520m

Underlying i operating profit

$52m

$164m

Operating (loss) / profit ii

$(255)m

$147m

Underlying i profit before taxation

$46m

$158m

(Loss) / profit before taxation

$(326)m

$140m

Underlying i earnings per share

5.4c

20.5c

(Loss) / earnings per share

(33.0)c

31.2c

Trading cash (outflow) / inflow per share iii

(20.4)c

3.0c

Free cash outflow per share iv

(43.2)c

(28.9)c

Net (debt) / cash as defined by the Group v

$(29)m

$201m

Interest cover (times) vi

4.0x

16.4x

Gearing vii

0.6%

-

 

Footnotes:

i

Underlying results and (loss) / earnings per share are based on reported results and (loss) / earnings per share excluding the effect of special items as disclosed in note 3 to the financial statements.

ii

Operating (loss) / profit is defined as revenue less operating expenses before impairment of available for sale financial assets, finance income and expenses and before share of (loss) / profit of equity accounted investments.

iii

Trading cash flow is defined as cash flow from operating activities.

iv

Free cash flow is defined as trading cash flow less capital expenditure on property, plant and equipment and intangibles, proceeds from disposal of assets held for sale and dividends paid to non-controlling interests.

v

Net (debt) / cash as defined by the Group comprises cash and cash equivalents, bank overdrafts repayable on demand and interest bearing loans and borrowings less unamortised bank fees, unless the unamortised bank fees relate to undrawn facilities in which case they are treated as other receivables.

vi

Interest cover is calculated on the underlying operating (loss) / profit divided by the underlying net bank interest payable excluding exchange differences.

vii

Gearing is calculated as the net debt attributable to the Group divided by the total of the net debt attributable to the Group and equity shareholders' funds.

 

ENQUIRIES

 

Investors / Analysts:

Lonmin

Tanya Chikanza

Floyd Sibandze

+27 11 218 8300 / +44 20 7201 6007

+27 11 218 8300

 

Media:

Cardew Group

Anthony Cardew / James Clark

+44 20 7930 0777

Sue Vey

+27 72 644 9777

 

Notes to editors

 

Lonmin, which is listed on both the London Stock Exchange and the Johannesburg Stock Exchange, is one of the world's largest primary producers of PGMs. These metals are essential for many industrial applications, especially catalytic converters for internal combustion engine emissions, as well as their widespread use in jewellery.

 

Lonmin's operations are situated in the Bushveld Igneous Complex in South Africa, where nearly 80% of known global PGM resources are found.

 

The Company creates value for shareholders through mining, refining and marketing PGMs and has a vertically integrated operational structure - from mine to market. Underpinning the operations is the Shared Services function which provides high quality levels of support and infrastructure across the operations.

 

For further information please visit our website: http://www.lonmin.com

 

CONTENTS

 

This document contains the following sections:

· Chief Executive Officer's Review;

· Operational Review;

· Market Review;

· Reserves & Resources;

· Financial Review;

· Responsibility Statement of the Directors;

· Operating Statistics - 5 Year Review; and

· Financial Statements

CHIEF EXECUTIVE'S REVIEW

 

The Business

The huge impact of a strike of unprecedented length across the South African Platinum Group Metals (PGM) sector resulted in Lonmin losing 391,000 equivalent saleable Platinum ounces

 

Our majority union AMCU downed tools on 23 January 2014, demanding a basic wage of R12,500 from the three largest PGM producers in South Africa, including Lonmin. The three affected producers were clear that such demands were impossible to meet if they were to remain viable companies and protect jobs and investment. Lonmin negotiated and communicated collectively with its two peers. That was the right thing to do, but it did not stop us working towards building better relationships with AMCU and our employees.

 

On 24 June 2014 an agreement was reached for a return to work. We believe we can have real confidence in this three year agreement, as there is an undertaking that there would be no industrial action in its duration, in respect of the issues covered by the wage agreement. We also concluded agreements with our minority unions to ensure that every employee can be heard. Behind the scenes much was being done. We took early, decisive action during the strike to protect the business.

 

Firstly, we anticipated the end of the strike and we planned and prepared. We also made important operational decisions early and applied a disciplined approach to monitoring and securing our operations during the strike to position ourselves well for a re-start when the time came. Secondly, we resumed our processing operations in May using the knowledge we had to judge the strike was close to coming to an end.

 

Finally, we were bold in our approach to re-starting all our shafts. We prioritised shafts which would generate cash early, even though they may have been amongst our smaller and older shafts, before moving to our newer, bigger shafts some of which are higher cost assets. Without the strike we may have chosen to prioritise differently, but we were clear that we needed to be generating cash as early as possible.

 

The combination of all this early planning and hard work on relationships meant that we saw 85% of employees return on day one, June 25th. The huge logistics operation we put in place around key areas such as medical health, strike-related poverty and transport proved invaluable.

 

The end result was an industry leading ramp up, achieving full production safely within two months. We optimised the immediately available ore reserves and built on a rapidly established team ethos at the shafts. We did so with impressive safety numbers and with equally impressive (and at Saffy, record) tonnages. Shortly after achieving full production we reported to the market the first fatality-free year in Lonmin's history. In mining, moving from dormancy to production is perhaps the most dangerous of times, so despite the lengthy strike the fact that we were able to ramp up so fast, and so safely, is a huge achievement.

 

Combined with this, the decisive cash conservation measures we put in place to minimise cash burn, together with the effective management of our stock pipeline drawdown, resulted in much improved financial flexibility as we ramped up.

 

All these measures have resulted in our small net debt position of $29 million as at 30 September 2014, leaving significant headroom to the $575 million in banking facilities available to the Company. In all this our management, from the reconfigured executive leadership team (described further below) down through the tiers, has performed well, and is delivering.

 

In addition, we committed last year to explore our options around reducing costs and improving profitability. This work has been completed and we have identified value benefits of more than R2 billion over three years.

 

Strategic Priorities

In 2013 we began a fundamental review of our business. Throughout and after the subsequent five month strike in 2014 we took the opportunity to adapt our thinking. This has developed into the strategy, which takes into account the Board initiatives laid out in early 2013 around social and community issues as well as operational ones and comprises the following four pillars:

 

· Operational Excellence

· Enhance Balance Sheet Strength

· Our People and Relationships

· Corporate Citizenship Agenda

 

1. Operational Excellence

 

1.1 Safety

We strive to be the industry leader in safety and we believe that "Zero Harm" is achievable. This starts with the safety and wellbeing of our employees and extends to everything we do including minimising the environmental impact of our operations. We believe that integrating our operational and sustainability strategies will enable us to deliver on our goal of zero harm.

 

1.2 Priorities

Our highest short term priority is our excellent Marikana operations which are some of the best in the industry in terms of quality, safety and performance. We are also the industry leader in UG2 mining and processing technology, an increasingly important part of the ore mix in the industry.

 

Within our mining operations, we will strive to achieve balance between our eleven shafts. Some are smaller, older, in the latter stages of their operational life and highly cash generative whilst some are larger, newer, still ramping-up to full potential and are therefore not currently at premium efficiency and operating cost.

 

As we told the market we would at this time last year, we launched a comprehensive review of our assets and operations to address asset utilisation, reduce the total cost of ownership (TCO), improve capital efficiency and productivity and, therefore, profitability and cash flow and increase potential for paying dividends as the markets improve. All of this aims to ensure that Lonmin becomes a superior low cost PGM operator in the medium term, whilst prudently managing risk through all cycles.

 

As a result of the review, we concluded that our Marikana portfolio utilisation can be further optimised and our return on the limited capital invested, enhanced. Utilisation of shaft hoisting capacity is too low and our concentrator, smelting and refining capacity is greater than required for the volume of output from mining. This coupled with low productivity and a high fixed cost base presents an opportunity for Lonmin to improve profitability.

 

We are actively pursuing a process of allocating capital to projects that we believe will provide no less than 15% returns, taking account of risk, and we are reducing capital expenditure in line with cash generation

 

1.3 Actions

In light of priorities set out above the actions being taken will fall under the following headings:

 

· Marikana asset flexibility

· Cost savings

· Additional Projects 

1.3.1 Marikana asset flexibility

We have instituted new operating philosophies at old shafts in decline to maximize cash generation and minimise expenditure, specifically at East 1, East 2, East 3 and Newman.

 

We are accelerating improvement initiatives through theory of constraints at our big, low cost shafts of the future to increase and sustain shaft hoisting performance and improve capital efficiency. It is expected that K3, 4B/1B, Rowland, Saffy and Hossy shafts will benefit from this.

 

Saffy ramp-up profile was delivered in line with 2013 promises despite the strike. We have driven the optimal ramp-up of the shaft by maintaining 18 months of available ore reserve to support the required extraction rate, putting stoping crews in place ahead of schedule and improving crew efficiencies. We have deployed a highly skilled business improvement team to identify and eliminate bottlenecks and improved infrastructure to support planned production levels.

 

Hossy's long term plan has been adversely impacted by numerous capital deferrals over its life resulting in increased unit costs. We had already identified it as a high-cost marginal shaft. As we resumed operations following the strike, it was important to safely ramp up as quickly as possible. The significant attendance we saw across the entire business enabled us to restart all the shafts. However, we also discussed with the unions the fact that Hossy was at risk in view of its high cost nature and productivity issues. The excellent rate of production we have demonstrated illustrates the success of the collaborative effort.

 

The additional capital required to develop the Hossy shaft to the level where we would see costs come down significantly is currently unaffordable and must rank behind other projects in attractiveness. As our highest cost and therefore most vulnerable shaft, Hossy has been the focus of our efforts to reduce costs and we are carrying out a full technical review of the shaft's long term prospects while instituting targeted interventions to reduce real unit costs as follows: discarding the XLP mining method and continuing with hybrid mining whilst increasing the volume of production; reviewing the contractor model at the shaft; driving efficiency improvement projects and reviewing shaft overheads and right sizing the operation to 100,000 tonnes per month from a name plate capacity of 120,000 tonnes per month.

 

K4 shaft offers the best brownfield replacement and growth optionality for Lonmin. We placed it on care and maintenance in 2012 as market conditions deteriorated but in line with Saffy and Hossy, K4 will be the next shaft to benefit from our new approach. We are now placing a dedicated team into K4 to look at how we can begin to prepare K4 for an effective ramp up in due course without requiring excessive capital. We will use the excess productive labour from other shafts. It is likely that we will see some preparation activity at K4 during the 2015 financial year.

 

We will continue to mine our opencast pit as long as this makes economic sense and it is likely to deplete by December 2015 at current extraction rates.

 

We decided to defer the restart of the Number One UG2 concentrator in order to match concentrator capacity to mining output.

 

1.3.2 Value Benefits

The value benefits we anticipate, denominated in Rand, as most of our expenses are incurred in Rand, are targeted over the next three years and amount to more than R2 billion.

 

Operating Model Cost Savings

We anticipate cost savings of around R600 million to come from a review of our contractor model; redeployment of employees and contractors; freezing some recruitment; and natural attrition. Additionally we expect continuous procurement cost savings through the Total Cost of Ownership project.

 

Productivity and Efficiencies

We expect value benefits arising from productivity and efficiencies improvements. This includes half level optimisation of key shafts and our focus on stoping crew efficiencies.

 

Process Operations

We have a number of initiatives within our processing operations which are anticipated to yield benefits. This includes reducing our metals in process pipeline and continued processing recovery improvements through the bulk tailing treatment project. This project which was delayed as a result of the impact of the strike on capital spend, is progressing and is anticipated to deliver near term returns.

 

In addition we intend to leverage customer relationships to optimise revenues generated from our basket and pursue collaboration in market development.

 

2. Enhance Balance Sheet Strength

We plan to preserve a conservative balance sheet with access to sufficient funds to finance both ongoing operations and prudent and efficient capital expenditure.

 

Our excellent project pipeline should not be funded by bank debt which should be used sparingly, principally to fund working capital fluctuations. Our ability to re-invest in our asset base is therefore contingent on our own profitability. Importantly part of our savings from cost and capital efficiency has to go into social investment as this has proven a business imperative. Going forward we recognise that there will be a need to balance our shareholders' need to receive a dividend and the need for capital and social spend.

 

3. Our People and Relationships

The unprecedented five month strike has refocused our energy on rebuilding relations with employees and their representative trade unions. In the wake of the strike we have continued to reach out to our employees and all unions, through meetings and structured workshops aimed at ensuring that any issues can be dealt with swiftly and without recourse to industrial action. The relationships with our employees and their representative trade unions are critical to our success. They form the central part of how we conduct our business and an acknowledgement of their respective roles in ensuring a sustainable operating environment.

 

We are increasing our efforts to communicate directly with employees and to reclaim our role as the primary source of communication. This direct engagement with employees through the existing line management structures and the periodic communication forums, forms part of the way we work and the basis of creating empowered, high performance teams. Through the leadership development and team effectiveness training programmes, we continue to develop our managers' capacity to manage this new form of direct engagement.

 

In addition we have initiated a relationship building programme. This programme has culminated in the Relationship Charter, which outlines our aspirations of the nature of relationship that will be built with the unions and measures that are being implemented to give effect to the Charter. The Charter presents a real opportunity to strengthen relations with trade unions inter alia through constructive and regular engagements.

 

Management has begun to drive through the strategic actions from the asset review and we are seeing encouraging results. The solid ground-work that we have done over recent months underpins the excellent traction we have gained and will enable us to realise future opportunities.

 

We have made major changes to our top team in order to create a cohesive business with empowered operating teams. We have experienced and skilled middle management teams and they now have been given a greater say and control over their various areas which is already bearing fruit. The reshaped management team is now more focused on value and delivery.

The new structure will enable us to utilise the skilled resources we have across the mining and processing operations and develop a common culture. This provides for our employees' growth and development with great benefits to Lonmin. Our new approach is also improving our ability to attract, develop and retain the best talent.

 

More information around the relationship charter we have developed to guide this process can be found under the Operational Review of this report.

 

4. Our Corporate Citizenship Agenda

 

4.1 Stakeholder Engagement

The importance of genuine and robust stakeholder engagement and relationship building has become increasingly apparent over the past decade, given the need to understand stakeholder expectations and communicate on key issues transparently, consistently and in a timely manner. We have identified and prioritised our stakeholder groups and individuals and allocated relationship "owners" to each grouping. Our aim is to rebuild and protect Lonmin's relationships with all and critical stakeholders who have a significant ability to impact Lonmin's operations and investment case. The renewed focus and energy on stakeholder engagement acknowledges the role of partnerships in confronting the challenges plaguing the industry. Functional partnerships between Government, organised labour and community leaders are essential if we are to create the necessary environment for a sustainable future.

 

4.2 Corporate Communications and Reputation Management

The role of communications has been critically examined, specifically with respect to rebuilding trust externally as well as internally between management and employees, and creating an environment of peace and tolerance. This renewed focus on communication, transparency and genuine engagement led to several structural changes in a bid to align the Company and our stakeholders to a shared vision of a sustainable and profitable Lonmin through all cycles and minimise business interruptions.

 

4.3 Social licence to Operate

Maintaining our social license to operate through securing the trust and acceptance of communities and stakeholders is material as they host our operations. This is achieved through:

 

- stakeholder engagement to ensure social expectations are understood and managed

- community upliftment initiatives to address social issues

- transformation initiatives to meet the government's social and economic development goals

- ethical business practices that include a commitment to upholding human rights

- corporate and community partnerships

 

Lonmin is supportive of and commits to participate in the South African government's National Development Plan.

 

4.4 BEE ownership

The new year is also vital for our BEE responsibilities. We concluded a historic deal with the Bapo community in 2014, and we must maintain this momentum as we approach various deadlines.

 

Lonmin was one of the first mining companies to conclude a BEE transaction, transferring 18% of the operations to HDSAs in 2004. Lonmin was subsequently unable to finalise the last 8% and, even though this has been challenging in this deadline year, I am confident that the transactions will be completed within the required time frame.

 

4.5 Living Conditions and Completion of Hostel Conversion

 

Housing for employees is one of the areas which goes to the heart of our licence to operate, both in terms of the Mining Charter, and in terms of our relationship with our employees.

Whilst it requires significant investment to achieve, a successful housing policy and plan brings long-term benefits in terms of increased productivity and reduced absenteeism.

 

In our Social and Labour Plan, we originally committed to convert 128 traditional single-sex blocks into a mixture of family and bachelor units. We will complete the conversion by the end of December 2014. Upon completion, the 128 converted hostel blocks will yield 796 family units and 1,868 single units.

 

Acknowledgements

We have now put the top team in place for the challenges and plans ahead. I expect a step change, given the focus on operational delivery created by the reconfigured structure and team. I would like to take this opportunity to welcome Johan Viljoen, who brings industry-leading expertise and experience to his position as Chief Operating Officer. We also welcome back Ben Moolman, a Lonmin and Platinum stalwart, who will run the Business Support Office (BSO) we established this year. The BSO is the conscience of the business ensuring we get value from every Dollar and every ounce and also deliver on our social commitments.

 

We saw three senior colleagues leave us this year, Albert Jamieson, Natascha Viljoen and Mark Munroe and furthermore, Barnard Mokwena will be leaving us at the end of December. They have all given great service to this Company. They leave with our high praises. I know you will join me in wishing them all the best for their future, and in welcoming our new colleagues, who form part of an Exco which is driving Lonmin to the next level.

 

Conclusion

The long term fundamentals of the PGM market remain solid and Lonmin is well positioned for improvement when it comes. We have put a bold cost reduction and productivity improvement programme in place to ensure the business is sustainable through all cycles and profitable in the near term.

 

We will mine for value, not just for volume. We will continue to rebuild our relationships with our employees and develop our relationship with all the unions that represent our employees, building on the Relationship Charter we agreed in early August this year. We will also use the advantages our new senior management structure gives us to empower our skilled and experienced middle management tier. Where we have done this already, at Saffy and Hossy, we see encouraging traction on the ground which contribute to creating a sustainable Lonmin.

 

Guidance

 

2015 Financial year

For 2015 we expect platinum metal in concentrate (MIC) production in the region of 750,000 ounces and, after re-stocking the pipeline, sales are guided to be around 730,000 Platinum ounces. We expect to maintain sales of around 750,000 platinum ounces thereafter with the flexibility to increase or reduce sales dependent on market outlook. As a result of the continued suppressed market conditions and capital discipline, capital spend on growth ounces has been deferred and capital expenditure for 2015 reduced from previous guidance of around $400 million to around $250 million. This will be predominantly focused on Rowland, the K3 incline and Saffy as well as on the bulk tailings project. We will also spend limited capital on K4 shaft as we begin to prepare this shaft for its eventual restart in 2017, subject to favourable market conditions.

 

Taking into account cost savings, productivity initiatives, increased production profile for 2015 and the increase in wages, we anticipate the unit cost of production to be around R10,800 per ounce.

 

Medium term outlook

For the medium term, we expect to maintain sales of around 750,000 platinum ounces. This will be supported by capital expenditure of between $250 million and $350 million per annum. We will continue to manage a balance between capital investment and maintaining a sound balance sheet. Consequently, capital spend in any year will be subject to prevailing market conditions. Despite the significant inflationary pressures we face, we would expect to contain increases in unit costs to below wage inflation.

 

Thank you

Every employee matters greatly to me - Lonmin is not shafts and machines, it is people. That is why safety is our first priority and everything I have mentioned above must be seen in this context.

 

I am grateful to our banking syndicate, our core advisors and customers for their continued support but my greatest thanks as always goes to our employees. I am also appreciative of Brian and his Board for their support and guidance in such a challenging year. I appreciate the continued commitment of our shareholders and I remain conscious of the need to pay dividends to shareholders at the earliest appropriate time.

 

 

Yours faithfully

 

Ben Magara

Chief Executive Officer

9 November 2014

OPERATIONAL REVIEW

 

Safety

Whilst the Company can be proud of its safety record, Zero Harm remains the goal. Safety is a journey which does not end. We are never complacent and we are greatly saddened by the death of our colleague, Mr Siyabonga Sibango who lost his life in a tragic accident at East 3 shaft on 26 October 2013. He is survived by his wife Ms Nolusindiso Sibango and their two children Qhama and Lungako. 

 

At Lonmin, we believe that Zero Harm is achievable, every day for everybody and everywhere. We are proud to have achieved one year fatality free on 27 October 2014, acknowledging the five month strike. The same day, mining operations achieved six million fatality free shifts.

 

In 2014 our safety record showed another year on year improvement continuing the impressive trend of recent years. The LTIFR decreased by 4.6% to 3.34 notwithstanding the impact of the strike. This is particularly pleasing given the heightened safety risk when operations resume after a standstill.

 

The manner in which we were able to efficiently, rapidly and safely return to work is testimony of our ability to operate according to a set of systems and procedures that enable Zero Harm. The prolonged strike had a potential negative impact on safety at Lonmin. Firstly, prolonged work stoppages such as the five months protected strike, negatively impact on the integrity of mining geology, infrastructure and equipment. For this reason, Lonmin continued running maintenance and performance checks on all active shafts and plants throughout the duration of the strike. Secondly, safe behaviour is habitual and easily unlearned over long periods away from work. As such, employees required extensive re-training before they were cleared to safely return underground or to the plants after the strike.

 

Achievements

 

· Our Karee 4B/1B shaft has been recognised this year with the JT Ryan award for Safest Mine in South Africa for the third year in a row at the annual MineSafe Conference held in August 2014. This shaft is the industry leader in safety with more than eight million fatality free shifts. This conference is collaborative and is supported by mining companies, industry bodies, employee representative organisations and government.

· Smelting and Refining recorded a major safety achievement of a lost time injury (LTI) free year on 4 September 2014.

· Lonmin Group achieved one year without a fatality on 27 October 2014 which is an industry record for hard rock mining in South Africa.

· Finally, we appreciate that an individual's safety and health are affected as much by issues outside the workplace as within it and we continue to work with all stakeholders to extend our safety awareness and healthcare programmes to all communities in the Greater Lonmin Community.

 

Mining Division

 

Overview

The 2014 financial year was one of the most challenging periods experienced by the Marikana operations in recent history.

 

The year began with a disappointing first quarter where performance was negatively affected by an unusually high number of safety stoppages as well as go slow activity associated with the wage negotiations that were taking place at the time. The five month AMCU led strike, which started on 23 January and was eventually resolved on 24 June, was the dominant event for the year and accounted for almost all of the underperformance for the year.

 

Following the strike, production was safely and successfully ramped up and the operations were able to reach normal production during August. This is testament to the good operational fundamentals of the business, an improving safety outlook, a well-executed care and maintenance strategy during the strike period as well as thorough planning and well controlled execution of the ramp up process.

 

Given the challenging and disruptive environment outlined above, tonnes mined at 6.4 million tonnes were 47.3% less than in 2013.

 

It is estimated that the impact of the strike on tonnes mined, including disruptions during the wage negotiations leading up to the strike, was 6.4 million tonnes. Tonnes lost due to Section 54 stoppages are estimated to be 0.3 million tonnes with a further 0.1 million tonnes lost due to management induced safety stoppages.

 

Marikana Ore Reserves

The ore reserve position remained largely unchanged when compared to 2013 at 3.7 million square meters, an average of 21 months of production. This level provides the flexibility required to ensure a consistent production output from the operations.

 

Productivity

Productivity measured as square meters per total mining employee was 2.57. This is a deterioration of 50.5% when compared to 2013 as would be expected given the strike impacted total production. However, productivity in August and September 2014 exceeded the same period in the prior year.

 

Business Improvement Initiatives

 

Half Level Optimisation

Half levels across our operations are currently at varying levels of optimisation. The greater the proportion of optimised half levels on an operation, the smaller the operating footprint and the better the efficiencies. This initiative seeks to increase the proportion of optimised half levels mined at each operation by:

· Developing a simulation tool to assist operations management to analyse half level performance and to perform a diagnostic to determine the reasons as to why a particular half level is not optimised

· Operations management will develop action plans to address the issues that are causing sub optimal performance

· These actions will be tracked and updated on a monthly basis

· Half level optimisation status has been introduced as a key performance management area for senior operations management and a system has been developed to monitor progress quarterly

 

Improved output per stoping crew

Our objective is to improve stope crew output steadily over the medium term. The primary focus is to increase the number of times that a stoping crew achieves a production blast during the month. This is to be achieved by:

· Ensuring that there is sufficient mineable face length to provide the requisite flexibility for crews to move without delay when they encounter problems.

· Line of sight system: Improved short interval control focused on the interrogation of reasons for lost blasts and the implementation of corrective measures to prevent similar losses in the future

· Interventions aimed at improving the performance of the bottom 20% of performers significantly. These include deployment of best practice teams to assist with diagnostics and corrective action plans, weekly monitoring by senior operations management and on-the-job training for supervisors.

 

Integrating Theory of Constraints philosophy into operating practices

After the successful integration of the philosophy into the Rowland shaft operating practices, a decision has been made to roll the integration process out to all of the operating units at Marikana. Our Best Practice teams have been trained in the operating practices and they will be used to conduct the roll out to all operations. The roll out is already underway at Saffy shaft.

 

Overview of Marikana mines

 

Karee

Karee operations, comprised of K3, 4B/1B and K4, experienced the brunt of the disruptions related to the slow down during wage negotiations during the first quarter of the financial year. This together with the full impact of the strike period was the cause of the significant under performance. Tonnes mined of 2.4 million were down 52.0% on the prior year. The hoisted 6E mill grade of 4.13 g/t was 4.2% lower in 2014 than in 2013 as a result of the increased proportional mix of Merensky to UG2 ore as well as some build-up of stocks in the concentrator at the year end. K3 and 4B/1B have successfully ramped up after the strike and are currently operating close to full capacity. K4 remained on care and maintenance during the year under review.

 

Westerns

Westerns operations comprising Rowland, Newman, Hossy, West 1 and East 1 mined 2.2 million tonnes during the year, a decrease of 48.2% when compared to 2013. The under performance is purely as a result of the strike. Production at Rowland shaft improved significantly during the first quarter of the year and the excellent performance has been resumed following the strike with the shaft delivering a fast ramp up to be operating at planned capacity during September. Newman shaft has recovered well after the strike and is currently operating at planned output levels.

 

Production output at Hossy shaft improved steadily during the first quarter of the year. This improvement has continued following the resumption after the strike, with the shaft ramping up to planned production levels very quickly and delivering the best ever production output of just under 112,000 tonnes during September. The outcome of the Asset Review regarding this shaft can be found in the CEO review.

 

West 1 and East 1 have effectively reached the end of their lives and contract mining is being employed to extract the last remaining pillars and ore accumulations. Grade has remained constant throughout the period under review.

 

Easterns

The Easterns operations comprising Saffy shaft, East 2 and East 3 (Lonmin) mined 1.1 million tonnes during 2014. This equates to a 34.8% decrease when compared to FY13. The deterioration in performance is related mainly to the effects of the five month strike but was also impacted by a very challenging first quarter that was marred by incessant safety stoppages at Saffy shaft and East 3 shaft. Easterns operations have ramped up well following the strike, with East 2 and East 3 returning to planned output levels during September.

 

Notwithstanding the disruption caused by the strike, the production build up at Saffy shaft has been exceptional and ahead of plan. Good momentum has been achieved during the ramp up with the shaft achieving its best ever monthly output of just under 163,000 tonnes in September. Saffy has now reached 80% of its nameplate capacity compared to 48% in 2013. The ore reserve has been developed to a healthy position of 0.6 million square meters which is in excess of 18 months at a full production stoping rate. Investments have been made to upgrade and de-bottleneck infrastructure and further work in this regard has been planned with the roll out of the Theory of Constraints management philosophy to the shaft. With the required face length available, it is expected that the stoping crews will show steady progress in building up their performance output so that the shaft achieves planned production in 2015.

 

The 2014 hoisted 6E mill grade for Saffy of 4.62g/t is 2.4% higher than the previous year. This is mainly due to the proportion of stoping ore increasing relative to reef development ore.

 

Opencast

The opencast operations operated throughout the strike, albeit at a reduced level of output. Immediately after the conclusion to the strike, production was restored to pre-strike levels. Tonnes mined of 0.3 million were down 36.8% on the prior year. The delivered 6E mill grade of 3.11g/t is 6.2% improved on the previous year due to less dilution through improved operational controls. There are only limited ore reserves remaining at this operation and it is anticipated that they will be completely mined out by December 2015.

 

Pandora Joint Venture

Tonnes mined at the joint venture for 2014 were 47.7% less than during 2013 and this reflects the difficult first quarter where production was interrupted on a number of occasions by safety stoppages that were related to the fatal accident that occurred during October. The five month strike also took its toll on the operation but recovery post the strike has been good and normal planned production levels were restored during August.

 

Capital Spend

Of the limited capital expenditure incurred by the Group of $93 million, $64 million was incurred in the mining operations as a result of the cash conservation measures adopted during the strike period. The majority of the limited capital was spent on sustaining capital across the various shafts and central engineering. The majority of the project capital funds were allocated to the K3 UG2 decline project, Saffy shaft and Rowland shaft to continue with ore reserve development projects that are currently in execution.

 

Process Operations

During the financial year our total tonnes milled decreased by 48.2% to 6.1 million tonnes. This reflects the production loss due to the protracted strike. The total milled head grade declined to 4.39 grammes per tonne or 3.4% lower than the prior year period. The decline in head grade is directly attributable to the ore mix milled which was dictated by the strike, with the amount of lower-grade opencast Merensky ore increasing from 3.3% to 6.9% when compared to the prior year period.

 

The planned start-up of the Number One UG2 concentrator was delayed to reduce costs and this plant will now be commissioned in Q2 of 2015.

 

For the financial year, we achieved 380,359 saleable ounces of Platinum in concentrate; down 49.3% from the previous year, as a result of the extended strike. Refined production was higher than concentrate produced as a result of stock releases across the processing value chain. We are looking to reduce our working capital requirements by running at lower stock levels and we will not necessarily need to refill the pipeline in 2015 to the same extent.

 

Platinum sales of 441,684 ounces were achieved during 2014.

 

The new design on Number One furnace, the design changes implemented on Number Two furnace and a combination of operational excellence and an experienced workforce assisted in keeping both furnaces idling during the strike period. This in turn led to a smooth ramp up at the end of the strike.

 

PGM ounces produced of 882,094 were down 34.0% compared to the prior year period.

 

The instantaneous recovery rate achieved in 2014 of 86.2% is outstanding and represents a 1.2 percentage point increase on the prior year despite operations being heavily impacted by the strike. The continuous year on year improvements are a result of extensive optimization and improvement plans across our processing operations that continue to yield positive results.

 

Capital Spend

In 2014, the Process operations spent $21 million on capital compared to $52 million in 2013. The 2014 expenditure included the completion of the feasibility studies for the bulk tailings project and start-up of the PMR other precious metals circuit upgrade which is due to be completed by December 2015 and sustaining capital.

 

Other Assets

 

Limpopo

The deadline for Shanduka to exercise its option over Limpopo remains 31 March 2015. In the interim, a number of conditions precedent to the completion of the transaction need to be satisfied. The conditions include completion of a bankable feasibility review, the securing of funding and obtaining all necessary approvals. Shanduka is reworking certain areas of the bankable feasibility study prior to completion thereof. In the interim, a detailed programme and budget has been completed for submission to the Shanduka Board that would form the basis of potential renegotiation around the transaction completion date of 31 March 2015. Feedback is expected from Shanduka once their Board has considered the programme and budget.

 

Akanani

Akanani offers the prospect of a large, long life, low cost and highly mechanised mine and a decision has been taken to compile and submit a Mining Right Application. A Concept Study has commenced and is expected to be completed in the next six months. Akanani provides us with options in the long-term.

 

Exploration

 

Americas

Lonmin is exploring for PGM depositsaround the Sudbury Basin in Ontario, Canada in joint ventures with WallbridgeMining Company Limited and Vale S.A. Drilling is being undertaken on the Vale JV for further geotechnical studies and to better define the potential PGM resource.

 

Europe

Lonmin signed a memorandum of understanding to work with a joint venture partner on two of our Northern Ireland licences for gold and silver. Subsequent to the year-end we have entered into a joint venture agreement.

 

Greenfields exploration, geophysical surveys and drilling continued to generate targets for follow up in the coming year both in Canada and Northern Ireland.

 

South Africa

An application for renewal of Vlakfontein's prospecting right has been submitted to the DMR and we await their response. Lonmin has a joint venture with Boynton in the eastern Bushveld but has held arbitration proceedings against Boynton on the basis that it failed to comply with its promise to deliver an unencumbered asset to the joint venture. We are currently awaiting the arbitrator's decision. In the interim, Boynton awaits a response from the DMR on whether its application for renewal of prospecting right has been successful.

 

People

 

Engaging with Employees and Unions

We launched the relationship building programme with AMCU immediately after the end of the strike in an endeavour to rebuild our relations. The relationship building programme entailed a series of 2-day break-away sessions across all levels within Lonmin and AMCU structures aimed at having honest and frank conversations about the state of our relationship and agreeing measures to bolster the relationship. These break-away sessions have culminated in a relationship charter, which outlines our desired relationship and the specific measures that will be implemented to ensure that this is achieved. Similar session will also be held with minority unions.

 

Our managers have also increased their efforts to communicate directly with employees. This direct engagement and communication with employees forms part of our drive to reclaim our role as managers and an employer.

Wage agreement: key facts

· A 3-year agreement which enables stabilisation of our operations

· The agreement is effective from 1 October 2013 until 30 June 2016

· Within a week of the settlement agreement, all employees received back pay from the increase date of 1 October 2013 to 22 January 2014, the day before the start of the industrial action

· An annual basic salary increase of R1,000 per month for A-band employees

· All other employees, particularly those in the bargaining unit, will receive an 8% increase for the first year and 7.5% for the next two years

· Benefits (including medical aid and pension fund contribution) and allowances (including living out allowance, annual leave allowance and attendance allowance) will increase by amounts linked to the inflation rate

· Associated increased labour costs to the Company were 12.9% for 2014, 8.8% for 2015 and 8.2% for 2016

 

Workforce Profile

Our total workforce at end September was 38,292 compared to 38,421 in September 2013 of which 28,276 were permanent employees and 10,016 were contractors. 83% of the overall workforce is South African, with 17% still being migrant. 8.2% are women.

 

Employment Equity

Transformation is a key element of how we work and empowerment is important to Lonmin. Transformation imperatives are entrenched in policies within our recruitment, succession planning and talent management functions that enable opportunities for Historically-Disadvantaged South Africans (HDSAs).

 

Community Relations and Our Corporate Citizenship Agenda

 

Community Value Proposition (CVP)

Contributing to a long-term social, economic and infrastructural development is a direct investment in the sustainability of the mines as well as that of communities affected by mine activities. The CVP project that we commenced in 2013 is aimed at better understanding the impact and community development needs to deliver focused social investment that is impactful and sustainable. The Company's objective is to make a social investment that has lasting impact beyond the life of the mines.

 

Our corporate citizenship agenda

We engage in a range of activities aimed at uplifting our communities. These include education, health and social infrastructure projects.

 

Social and Labour Plan (SLP)

Social and Labour Plans (SLPs) required by Mineral and Petroleum Resources Development Act (MPRDA) are submitted to Department of Mineral Resources for approval on a five-year basis. These plans include a number of initiatives that Lonmin delivers as part of its legal and social licence to operate. To this end the new SLPs for the coming years will be focused on accelerating transformation and implementing measures to significantly improve the living conditions of our employees, host communities and major labour sending communities

 

BEE EquityOwnership

The Company is required to increase HDSA ownership in its prospecting and mining ventures by 31 December 2014 from its current holding of 18% to at least 26% as required under the Mining Charter.

 

As flagged to shareholders in the regulatory release of July 2014, Lonmin announced that it had entered into binding agreements with the Bapo ba Mogale Traditional Community (the Bapo) in relation to a series of transactions which will enable Lonmin to meet its Black Economic Empowerment (BEE) targets. Lonmin also stated its intention to implement an Employee Share Ownership Plan (ESOP) and a Community Share Ownership Trust (CSOT) (for the benefit of the local communities on the western portion of our Marikana operations). All three transactions will collectively provide the additional 8% equity empowerment which Lonmin requires to achieve the 26% effective BEE equity ownership target by 31 December 2014.

 

· Bapo Transaction

The Bapo Transaction involved a royalty for equity swap and the sale of the Bapo 7.5% stake in the Pandora Joint Venture to a Lonmin subsidiary. This transaction provided the Bapo Community with equity participation of circa 2.25% at Plc level, a deferred royalty payment of R20 million per annum payable by Lonplats (Eastern and Western Platinum combined) in each of the five years following completion of the transaction, and a minimum procurement spend of R200 million over the 18 months following the completion of the transaction. Whilst binding legal agreements were signed in July 2014, two conditions precedent remain to be satisfied and are expected to be satisfied during November 2014 at which stage the transaction will be complete and implemented. Certain members of the Bapo Community have indicated that they may institute legal action challenging, amongst other things, the authority of the Bapo to enter into this transaction. These threats to institute legal action have not been acted upon at this stage.

 

· Employee Share Ownership Plan

Whilst engagements between Lonmin and unions continue as regards the nature of the ESOP to be implemented at Lonmin the ESOP proposed by Lonmin (which is based on a profit-sharing scheme) will be implemented before the end of 2014. The ESOP will result in economic participation and ownership by our employees and sharing the responsibilities and involvement that, that ownership brings. This implementation will ensure that Lonmin receives HDSA equity accreditation of 3.8%.

 

· Community Trusts

Two separate community trusts are being established - one for the Bapo Community and other for the communities on the western side of our operations. Each community trust will hold Lonplats shares and will be entitled to dividend payments to be used for the upliftment of the respective communities. To the extent that the dividend payable in a particular year is less than R5 million, each community trust will be entitled to a minimum annual payment of R5 million escalating in line with CPI each year. The two community trusts will entitle Lonmin to an HDSA equity accreditation of 1.8%.

 

At this stage, the Company expects that completion of all of these arrangements should be achieved by December 2014.

 

Judicial Commission of Inquiry

The process of giving evidence at the Commission has concluded and all parties are scheduled to complete the presentation of final arguments by 15 November 2014. Judge Farlam is required to compile a report by 30 March 2015 setting out his findings and recommendation. This report is required to be handed to the President who will have discretion as to when and the extent to which the contents of the report are made available to the public.

 

Once Judge Farlam delivers his report we will engage publically on some of these issues and provide a balanced perspective of events and circumstances that is currently missing, particularly from media reports

 

MARKET REVIEW

 

Overview

During the year under review the platinum price has fallen short of market expectations. Significant destocking by mining companies during the longest strike in platinum's history, not to mention the growth of platinum ETF products in South Africa, should have led to higher prices than prevail today.

 

However, speculative investment positions have been long for some time constraining upward price movement leaving platinum largely range bound throughout most of 2014. During the last two weeks of September a strengthening dollar combined with uneven global economic trends resulted in significant liquidation and price depreciation.

 

Nonetheless, as investors have shifted from relatively overweight to underweight in platinum, the health of market fundamentals is expected to exert greater influence on future price recovery.

 

Sales

In 2014 Lonmin sold 441,684 ounces of Platinum into the market. Platinum sales contributed 64% of our turnover. Palladium was the second highest contributor to the revenue basket with the 212,500 ounces sold constituting 17% of Lonmin's income. Combined sales of rhodium, ruthenium and iridium contributed a further 11% and Gold and Base Metals made up the balance.

 

PGM Prices

Despite the five month strike experienced by the three largest PGM producers both platinum and rhodium prices are lower in Dollar terms compared to the same period under review in 2013.

 

The average price of platinum was $1,426 per ounce in the year to September compared to $1,537 per ounce (7% lower) for 2013, while rhodium lost just $7 on average. Palladium grew by 11%.

 

Market Outlook 2015

The platinum-group metals continue to offer solid, captive demand through increasing global vehicle sales and tighter emissions standards, not to mention robust demand in industrial applications and strong emerging growth in platinum jewellery in India. Therefore, as the market continues to destock, platinum prices are expected to begin to appreciate and the platinum market to recover. The market and prices remain vulnerable to asynchronous global economic growth and further Rand weakness.

 

Supply in 2014

Mine supply from South Africa contracted by 1.3 million ounces year on year mostly due to the prolonged strike. However, sales for the year are expected to reduce the loss to around 0.8 million ounces as producers destocked the pipeline during this time. Outside of South Africa supply remained mostly flat with a decline in Zimbabwe due to the temporary closure of Bimha mine as a result of ground conditions. Recycling in automotive grew by 3.2% but was offset by the decline in jewellery recycling. Net recycling is estimated to come in at around 1.0% growth year on year. The reduction in metal prices in calendar Q4 is expected to act as a reduced incentive to recycle platinum.

 

Demand in 2014

Automotive catalyst demand continues to dominate the end uses of the three primary PGM's. The recovery of this sector remains ahead of global GDP growth in most geographies and coupled with ever tightening tailpipe emissions legislation has underpinned the fundamentals of the metals. In addition, platinum jewellery and other industrial sector demands have remained relatively supportive.

 

 

Strengthening Collaboration on Market Development

During 2014 the industry continued with its collaborative effort to promote the use of platinum in jewellery. The significant growth in India can be ascribed to the perseverance of select South African mining industry participants including Lonmin and the vision of committed jewellery partners in the region. Further, more intensified efforts should see the Indian jewellery market grow from strength to strength in the near term. In addition, the industry has also comprehensively joined forces and are working together to establish and launch a new industry body that will focus on educating and promoting the market on the value of holding platinum as an investment

 

 

 

 

MINERAL RESOURCES AND MINERAL RESERVES

 

 

2014 Mineral Resources

The main features of the Lonmin Mineral Resources as at 30 September 2014 are:

· Attributable Mineral Resources were 179.1 million ounces of 3PGE+Au in 2014, unchanged with 2013.

· Revisions to the South African Mineral Resource estimates were confined to the Marikana and Pandora properties. The Mineral Resources at Marikana (excluding tailings) were unchanged in 2014. This is attributed to the net effect of an increase in the Merensky Mineral Resources being offset by a decrease of the UG2 Mineral Resources. The Merensky Measured and Indicated Mineral Resources increased by 0.8 million ounces whereas Inferred Mineral Resources increased by 0.2 million ounces due to re-evaluation after depletion. The decrease in UG2 Mineral Resources of 1.0 million ounces is the result of mining depletion (0.6 million ounces) and loss on evaluation (0.4 million ounces).

· The Pandora Mineral Resource decreased by 20,000 ounces of 3PGE+Au, the net result of mining depletion partially offset by reduced geological losses.

· The Marikana Tailings, Akanani, Limpopo and Loskop Mineral Resources were unchanged during 2014.

· The Mineral Resources for the Denison 109 Deposit in Canada have been reported unchanged.

· Revisions to the non-South African Mineral Resources have been reported for the Bumbo base metal and gold deposit in Kenya. Changes to the Mineral Resource classification was made by converting 28.2 kilo tonnes of Cu-equivalent metal from Inferred to the Indicated confidence category.

 

 

2014 Mineral Reserves

The main features of the Lonmin Mineral Reserves as at 30 September 2014 are:

· Revisions to the South African Mineral Reserves were confined to Marikana. There were no changes to the Limpopo Reserves.

· The attributable total Mineral Reserves for Marikana were 35.5 million ounces of 3PGE+Au in 2014, compared with 36.0 million ounces in 2013.

· The Proved Mineral Reserves increased by 0.1 million ounces 3PGE+Au in 2014. This is the nett effect of depletion (0.5 million ounces) offset by the conversion of Probable to Proved Mineral Reserves (0.6 million ounces).

· No changes occurred with respect to the operating shaft boundaries at Marikana during the period.

· There were no fundamental changes in the Lonmin life of business plan from the 2013 reporting period. Considering the disruptions experienced during 2014, the original 2013/2014 LTP plan was applied for the purposes of quantifying the Mineral Reserves for 2014.

 

 

PGE Mineral Resources (Total Measured, Indicated & Inferred)1,4

 

Marikana

751.9

4.87

117.8

71.0

755.4

4.85

117.8

71.0

Limpopo2

128.8

4.07

16.8

8.4

128.8

4.07

16.8

8.4

Limpopo Baobab shaft

46.1

3.91

5.8

3.0

46.1

3.91

5.8

3.0

Akanani

216.0

3.84

26.7

10.9

216.0

3.84

26.7

10.9

Pandora JV

65.8

4.65

9.8

6.0

65.9

4.65

9.8

6.0

Loskop JV3

10.1

4.04

1.3

0.8

10.1

4.04

1.3

0.8

Sudbury PGM JV3

0.4

6.30

0.07

0.04

0.4

6.30

0.07

0.04

Tailings Dam3

22.5

1.10

0.8

0.5

22.5

1.10

0.8

0.5

Notes

1) All figures are reported on a Lonmin Plc attributable basis, the relative proportions ofownershipare per operation or project. Resources are reported Inclusive of Reserves.

2) Limpopo2 excludes Baobab shaft.

3) Loskop and Sudbury PGM JV exclude Rh, due to insufficient assays, and therefore 2PGE+Au are reported. Tailings Dam exclude Au, due to assay values below laboratory detection limit, and therefore are reported as 3PGE.

4) Quantities and grades have been rounded to one or two decimal places, therefore minor computational errors may occur.

 

PGE Mineral Reserves (Total Proved & Probable)1,3

 

Marikana

277.5

3.98

35.5

21.7

281.2

3.98

36.0

21.9

Limpopo2

42.4

3.20

4.4

2.2

42.4

3.20

4.4

2.2

Limpopo Baobab shaft

9.4

3.16

1.0

0.5

9.4

3.16

1.0

0.5

Pandora JV

6.0

4.11

0.8

0.5

6.1

4.11

0.8

0.5

Tailings Dam 4

21.1

1.10

0.7

0.5

21.1

1.10

0.7

0.5

 

Notes

1) All figures are reported on a Lonmin Plc attributable basis, the relative proportions of ownership are per operation or project.

2) Limpopo excludes Baobab shaft.

3) Quantities have been rounded to one decimal place and grades have been rounded to two decimal places, therefore minor computational errors may occur.

4) Tailings Dam exclude Au, due to assay values below laboratory detection limit, and therefore are reported as 3PGE.

 

FINANCIAL REVIEW

 

Overview

While the impact of the longest strike in the history of the South African platinum sector is a dominant feature of our financial performance during the year ended 30 September 2014, the balance sheet strength displayed by our ability to absorb the financial impact of the business disruption and fund a successful ramp up demonstrates the flexibility and resilience we have built into our capital structure since the events of 2012.

 

The depressed PGM pricing environment experienced in the first half of the financial year continued in the second half despite significant supply side constraints due to the strike action. As a result revenue was severely impacted by reduced production as well as subdued metal prices.

 

On the cost side, we have separately accounted for idle production costs incurred during the strike for which there was no associated production output as well as additional costs arising directly as a result of the strike action. These have been disclosed as special costs to assist in understanding the financial performance achieved by the Group on a comparable basis with prior years. As a result, our underlying performance excludes the impact of the strike action. Other than the impact of the strike, movements in underlying costs were driven primarily by the release of stock locked up at end of the previous financial year and utility and labour escalations (including above inflation wage rate increases), somewhat mitigated by favourable exchange movements. The cost of production per PGM ounce for 2014, including the adverse impact of the strike action, was R13,538 compared to R9,182 for 2013. The wage agreement signed at the end of the strike continues the trend of above inflation wage increases which will impact unit costs going forward.

 

Despite a decrease in capital expenditure during the period, the declining profitability on the back of the strike action impacted the Group's ability to generate cash. However, we put in place measures to conserve cash and protect our balance sheet position during the strike while maintaining our ability to ramp up the business. As a result of these measures, coupled with our balance sheet strength, we were able to fund a successful ramp up to full production in the last quarter and end the year with net debt of just $29 million.

 

From a tax point of view, our philosophy is to comply with the tax legislation of all the countries in which we operate by paying all taxes due and payable in those countries in terms of the applicable tax laws. Transactions entered into by the Group are structured to follow bona fide business rationale and tax principles. We recognise that in order to be a sustainable and responsible business, the Group must have appropriate tax policies that are adhered to and managed properly. We seek to maintain a proactive and cooperative relationship with local tax authorities in all our business and tax transactions and conduct all such transactions in a transparent manner.

 

Income Statement

The $112 million movement between the underlying operating profit of $52 million for the year ended 30 September 2014 and that of $164 million for the year ended 30 September 2013 is analysed below.

 

$m

Year to 30 September 2013 reported operating profit

147

Year to 30 September 2013 special items

17

Year to 30 September 2013 underlying operating profit

 

164

PGM volume

PGM price

PGM mix

Base metals

 (442)

(56)

(22)

(35)

Revenue changes

(555)

Cost changes (including positive foreign exchange impact of $170m)

443

 

Year to 30 September 2014 underlying operating profit

 

52

Year to 30 September 2014 special items

(307)

Year to 30 September 2014 reported operating loss

(255)

 

Revenue

Total revenue for the year ended 30 September 2014 decreased by 37% (or $555 million) to $965 million compared to prior year revenue of $1,520 million.

 

The strike impact on production saw PGM sales volume for the year decreasing by 31% compared to the volume sold in the prior year which contributed $442 million to the total decline in revenue. The impact of the strike was partially diluted by the release of inventory locked up at the end of the 2013 financial year as a result of the smelter incident and the reduction of stock in the pipeline during the latter half of the year.

 

PGM prices weakened during the year under review as the metal pricing environment remained subdued despite the longest strike in the platinum industry's history. The impact on the Group's average prices achieved on the key metals sold is shown below:

Year ended 30 September

2014

2013

$/oz

$/oz

Platinum

1,403

1,517

Palladium

775

715

Rhodium

1,050

1,097

PGM basket (excluding by-product revenue)

1,013

1,100

 

The US Dollar PGM basket price (excluding base metals) was 8% down compared to the 2013 average prices. This resulted in a $56 million reduction in revenue. The Rand basket price (excluding by-products) increased by 4% as a result of the relatively weaker Rand.

 

The mix of metals sold resulted in a negative impact of $22 million mainly due to a lower proportion of platinum sold compared to other refined metals. Base metal revenue was down $35 million mainly as a result of lower volumes sold.

 

Operating costs

As explained in the financial overview, the impact of the disruptions caused by the strike action has been reported as special costs. Total underlying operating costs for the year decreased by $443 million mainly due to the impact of decreased production levels and positive foreign exchange movements resulting from the weaker Rand partially offset by adverse metal stock movements. A track of these changes is shown in the table below.

 

$m

Year ended 30 September 2013 - underlying cost

1 356

 

Increase / (decrease):

 

Marikana underground mining

Marikana opencast mining

Limpopo mining

Concentrating and processing

Overheads

(189)

(26)

(3)

(62)

(5)

Idle fixed production costs excluded from underlying costs

(287)

Operating costs

(572)

Ore, concentrate and other purchases

Metal stock movement

Foreign exchange

Depreciation and amortisation

(21)

336

(170)

(16)

Cost changes (including positive foreign exchange impact)

443

Year ended 30 September 2014 - underlying costs

913

 

Marikana underground mining costs decreased by $189 million or 22%, as wage and utility escalations were more than offset by the impact of reduced production and withholding of wages as a result of the strike action. Marikana opencast mining costs decreased by $26 million or 52% as operations have been scaled back as a result of the subdued price environment.

 

Concentrator and processing costs reduced by $62 million or 20% compared to the prior year, as the impact of reduced production as a result of the strike was partially offset by cost escalations and an increase in maintenance during plant idle time.

 

Ore, concentrate and other purchases also reduced by $21 million or 33% as volume produced was impacted by the strike action. The subdued price environment has also resulted in a decrease in ore purchase costs.

 

The year under review saw a release of stock in process locked up following last year's smelter incident as well as a general reduction in inventory as a result of lower production due to the strike and a drawdown of the processing pipeline during the second half of the year. This has resulted in a $336 million negative impact on operating profit, excluding exchange impacts, arising from metal stock movements. The $336 million comprises of a $133 million stock decrease in 2014 and a $203 million increase in stock in 2013.

 

The Rand weakened against the US Dollar during the year averaging ZAR10.55 to USD1 compared to an average of ZAR9.24 to USD1 in the 2013 financial year resulting in a $170 million positive impact on operating costs.

 

Depreciation is calculated on a unit of production basis, spreading costs in relation to proven and probable reserves. Due to reduced production levels, depreciation and amortisation decreased by $16 million compared to the 2014 financial year.

 

Cost of production per PGM Ounce

The loss in production as a result of the five month strike and lower production in the first quarter due to increased section 54 stoppages as well as production disruptions leading up to the strike impacted negatively on the cost of production per PGM ounce. The cost of production per PGM ounce for the 2014 financial year, which includes idle production costs reported as special costs, increased by 47% to R13,538 compared to R9,182 for the year ended 30 September 2013.

 

Further details of unit costs can be found in the Operating Statistics.

 

Special operating costs

Special operating costs for the year ended 30 September 2014 are made up as follows:

$m

Idle fixed production costs

Security costs

Contractors' claims

Other costs

287

10

3

7

307

 

As mentioned above, idle production overheads incurred during the strike period for which there was no associated production output as well as costs arising directly as a result of the strike action have been classified as special items. The total of these strike related costs amounted to $307 million. The major portion of the costs comprised idle fixed production costs incurred during the strike period which totalled $287 million. The cost of additional security amounted to $10 million. Costs relating to contractors not being able to fulfil their obligations as a result of the disruption amounted to $3 million. Other costs include legal, communication, medical and various other start-up costs.

 

For the year ended 30 September 2013, special costs totalled $17 million. This included an amount of $7 million consisting of communication costs for reputational rebuild as a result of the August 2012 events at Marikana, as well as costs incurred on the Farlam Commission. An additional amount of $10 million was incurred on the management restructuring exercise during the 2013 financial year.

 

Net Finance costs

Year ended 30 September

2014

$m

2013

$m

Net bank interest and fees

(25)

(20)

Capitalised interest payable and fees

13

11

Foreign exchange gains on net (debt)/cash

10

8

Dividends received from investment

10

-

Unwinding of discount on provision

(10)

(9)

Underlying net finance costs

(2)

(10)

HDSA receivable

(62)

18

Fair value movements in cash flow hedges

-

7

Exchange loss in respect of Rights Issue

-

(10)

Unwinding fees relating to the interest rate swap

-

(14)

Net finance costs

(64)

(9)

 

Total net finance costs increased by $55 million to $64 million for the year ended 30 September 2014 compared to $9 million incurred in the prior year.

 

Net bank interest and fees incurred in the 2014 financial year were $25 million which was 25% or $5 million higher than the $20 million incurred during the year ended 30 September 2013. This was largely as a result of an increase in average drawn facilities during the year as we sought to protect liquidity during the strike period. Interest totalling $13 million was capitalised to assets (2013 - $11 million). Dividends received relate to arrear dividends accruing from our investment in Petrozim Line (Private) Limited which were remitted during the year.

 

The Historically Disadvantaged South Africans (HDSA) receivable, being the Sterling loan to Shanduka Resources (Proprietary) Limited (Shanduka) decreased by $62 million during the year as a result of an impairment charge of $80 million partially offset by interest accrued of $18 million. The impairment charge arose as the value of the security for the loan (being the value of Shanduka's shareholding in Incwala calculated based on discounted cash flows of Incwala's underlying investments in WPL, EPL and Akanani) had fallen below the carrying amount of the receivable, largely driven by a decline in long term PGM price assumptions applied in the valuation models. The net movements in exchange rates during the year did not have a significant impact on the loan. The $62 million movement compares to a movement of $18 million in the prior year which consisted of foreign exchange gains of $1 million and accrued interest of $17 million. At 30 September 2014 the balance of the receivable was $337 million (2013 - $399 million).

 

Taxation

Reported tax for the current financial year was a credit of $123 million compared to $58 million in the 2013 period. The underlying tax charge of $5 million in the 2014 period becomes a $123 million tax credit after taking into account exchange gains on the retranslation of Rand denominated deferred tax liabilities ($42 million) and the tax impact of special items ($86 million). These gains are treated as special. In the prior year comparative period exchange gains had an effect of $80 million on the tax charge.

 

Our philosophy on taxation is to comply with the tax legislation of all the countries in which we operate by paying all taxes due and payable in those countries in terms of the applicable tax laws. Transactions entered into by the Group are structured to follow bona fide business rationale and tax principles. We recognise that in order to be a sustainable and responsible business, the Group must have appropriate tax policies that are adhered to and managed properly. We seek to maintain a proactive and cooperative relationship with local tax authorities in all our business and tax transactions and conduct all such transactions in a transparent manner.

 

With the Group's primary operations being in South Africa, the tax liability follows such activity which has the effect that the majority of the Group's taxes are paid in that country. Following the financial crisis of 2008 and other more recent events including the events at Marikana of 2012, lethargic global growth which has impacted PGM markets and more recently the five month industry-wide strike which have impacted profitability, the level of corporate tax has reduced. However, the Group continues to pay significant amounts in respect of other forms of tax including:

 

· Employee taxes

· Customs and excise duties

· Value Added Tax

· State royalties

 

Our philosophy on transfer pricing is that related party transactions should be charged at arm's length prices. Transfer pricing studies were performed by transfer pricing specialists on all our related party transactions and such transactions were found to be within acceptable norms compared to comparable transactions in similar companies. Lonmin inherited a number of companies in tax haven jurisdictions from previous unbundling and acquisition transactions. These companies are dormant entities and therefore do not receive any income. Furthermore, Lonmin does not pay any of its income to any of the dormant tax haven companies in these inherited structures.

Cash Generation and Net (Debt)/Cash

The following table summarises the main components of the cash flow during the period:

 

Year ended 30 September

2014

2013

$m

$m

Operating (loss)/profit

(255)

147

Depreciation, amortisation and impairment

142

157

Changes in working capital

18

(246)

Other non-cash movements

(5)

(5)

Cash flow (utilised in)/generated from operations

(100)

53

Interest and finance costs

(16)

(33)

Tax paid

-

(4)

Trading cash (outflow)/inflow

(116)

16

Capital expenditure

(93)

(159)

Dividends paid to minority shareholders

(37)

(11)

Free cash outflow

(246)

(154)

Net proceeds from equity issuance

-

767

(Contribution to)/distribution from joint venture

Issue of other ordinary share capital

(1)

1

1

1

Cash (outflow)/inflow

(246)

615

Opening net cash/(debt)

201

(421)

Foreign exchange

13

13

Unamortised fees

3

(6)

Closing net (debt)/cash

(29)

201

Trading cash flow (cents per share)

(20.4)c

3.0c

Free cash flow (cents per share)

(43.2)c

(28.9)c

 

Cash flow utilised in operations in the year ended 30 September 2014 increased by $153 million from an inflow of $53 million in the prior year to an outflow of $100 million in the year under review. The cash outflow for the 2014 financial year is largely driven by the operating loss as result of the strike action partially offset by positive working capital movements which comprised mainly of stock released during the period. In 2013 the cash outflow was largely as a result of working capital movements, a significant portion of which was attributed to the replenishment of the metal in process pipeline following the production stoppage of 2012.

 

Trading cash outflow for the year increased by $132 million to $116 million compared to the prior year trading cash inflow of $16 million. The cash outflow on interest and finance costs decreased by $17 million largely due to the timing of payments over the two periods under review. The trading cash outflow per share was 20.4 cents compared to a cash inflow of 3.0 cents in the prior year.

 

Capital expenditure cash flow at $93 million was $66 million (or 42%) below the prior year spend because the Group's capital investment programme was impacted by the strike. In Mining the majority of the project capital funds were allocated to the K3 UG2 decline project, Saffy shaft and Rowland shaft to continue with ore reserve development projects that are currently in execution. In 2014, the Process operations spent $21 million on capital compared to $52 million in 2013. The 2014 expenditure included completion of the feasibility studies for the Bulk Tailings project and startup of the PMR OPM circuit upgrade which is due to be completed by December 2015 and sustaining capital.

 

During the 2013 financial year, the Group undertook a successful Rights Issue which was completed in December 2012 and raised total net proceeds of $767 million after costs and foreign exchange charges. The balance sheet strength attained following this equity issuance coupled with cash conservation measures resulted in the Group absorbing the operational disruption caused by the strike. This has allowed the Group to fund the production ramp up following the strike from current cash resources, limiting net debt at 30 September 2014 to just $29 million.

 

Key Financial Risks

The Group faces many risks in the operation of its business. The Group's strategy takes into account known risks, but risks will exist of which we are currently unaware. The financial review focuses on financial risk management.

 

Financial Risk Management

The main financial risks faced by the Group relate to the availability of funds to meet business needs (liquidity risk), the risk of default by counterparties to financial transactions (credit risk) and fluctuations in interest, foreign exchange rates and commodity prices (market risk). Factors which are outside the control of management which can have a significant impact on the business remain, specifically, the fluctuations in the Rand/US Dollar exchange rate and PGM commodity prices.

 

These are the critical factors to consider when addressing the issue of whether the Group is a Going Concern.

 

Liquidity Risk

The policy on liquidity is to ensure that the Group has sufficient funds to facilitate all on-going operations. The Group funds its operations through a mixture of equity funding and borrowings. The Group's philosophy is to maintain an appropriately low level of financial gearing given the exposure of the business to fluctuations in PGM commodity prices and the Rand / US Dollar exchange rate. We ordinarily seek to fund capital requirements from equity.

 

As part of the annual budgeting and long-term planning process, the Group's cash flow forecast is reviewed and approved by the Board. The cash flow forecast is amended for any material changes identified during the year, for example material acquisitions and disposals or changes in production forecasts. Where funding requirements are identified from the cash flow forecast, appropriate measures are taken to ensure these requirements can be satisfied. Factors taken into consideration are:

 

· the size and nature of the requirement;

· preferred sources of finance applying key criteria of cost, commitment, availability, security / covenant conditions;

· recommended counterparties, fees and market conditions; and

· covenants, guarantees and other financial commitments.

 

The Group's current debt facilities are summarised as follows:

 

· Revolving Credit Facility of $400 million at a Lonmin Plc level which matures in May 2016; and

· Three bilateral facilities of R660 million each at a Western Platinum Limited (WPL) level, each consisting of a R330 million five year committed component which matures in June 2016 and a R330 million one year committed component that can be rolled annually.

 

The following financial covenants apply to these facilities:

 

· consolidated tangible net worth will not be less than $2,250 million;

· consolidated net debt will not exceed 25 per cent of consolidated tangible net worth; and

· if:

o in respect of the amended US Dollar Facilities Agreement, the aggregate amount of outstanding loans exceeds $75 million at any time during the last six months of any test period; or

o in respect of both the amended US Dollar Facilities Agreement and the amended Rand Facilities Agreements, consolidated net debt exceeds $300 million as of the last day of any test period,

 

the capital expenditure of the Group must not exceed the limits set out in the table below, provided that, if 110 per cent of budgeted capital expenditure for any test period ending on or after 30 September 2013 is lower than the capital expenditure limit set out in the table below for that test period, then the capital expenditure limit for that test period shall be equal to 110 per cent of such budgeted capital expenditure.

 

Test Period Capital expenditure limit (ZAR)

 

1 October 2012 to 31 March 2013 (inclusive) . . . . . . . . . . . . . . . . . . . . . 800,000,000

1 October 2012 to 30 September 2013 (inclusive) . . . . . . . . . . . . . . . . . . 1,600,000,000

1 April 2013 to 31 March 2014 (inclusive) . . . . . . . . . . . . . . . . . . . . . . . . 1,800,000,000

1 October 2013 to 30 September 2014 (inclusive) . . . . . . . . . . . . . . . . . . 2,000,000,000

1 April 2014 to 31 March 2015 (inclusive) . . . . . . . . . . . . . . . . . . . . . . . . 3,000,000,000

1 October 2014 to 30 September 2015 (inclusive) . . . . . . . . . . . . . . . . . . 4,000,000,000

1 April 2015 to 31 March 2016 (inclusive) . . . . . . . . . . . . . . . . . . . . . . . . 4,000,000,000

1 October 2015 to 30 September 2016 (inclusive) . . . . . . . . . . . . . . . . . . 4,000,000,000

 

Credit Risk

 

Banking Counterparties

Banking counterparty credit risk is managed by spreading financial transactions across an approved list of counterparties of high credit quality. Banking counterparties are approved by the Board and consist of the ten banks that participate in Lonmin's bank debt facilities. These counter-parties comprise: BNP Paribas S.A., Citigroup Global Markets Limited, FirstRand Bank Limited, HSBC Bank Plc, Investec Bank Limited, J.P. Morgan Limited, Lloyds TSB Bank Plc, The Royal Bank of Scotland N.V., The Standard Bank of South Africa Limited and Standard Chartered Bank.

 

Trade Receivables

The Group is exposed to significant trade receivable credit risk through the sale of PGMs to a limited group of customers.

 

This risk is managed as follows:

 

· aged analysis is performed on trade receivable balances and reviewed on a monthly basis;

· credit ratings are obtained on any new customers and the credit ratings of existing customers are monitored on an on-going basis;

· credit limits are set for customers; and

· trigger points and escalation procedures are clearly defined.

 

It should be noted that a significant portion of Lonmin's revenue is from two key customers. However, both of these customers have strong investment grade ratings and their payment terms are very short, thereby reducing trade receivable credit risk significantly.

 

HDSA Receivables

HDSA receivables are secured on the HDSA's shareholding in Incwala Resources (Pty) Limited. Refer to note 8 in the financial statements for details on the valuation of this security and the resulting impairment charge.

 

Interest Rate Risk

Although the Group is in a net debt position, this risk is not considered to be high at this point in time. The interest position is kept under constant review in conjunction with the liquidity policy outlined above and the future funding requirements of the business.

 

Foreign Currency Risk

The Group's operations are predominantly based in South Africa and the majority of the revenue stream is in US Dollars. However, the bulk of the Group's operating costs and taxes are paid in Rands. Most of the cash received in South Africa is in US Dollars. Most of the Group's funding sources are in US Dollars.

 

The Group's reporting currency is the US Dollar and the share capital of the Company is based in US Dollars.

 

During the year under review Lonmin did not undertake any foreign currency hedging.

 

Commodity Price Risk

Our policy is not to hedge commodity price exposure on PGMs, excluding gold, and therefore any change in prices will have a direct effect on the Group's trading results.

 

For base metals and gold, hedging is undertaken where the Board determines that it is in the Group's interest to hedge a proportion of future cash flows. The policy allows Lonmin to hedge up to a maximum of 75% of the future cash flows from the sale of these products looking forward over the next 12 to 24 months. The Group did not undertake any hedging of base metals under this authority in the period under review and no forward contracts were in place in respect of base metals at the end of the period.

 

In respect of gold, Lonmin entered into a prepaid sale of 75% of its current gold production for the next 54 months in March 2012. In terms of this contract Lonmin will deliver 70,700 ounces of gold over the period with delivery on a quarterly basis and in return received an upfront payment of $107 million. The upfront receipt was accounted for as deferred revenue on our balance sheet and is being released to profit and loss as deliveries take place at an average price of $1,510 per ounce delivered.

 

Contingent Liabilities

 

The Group provided third party guarantees to Eskom as security to cover estimated electricity consumption for three months. At 30 September 2014 these guarantees amounted to $9 million (2013 - $10 million).

 

Simon Scott

Chief Financial Officer

9 November 2014

 

RESPONSIBILITY STATEMENT OF THE DIRECTORS IN RESPECT OF THE ANNUAL REPORT AND ACCOUNTS

 

We confirm that to the best of our knowledge:

 

· the financial statements, prepared in accordance with the applicable set of accounting standards, give a true and fair view of the assets, liabilities, financial position and profit or loss of the Company and the undertakings included in the consolidation taken as a whole; and

 

· the Directors' report and Strategic report include a fair review of the development and performance of the business and the position of the Company and the undertakings included in the consolidation taken as a whole, together with a description of the principal risks and uncertainties that they face.

 

 

 

Brian Beamish Simon Scott

Chairman Chief Financial Officer

 

 

9 November 2014

 

 

 

 

OPERATING STATISTICS - 5 year review

 

 

 

Units

2014

2013

2012

2011

2010

Tonnes mined

K3 shaft

kt

1,484

3,101

2,646

2,750

2,498

Marikana

K4 shaft

kt

-

4

117

45

7

4B/1B shaft

kt

891

1,845

1,622

1,643

1,610

Karee

kt

2,375

4,950

4,384

4,438

4,115

Rowland shaft

kt

1,005

1,781

1,599

2,082

2,099

Newman shaft

kt

428

948

919

1,197

1,502

Hossy shaft

kt

609

1,051

864

793

801

W1 shaft

kt

102

170

126

154

93

East 1 shaft 1

kt

104

390

496

536

524

Westerns

kt

2,249

4,339

4,003

4,764

5,019

Saffy shaft

kt

782

1,150

898

1,110

1,117

East 2 shaft

kt

279

426

397

484

422

East 3 shaft

kt

28

94

104

153

136

Easterns

kt

1,090

1,671

1,399

1,748

1,675

Underground

kt

5,713

10,960

9,786

10,949

10,809

Opencast

kt

333

528

443

601

329

Total

kt

6,046

11,487

10,229

11,550

11,137

Pandora (100%) 2

Underground

kt

299

571

435

394

391

Limpopo 3

Underground

kt

6

-

-

-

-

Lonmin (100%)

 

Total Tonnes mined

kt

6,351

12,058

10,663

11,994

11,529

% tonnes mined from UG2 reef (100%)

%

74.1

73.9

71.7

73.2

76.1

Lonmin (attributable) 2

Underground & Opencast

kt

6,180

11,730

10,413

11,718

11,304

Ounces mined 4

Lonmin excluding Pandora

Platinum

oz

371,651

717,882

635,346

695,474

686,108

Pandora (100%)

Platinum

oz

20,327

40,917

30,714

25,342

25,670

Limpopo

Platinum

oz

255

-

-

-

-

Lonmin

Platinum

oz

392,233

758,799

666,060

720,816

711,778

Lonmin excluding Pandora

Total PGMs

oz

707,913

1,340,678

1,174,776

1,306,082

1,297,452

Pandora (100%)

Total PGMs

oz

40,044

78,353

58,300

48,420

49,227

Limpopo

Total PGMs

oz

572

-

-

-

-

Lonmin

Total PGMs

oz

748,529

1,419,032

1,233,076

1,354,501

1,346,679

Tonnes milled 5

Marikana

Underground

kt

5,389

10,854

9,936

10,896

10,655

Opencast

kt

422

393

450

748

129

Total

kt

5,810

11,248

10,386

11,643

10,784

Pandora (100%) 6

Underground

kt

281

574

432

394

391

Limpopo 7

Underground

kt

27

-

-

-

-

Lonmin Platinum

Underground

kt

5,696

11,428

10,367

11,290

11,046

Opencast

kt

422

393

450

748

129

Total

kt

6,118

11,822

10,817

12,037

11,176

Milled head grade 8

Lonmin Platinum

Underground

g/t

4.48

4.60

4.56

4.54

4.67

Opencast

g/t

3.20

2.92

3.01

2.23

2.25

Total

g/t

4.39

4.54

4.49

4.40

4.65

Concentrator recovery rate 9

Lonmin Platinum

Underground

%

87.0

87.0

86.1

85.4

84.8

Opencast

%

84.5

85.3

85.9

81.6

63.8

Total

%

86.9

87.0

86.1

85.3

84.7

OPERATING STATISTICS - 5 year review

 

 

 

Units

2014

2013

2012

2011

2010

Metals-in-concentrate 10

Platinum

oz

355,926

706,012

646,393

694,149

668,620

Marikana

Palladium

oz

164,960

323,622

295,409

324,655

313,590

Gold

oz

9,879

17,664

16,925

17,471

14,969

Rhodium

oz

49,908

95,241

83,144

91,659

93,043

Ruthenium

oz

81,693

144,304

127,269

144,369

144,913

Iridium

oz

16,143

33,059

27,610

31,294

31,432

Total PGMs

oz

678,508

1,319,902

1,196,750

1,303,597

1,266,566

Limpopo

Platinum

oz

1,121

-

-

-

-

Palladium

oz

974

-

-

-

-

Gold

oz

93

-

-

-

-

Rhodium

oz

114

-

-

-

-

Ruthenium

oz

161

-

-

-

-

Iridium

oz

44

-

-

-

-

Total PGMs

oz

2,508

-

-

-

-

Pandora

Platinum

oz

18,913

41,117

30,625

25,241

25,756

Palladium

oz

8,960

19,190

14,261

11,847

12,108

Gold

oz

54

315

228

179

176

Rhodium

oz

3,226

6,563

4,743

3,865

4,036

Ruthenium

oz

5,168

9,764

7,135

6,070

6,228

Iridium

oz

916

1,773

1,195

996

1,041

Total PGMs

oz

37,237

78,721

58,188

48,199

49,345

Lonmin Platinum before

Platinum

oz

375,960

747,129

677,019

719,390

694,376

Concentrate Purchases

Palladium

oz

174,894

342,812

309,670

336,502

325,698

Gold

oz

10,026

17,979

17,153

17,650

15,145

Rhodium

oz

53,248

101,803

87,886

95,524

97,079

Ruthenium

oz

87,022

154,067

134,404

150,439

151,141

Iridium

oz

17,103

34,832

28,805

32,290

32,473

Total PGMs

oz

718,253

1,398,623

1,254,938

1,351,796

1,315,911

Concentrate purchases

Platinum

oz

4,398

3,813

2,802

-

-

Palladium

oz

1,242

1,132

973

-

-

Gold

oz

14

14

10

-

-

Rhodium

oz

531

421

329

-

-

Ruthenium

oz

546

428

404

-

-

Iridium

oz

224

172

129

-

-

Total PGMs

oz

6,955

5,980

4,647

-

-

Lonmin Platinum

Platinum

oz

380,359

750,942

679,821

719,390

694,376

Palladium

oz

176,136

343,944

310,643

336,502

325,697

Gold

oz

10,040

17,993

17,163

17,650

15,144

Rhodium

oz

53,779

102,225

88,216

95,524

97,079

Ruthenium

oz

87,567

154,495

134,808

150,439

151,141

Iridium

oz

17,327

35,004

28,934

32,290

32,473

Total PGMs

oz

725,208

1,404,603

1,259,585

1,351,796

1,315,911

Nickel 11

mt

2,092

3,743

3,489

3,537

2,972

Copper 11

mt

1,314

2,340

2,226

2,223

1,824

 

OPERATING STATISTICS - 5 year review

 

 

Units

2014

2013

2012

2011

2010

Refined production

Platinum

oz

431,683

707,665

648,414

686,877

607,794

Lonmin refined metal

Palladium

oz

208,756

319,841

310,558

323,907

303,748

production

Gold

oz

12,299

18,676

18,398

18,013

15,284

Rhodium

oz

76,940

79,124

110,896

86,702

94,690

Ruthenium

oz

107,166

171,052

153,394

164,374

147,854

Iridium

oz

27,991

28,068

32,844

26,337

36,073

Total PGMs

oz

864,835

1,324,426

1,274,503

1,306,210

1,205,443

Toll refined metal production

Platinum

oz

4,501

1,364

38,958

44,396

77,571

Palladium

oz

1,765

662

21,043

49,119

15,274

Gold

oz

116

289

729

2,879

1,100

Rhodium

oz

1,546

1,837

4,717

14,402

5,411

Ruthenium

oz

7,417

6,519

7,907

24,408

8,278

Iridium

oz

1,914

1,012

1,944

5,249

1,695

Total PGMs

oz

17,259

11,683

75,299

140,453

109,328

Total refined PGMs

Platinum

oz

436,184

709,029

687,372

731,273

685,365

Palladium

oz

210,521

320,503

331,601

373,026

319,022

Gold

oz

12,415

18,965

19,128

20,892

16,383

Rhodium

oz

78,486

80,961

115,613

101,103

100,100

Ruthenium

oz

114,583

177,571

161,300

188,782

156,133

Iridium

oz

29,905

29,081

34,788

31,586

37,768

Total PGMs

oz

882,094

1,336,109

1,349,802

1,446,662

1,314,772

Base metals

Nickel 12

mt

2,387

3,532

3,786

4,188

3,475

Copper 12

mt

1,480

2,168

2,153

2,454

2,091

Sales

Platinum

oz

441,684

695,803

701,831

720,783

681,424

Refined metal sales

Palladium

oz

212,500

313,030

335,849

372,284

315,515

Gold

oz

13,100

18,423

19,273

19,417

16,289

Rhodium

oz

81,120

77,625

119,054

102,653

98,657

Ruthenium

oz

121,904

168,266

170,751

187,189

153,865

Iridium

oz

29,778

28,828

37,187

33,603

34,790

Total PGMs

oz

900,087

1,301,973

1,383,945

1,435,929

1,300,540

Concentrate and other 13

Platinum

oz

-

-

-

-

24,850

Palladium

oz

-

-

-

-

-

Gold

oz

-

-

-

-

-

Rhodium

oz

-

-

-

-

-

Ruthenium

oz

-

-

-

-

-

Iridium

oz

-

-

-

-

-

Total PGMs

oz

-

-

-

-

24,850

Lonmin Platinum

Platinum

oz

441,684

695,803

701,831

720,783

706,274

Palladium

oz

212,500

313,030

335,849

372,284

315,515

Gold

oz

13,100

18,423

19,273

19,417

16,289

Rhodium

oz

81,120

77,625

119,054

102,653

98,657

Ruthenium

oz

121,904

168,266

170,751

187,189

153,865

Iridium

oz

29,778

28,828

37,187

33,603

34,790

Total PGMs

oz

900,087

1,301,973

1,383,945

1,435,929

1,325,390

Nickel 12

mt

2,251

3,586

3,843

4,180

3,033

Copper 12

mt

1,448

2,130

2,197

2,448

2,169

Chrome 12

MT

747,881

1,388,761

1,209,643

730,278

684,654

 

 

OPERATING STATISTICS - 5 year review

 

Units

2014

2013

2012

2011

2010

Average prices

Platinum

$/oz

1,403

1,517

1,517

1,769

1,525

Palladium

$/oz

775

715

630

752

448

Gold

$/oz

1,509

1,508

1,597

1,405

1,153

Rhodium

$/oz

1,050

1,097

1,274

2,145

2,308

Ruthenium

$/oz

57

74

103

168

173

Iridium

$/oz

521

946

1,042

938

520

Basket price of PGMs 14

$/oz

1,013

1,100

1,095

1,299

1,139

Full Basket price of PGMs 15

$/oz

1,072

1,167

1,163

1,389

1,195

Basket price of PGMs 14

R/oz

10,654

10,291

8,807

9,109

8,375

Full Basket price of PGMs 15

R/oz

11,277

10,921

9,304

9,716

8,790

Nickel 12

$/MT

13,053

12,772

14,330

21,009

18,569

Copper 12

$/MT

6,810

7,113

7,201

8,612

6,623

Chrome 12

$/MT

18

19

20

27

5

 

Footnotes:

 

1

East 1 shaft is now reported under Westerns in-line with changes in management structure. Prior years have been adjusted accordingly.

2

Pandora underground and opencast tonnes mined represents 100% of the total tonnes mined on the Pandora joint venture of which 42.5% is attributable to Lonmin.

3

Limpopo underground tonnes mined represents low grade development tonnes mined whilst on care and maintenance.

4

Ounces mined have been calculated at achieved concentrator recoveries and as from 2014 with Lonmin standard downstream processing recoveries to present produced saleable ounces.

5

Tonnes milled excludes slag milling.

6

Lonmin purchases 100% of the ore produced by the Pandora joint venture for onward processing which is included in downstream operating statistics.

7

Limpopo tonnes milled represents low grade development tonnes milled.

8

Head Grade is the grammes per tonne (5PGE + Au) value contained in the tonnes milled and fed into the concentrator from the mines (excludes slag milled).

9

Recovery rate in the concentrators is the total content produced divided by the total content milled (excluding slag).

10

As from 2014, metals-in-concentrate have been calculated at Lonmin standard downstream processing recoveries to present produced saleable ounces.

11

Corresponds to contained base metals in concentrate.

12

Nickel is produced and sold as nickel sulphate crystals or solutions and the volumes shown correspond to contained metal. Copper is produced as refined product but typically at LME grade C. Chrome is produced in the form of chromite concentrate and volumes shown are in the form of chromite.

13

Concentrate and other sales have been adjusted to a saleable ounce basis using industry standard recovery rates.

14

Basket price of PGMs is based on the revenue generated in Rand and Dollar from the actual PGMs (5PGE + Au) sold in the period based on the appropriate Rand / Dollar exchange rate applicable to each sales transaction.

15

As per footnote 14 but including revenue from base metals.

OPERATING STATISTICS - 5 year review

 

 

 

Units

2014

2013

2012

2011

2010

Capital

Rm

992

1,500

3,296

2,907

1,989

Expenditure 1

$m

93

159

408

410

267

Employees and

Employees

28,276

28,379

28,230

27,796

23,915

contractors

Contractors

10,016

10,042

8,293

9,564

9,131

Exchange rates

Average rate for period 2

R/$

10.55

9.24

8.05

6.95

7.45

£/$

0.60

0.64

0.63

0.62

0.64

Closing rate

R/$

11.29

9.99

8.30

8.05

6.92

£/$

0.62

0.62

0.62

0.64

0.64

Underlying cost

Mining

$m

(622)

(919)

(877)

(995)

(811)

of sales

Concentrating

$m

(107)

(159)

(168)

(187)

(153)

PGM operations

Smelting and refining 3

$m

(106)

(133)

(147)

(172)

(156)

segment

Shared services

$m

(74)

(101)

(100)

(97)

(79)

Management and marketing services

 

$m

(24)

(26)

(35)

(32)

(31)

 

 

 

 

 

Ore, concentrate and other purchases

 

$m

(38)

(64)

(48)

(46)

(42)

Limpopo mining

$m

(3)

(7)

(9)

(7)

(5)

 

 

 

 

 

Special item adjustment

$m

287

-

121

-

-

Royalties

$m

(5)

(6)

(8)

(12)

(6)

Shared based payments

$m

(15)

(13)

(12)

(13)

(12)

Inventory movement

$m

(79)

203

(140)

(12)

111

FX and Group Charges

$m

25

44

14

5

(43)

Total PGM opera-tions segment

$m

(761)

(1,181)

(1,412)

(1,567)

(1,226)

Evaluation - excluding FX

$m

-

1

2

-

-

Exploration - excluding FX

$m

(6)

(4)

(5)

(1)

(6)

Corporate - excluding FX

$m

(2)

(10)

(4)

4

(1)

FX

$m

(1)

(4)

(2)

6

(3)

Total underlying cost of sales

$m

(771)

(1,199)

(1,421)

(1,559)

(1,235)

PGM operations

Mining

Rm

(6,556)

(8,545)

(7,079)

(7,002)

(6,026)

segment

Concentrating

Rm

(1,121)

(1,469)

(1,346)

(1,297)

(1,142)

Smelting and refining 3

Rm

(1,119)

(1,235)

(1,183)

(1,203)

(1,161)

Shared services

Rm

(786)

(928)

(805)

(679)

(586)

Management and marketing services

 

Rm

(256)

(243)

(287)

(217)

(227)

Ore, concentrate and other purchases

 

Rm

(402)

(597)

(385)

(318)

(315)

Limpopo mining

Rm

(31)

(61)

(76)

(50)

(37)

Special item adjustment

Rm

3,028

-

966

-

-

Royalties

Rm

(52)

(55)

(68)

(82)

(40)

Shared based payments

Rm

(148)

(121)

(99)

(87)

(87)

Inventory movement

Rm

(480)

2,145

(842)

(119)

649

FX and Group Charges

Rm

(1,117)

(1,247)

(218)

(517)

(53)

Rm

(9,040)

(12,356)

(11,424)

(11,572)

(9,025)

 

 

OPERATING STATISTICS - 5 year review

 

 

 

Units

2014

2013

2012

2011

2010

Cost of production

Mining

Rm

(6,556)

(8,545)

(7,079)

(7,002)

(6,026)

(PGM operations

Concentrating

Rm

(1,121)

(1,469)

(1,346)

(1,297)

(1,142)

segment) 4

Smelting and refining 3

Rm

(1,119)

(1,235)

(1,183)

(1,203)

(1,161)

Cost

Shared services

Rm

(786)

(928)

(805)

(679)

(586)

Management and marketing services

 

Rm

(256)

(243)

(287)

(217)

(227)

Rm

(9,838)

(12,420)

(10,701)

(10,399)

(9,142)

 

 

 

 

 

PGM Saleable

ounces

Mined ounces excluding ore purchases

 

oz

707,913

1,340,678

1,174,776

1,306,082

1,297,452

Metals-in-concentrate before concentrate purchases

 

oz

715,746

1,398,623

1,254,938

1,351,796

1,315,911

Refined ounces

oz

882,094

1,336,109

1,349,802

1,446,662

1,314,772

Metals-in-concentrate including concentrate purchases

 

 

oz

722,701

1,404,603

1,259,585

1,351,796

1,315,911

 

 

 

 

Cost of production

Mining

R/oz

(9,261)

(6,373)

(6,026)

(5,361)

(4,644)

Concentrating

R/oz

(1,567)

(1,051)

(1,073)

(960)

(868)

Smelting and refining 3

R/oz

(1,269)

(925)

(877)

(832)

(883)

Shared services

R/oz

(1,087)

(661)

(639)

(503)

(446)

Management and marketing services

 

R/oz

(355)

(173)

(228)

(161)

(173)

R/oz

(13,538)

(9,182)

(8,843)

(7,815)

(7,013)

 

 

 

 

 

% increase in cost

Mining

%

(45.3)

(5.8)

(12.4)

(15.4)

(0.9)

of production

Concentrating

%

(49.2)

2.1

(11.8)

(10.6)

(6.4)

Smelting and refining 3

%

(37.3)

(5.4)

(5.4)

5.8

(11.8)

Shared services

%

(64.5)

(3.3)

(27.2)

(12.8)

28.3

Management and marketing services

 

%

(104.9)

24.1

(41.9)

7.0

27.7

%

(47.4)

(3.8)

(13.1)

(11.4)

0.8

 

 

 

Footnotes:

 

1

Capital expenditure is the aggregate of the purchase of property, plant and equipment and intangible assets (includes capital accruals and excludes capitalised interest).

2

Exchange rates are calculated using the market average daily closing rate over the course of the period.

3

Comprises of Smelting and Refining costs as well as direct Process Operations shared costs.

4

It should be noted that with the restructuring of the business and reporting changes in 2010, and 2011 and 2014 the cost allocation between business units has been changed and, therefore, whilst the total is on a like-for-like basis, individual line items are not totally comparable.

 

 

Consolidated income statement

for the year ended 30 September

 

 

 

 

 

 

 

 

Note

 

2014

Underlying i

$m

Special

items

(note 3)

$m

 

2014

Total

$m

2013

Underlying i

$m

Special

items

(note 3)

$m

 

2013

Total

$m

Revenue

2

965

-

965

1,520

-

1,520

(LBITDA) / EBITDA ii

194

(307)

(113)

321

(17)

304

Depreciation, amortisation and impairment

 

 

(142)

-

(142)

(157)

-

(157)

Operating (loss) / profit iii

52

(307)

(255)

164

(17)

147

Impairment of available for sale financial assets

-

(1)

(1)

-

(2)

(2)

Finance income

4

26

18

44

9

26

35

Finance expenses

4

(28)

(80)

(108)

(19)

(25)

(44)

Share of (loss) / profit of equity accounted investments

(4)

(2)

(6)

4

-

4

(Loss) / profit before taxation

46

(372)

(326)

158

(18)

140

Income tax credit iv

5

(5)

128

123

(27)

85

58

(Loss) / profit for the year

41

(244)

(203)

131

67

198

Attributable to:

- Equity shareholders of Lonmin Plc

- Non-controlling interests

31

10

(219)

(25)

(188)

(15)

109

22

57

10

166

32

 

(Loss) / earnings per share

6

(33.0)c

31.2c

Diluted (loss) / earnings per share v

6

(33.0)c

31.1c

 

Consolidated statement of comprehensive income

for the year ended 30 September

 

 

 

 

2014

Total

$m

2013

Total

$m

(Loss) / profit for the year

(203)

198

Items that may be reclassified subsequently to the income statement

- Change in fair value of available for sale financial assets

(1)

-

- Changes in settled cash flow hedges released to the income statement

-

8

- Foreign exchange loss on retranslation of equity accounted investments

(3)

(9)

Total other comprehensive expense for the period

(4)

(1)

Total comprehensive (loss) / income for the period

(207)

197

 

Attributable to:

- Equity shareholders of Lonmin Plc

- Non-controlling interests

 

 

 

 

(192)

(15)

166

31

(207)

197

Footnotes:

 

i

Underlying results and (loss) / earnings per share are based on reported results and (loss) / earnings per share excluding the effect of special items as defined in note 3.

ii

(LBITDA) / EBITDA is operating (loss) / profit before depreciation, amortisation and impairment of goodwill, intangibles and property, plant and equipment.

iii

Operating (loss) / profit is defined as revenue less operating expenses before impairment of available for sale financial assets, finance income and expenses and share of (loss) / profit of equity accounted investments.

iv

The income tax credit substantially relates to overseas taxation and includes net exchange gains of $42 million (2013 - $80 million) as disclosed in note 5.

v

Diluted (loss) / earnings per share is based on the weighted average number of ordinary shares in issue adjusted by dilutive outstanding share options.

Consolidated statement of financial position

as at 30 September

 

 

Note

2014

$m

2013

$m

Non-current assets

Goodwill

40

40

Intangible assets

457

462

Property, plant and equipment

2,882

2,908

Equity accounted investments

28

36

Other financial assets

8

27

430

3,434

3,876

Current assets

Inventories

373

449

Trade and other receivables

76

86

Tax recoverable

2

4

Other financial assets

8

337

-

Cash and cash equivalents

9

143

201

931

740

Current liabilities

Trade and other payables

(244)

(295)

Interest bearing loans and borrowings

9

(86)

-

Deferred revenue

(27)

(23)

(357)

(318)

Net current assets

574

422

 

Non-current liabilities

Interest bearing loans and borrowings

9

(86)

-

Deferred tax liabilities

(376)

(501)

Deferred revenue

(23)

(47)

Provisions

(141)

(140)

(626)

(688)

Net assets

3,382

3,610

 

Capital and reserves

Share capital

570

569

Share premium

1,411

1,411

Other reserves

88

88

Retained earnings

1,164

1,341

Attributable to equity shareholders of Lonmin Plc

3,233

3,409

Attributable to non-controlling interests

149

201

Total equity

3,382

3,610

 

The financial statements of Lonmin Plc, registered number 103002, were approved by the Board of Directors on

9 November 2014 and were signed on its behalf by:

 

 

Brian Beamish Chairman

Simon ScottChief Financial Officer

Consolidated statement of changes in equity

for the year ended 30 September

 

Equity interest

Called up

share

capital

$m

Share

premium

account

$m

 

Other

reserves i

$m

 

Retained

earnings ii

$m

 

 

Total

$m

Non-controlling

interests iii

$m

 

Total

equity

$m

At 1 October 2012

203

997

80

1,208

2,488

257

2,745

Profit for the year

-

-

-

166

166

32

198

Total other comprehensive expense:

-

-

8

(8)

-

(1)

(1)

- Changes in settled cash flow hedges released to the income statement

 

-

-

8

-

8

-

8

- Foreign exchange loss on retranslation of equity accounted investments

-

-

-

(8)

(8)

(1)

(9)

Transactions with owners, recognised directly in equity:

366

414

-

(25)

755

(87)

668

- Share-based payments

-

-

-

14

14

-

14

- Incwala equity accounting adjustment

-

-

-

(39)

(39)

(76)

(115)

- Share capital and share premium recognised on Rights Issue

365

459

-

-

824

-

824

- Rights Issue costs charged to share premium

-

(45)

-

-

(45)

-

(45)

- Shares issued on exercise of share options

1

-

-

-

1

-

1

- Dividends

-

-

-

-

-

(11)

(11)

At 30 September 2013

569

1,411

88

1,341

3,409

201

3,610

 

Equity interest

Called up

share

capital

$m

Share

premium

account

$m

 

Other

reserves i

$m

 

Retained

earnings ii

$m

 

 

Total

$m

Non-controlling

interests iii

$m

 

Total

equity

$m

At 1 October 2013

569

1,411

88

1,341

3,409

201

3,610

Loss for the year

-

-

-

(188)

(188)

(15)

(203)

Total other comprehensive expense:

-

-

-

(4)

(4)

-

(4)

- Change in fair value of available for sale financial assets

-

-

-

(1)

(1)

-

(1)

- Foreign exchange loss on retranslation of equity accounted investments

-

-

-

(3)

(3)

-

(3)

Transactions with owners, recognised directly in equity:

1

-

-

15

16

(37)

(21)

- Share-based payments

-

-

-

15

15

-

15

- Shares issued on exercise of share options iv

1

-

-

-

1

-

1

- Dividends

-

-

-

-

-

(37)

(37)

At 30 September 2014

570

1,411

88

1,164

3,233

149

3,382

 

Footnotes:

 

i

Other reserves at 30 September 2014 represent the capital redemption reserve of $88 million (2013 - $88 million).

ii

Retained earnings include $4 million of accumulated credits in respect of fair value movements on available for sale financial assets (2013 - $5 million accumulated credits) and a $9 million debit of accumulated exchange on retranslation of equity accounted investments (2013 - $6 million debit).

iii

Non-controlling interests represent a 13.76% shareholding in each of Eastern Platinum Limited, Western Platinum Limited and Messina Limited and a 19.87% shareholding in Akanani Mining (Proprietary) Limited.

iv

During the year 1,206,465 share options were exercised (2013 - 900,000) on which $1 million of cash was received (2013 - $0.9 million).

Consolidated statement of cash flows

for the year ended 30 September

 

 

Note

2014

$m

2013

$m

(Loss) / profit for the year

(203)

198

Taxation

5

(123)

(58)

Share of loss / (profit) of equity accounted investments

6

(4)

Finance income

4

(44)

(35)

Finance expenses

4

108

44

Impairment of available for sale financial assets

3

1

2

Non-cash movement on deferred revenue

(20)

(24)

Depreciation, amortisation and impairment

142

157

Change in inventories

76

(189)

Change in trade and other receivables

7

(2)

Change in trade and other payables

(51)

(32)

Change in provisions

(14)

(23)

Share-based payments

15

14

Loss on disposal of property, plant and equipment

-

5

Cash (outflow) / inflow from operations

(100)

53

Interest received

15

1

Interest and bank fees paid

(31)

(34)

Tax paid

-

(4)

Cash (outflow) / inflow from operating activities

(116)

16

Cash flow from investing activities

(Contribution to) / distribution from joint venture

(1)

1

Purchase of property, plant and equipment

(91)

(156)

Purchase of intangible assets

(2)

(3)

Cash used in investing activities

(94)

(158)

Cash flow from financing activities

Dividends paid to non-controlling interests

(37)

(11)

Proceeds from current borrowings

9

605

257

Repayment of current borrowings

9

(518)

(380)

Proceeds from non-current borrowings

9

88

369

Repayment of non-current borrowings

9

-

(988)

Proceeds from equity issuance

-

823

Costs of issuing shares

-

(45)

Loss on settlement of forward exchange contracts on equity issuance

-

(11)

Issue of other ordinary share capital

1

1

Cash inflow from financing activities

139

15

Decrease in cash and cash equivalents

9

(71)

(127)

Opening cash and cash equivalents

9

201

315

Effect of foreign exchange rate changes

9

13

13

Closing cash and cash equivalents

9

143

201

 

Notes to the accounts

 

1. Statement on accounting policies

 

Basis of preparation

 

The financial information presented has been prepared on the basis of International Financial Reporting Standards (IFRSs) as adopted by the EU.

 

Going concern

In determining the appropriate basis of preparation of the financial statements, the Directors are required to consider whether the Group can continue in operational existence for the foreseeable future.

 

The debt facilities currently available to the Group are summarised as follows:

· Revolving Credit Facility of $400 million at a Lonmin Plc level; and

· Three bilateral facilities of R660 million each at a Western Platinum Limited (WPL) level.

This capital structure places the Group in a strong position to ride the normal working capital cycles while providing a buffer to withstand the effects of operational shocks that the business may face. One such operational shock manifested in 2014 in the form of AMCU's protected strike action in the South African Platinum sector which commenced on 23 January 2014. The strike had a significant financial impact as fixed production overheads continued to be incurred with no associated production output. The strike ended after five months with the signing of a three year wage agreement to 30 June 2016. One of the key terms of the agreement was that the employees would not strike over wage negotiations for those three years. On 24 June 2014 an agreement was reached for a return to work and 85% of our striking employees returned to work on 25 June 2014 and the safe ramp up of operations exceeded expectations and industry peers. The business was back up to full production during August with tonnes mined in August and September 2014 exceeding August and September 2013.

 

The capital structure referred to above allowed the business to absorb the financial impact of the strike. This combined with the successful ramp of the business has seen the Group end the year in a net debt position of just $29 million at 30 September 2014.

 

The financial performance of the Group is also dependent upon the wider economic environment in which the Group operates. Factors exist which are outside the control of management which can have a significant impact on the business, specifically, volatility in the Rand / US Dollar exchange rate and PGM commodity prices.

 

In assessing the Group's ability to continue as a going concern, the Directors have prepared cash flow forecasts for a period in excess of 12 months. Various scenarios have been considered to test the Group's resilience against operational risks including:

· Adverse movements in the Rand / US Dollar exchange rate and PGM commodity prices or a combination thereof.

· Failure to meet forecast production targets.

The Directors have concluded that the Group's capital structure provides sufficient head room to cushion against downside operational risks and minimises the risk of breaching debt covenants.

As a result, the Directors believe that the Group will continue to meet its obligations as they fall due and comply with its financial covenants and accordingly have formed a judgement that it is appropriate to prepare the financial statements on a going concern basis. Therefore, these financial statements do not include any adjustments that would result if the going concern basis on preparation is inappropriate.

Notes to the accounts (continued)

 

1. Statement on accounting policies (continued)

 

New standards and amendments in the year

 

The following revised IFRS's have been adopted in these financial statements. The application of these IFRS's did not have any material impact on the amounts reported for the current and prior years:

· IFRIC 20 - Stripping costs in the production phase of a surface mine (effective 1 January 2013 ) requires that stripping costs incurred, which provide improved access to the ore, be recognised as a non-current asset ("stripping activity asset") when certain criteria are met. The principles of IFRIC 20 were adopted by the Group in 2012.

· Amendment to IAS 16 - Property, plant and equipment (effective 1 January 2013) clarifies the accounting for spare parts, stand-by equipment and servicing equipment.

· Amendment to IAS 34 - Disclosure of segment assets and segment liabilities (effective 1 January 2013) aligns the disclosure requirements for segment assets and segment liabilities in interim financial reporting with IFRS 8 Operating segments.

· IFRS 13 - Fair value measurement (effective 1 January 2013) defines fair value, establishes a framework for measuring fair value and sets out disclosure requirements for fair value measurements.

· Amendments to IAS 36 - Recoverable amount disclosures for non-financial assets (effective 1 January 2014, but early adopted by the Group) reverses the unintended requirement in IFRS 13 Fair Value Measurement to disclose the recoverable amount of every cash-generating unit to which significant goodwill or indefinite-lived intangible assets have been allocated. Under the amendments, recoverable amount is required to be disclosed only when an impairment loss has been recognised or reversed.

 

There were no other new standards, interpretations or amendments to standards issued and effective for the year which materially impacted the Group's financial statements.

Notes to the accounts (continued)

 

2. Segmental analysis

 

The Group distinguishes between three reportable operating segments being the Platinum Group Metals (PGM) Operations segment, the Evaluation segment and the Exploration segment.

 

The PGM Operations segment comprises the activities involved in the mining and processing of PGMs, together with associated base metals, which are carried out entirely in South Africa. These operations are integrated and designed to support the process for extracting and refining PGMs from underground. PGMs move through each stage of the process and undergo successive levels of refinement which result in fully refined metals. The Chief Executive Officer, who performs the role of Chief Operating Decision Maker (CODM), views the PGM Operations segment as a single whole for the purposes of financial performance monitoring and assessment and does not make resource allocations based on margin, costs or cash flows incurred at each separate stage of the process. In addition, the CODM makes his decisions for running the business on a day to day basis using the physical operating statistics generated by the business as these summarise the operating performance of the entire segment.

 

The Evaluation segment covers the evaluation through pre-feasibility of the economic viability of newly discovered PGM deposits. Currently all of the evaluation projects are based in South Africa.

 

The Exploration segment covers the activities involved in the discovery or identification of new PGM deposits. This activity occurs on a worldwide basis.

 

No operating segments have been aggregated. Operating segments have consistently adopted the consolidated basis of accounting and there are no differences in measurement applied. The Other segment covers mainly the results and investment activities of the corporate Head Office. The only intersegment transactions involve the provision of funding between segments and any associated interest.

 

Year ended 30 September 2014

PGM

Operations

Segment

$m

 

Evaluation

Segment

$m

 

Exploration

Segment

$m

 

 

Other

$m

Inter-

segment

Adjustments

$m

 

 

Total

$m

Revenue (external sales by product):

Platinum

620

-

-

-

-

620

Palladium

165

-

-

-

-

165

Gold

21

-

-

-

-

21

Rhodium

85

-

-

-

-

85

Ruthenium

7

-

-

-

-

7

Iridium

15

-

-

-

-

15

PGMs

913

-

-

-

-

913

Nickel

29

-

-

-

-

29

Copper

10

-

-

-

-

10

Chrome

13

-

-

-

-

13

965

-

-

-

-

965

Notes to the accounts (continued)

 

2. Segmental analysis (continued)

 

Year ended 30 September 2014

PGM

Operations

Segment

$m

 

Evaluation

Segment

$m

 

Exploration

Segment

$m

 

 

Other

$m

Inter-

segment

Adjustments

$m

 

 

Total

$m

Underlying i:

EBITDA / (LBITDA) ii

204

5

(6)

(9)

-

194

Depreciation, amortisation and impairment

(142)

-

-

-

-

(142)

Operating profit / (loss) ii

62

5

(6)

(9)

-

52

Finance income

15

-

-

21

(10)

26

Finance expenses

(19)

-

-

(19)

10

(28)

Share of loss of equity accounted investments

(4)

-

-

-

-

(4)

Profit / (loss) before taxation

54

5

(6)

(7)

-

46

Income tax expense

(5)

-

-

-

-

(5)

Underlying profit / (loss) after taxation

49

5

(6)

(7)

-

41

Special items (note 3) iii

(181)

-

-

(63)

-

(244)

(Loss) / profit after taxation

(132)

5

(6)

(70)

-

(203)

Total assets iv

3,767

277

1

1,546

(1,226)

4,365

Total liabilities

(1,940)

(185)

(48)

(36)

1,226

(983)

Net assets

1,827

92

(47)

1,510

-

3,382

Share of net assets of equity accounted investments

28

-

-

-

-

28

Additions to property, plant, equipment and intangibles

109

2

-

-

-

111

 

Material non cash items - share-based payments

14

-

-

1

-

15

 

Notes to the accounts (continued)

 

2. Segmental analysis (continued)

 

Year ended 30 September 2013

PGM

Operations

Segment

$m

 

Evaluation

Segment

$m

 

Exploration

Segment

$m

 

 

Other

$m

Inter-

segment

Adjustments

$m

 

 

Total

$m

Revenue (external sales by product):

Platinum

1,055

-

-

-

-

1,055

Palladium

224

-

-

-

-

224

Gold

28

-

-

-

-

28

Rhodium

85

-

-

-

-

85

Ruthenium

13

-

-

-

-

13

Iridium

27

-

-

-

-

27

PGMs

1,432

-

-

-

-

1,432

Nickel

46

-

-

-

-

46

Copper

15

-

-

-

-

15

Chrome

27

-

-

-

-

27

1,520

-

-

-

-

1,520

 

Underlying i:

EBITDA / (LBITDA) ii

339

8

(4)

(22)

-

321

Depreciation, amortisation and impairment

(157)

-

-

-

-

(157)

Operating profit / (loss) ii

182

8

(4)

(22)

-

164

Finance income

13

-

-

14

(18)

9

Finance expenses

(25)

-

-

(12)

18

(19)

Share of profit of equity accounted investments

4

-

-

-

-

4

Profit / (loss) before taxation

174

8

(4)

(20)

-

158

Income tax expense

(27)

-

-

-

-

(27)

Underlying profit / (loss) after taxation

147

8

(4)

(20)

-

131

Special items (note 3) iii

68

-

-

(1)

-

67

Profit / (loss) after taxation

215

8

(4)

(21)

-

198

Total assets iv

3,899

276

-

1,603

(1,162)

4,616

Total liabilities

(1,909)

(187)

(42)

(30)

1,162

(1,006)

Net assets

1,990

89

(42)

1,573

-

3,610

Share of net assets of equity accounted investments

36

-

-

-

-

36

Additions to property, plant, equipment and intangibles

174

7

-

-

-

181

 

Material non cash items - share-based payments

13

-

-

1

-

14

Notes to the accounts (continued)

 

2. Segmental analysis (continued)

 

 

Revenue by destination is analysed by geographical area below:

 

Year ended

30 September

2014

$m

Year ended

30 September

2013

$m

The Americas

118

411

Asia

247

461

Europe

426

451

South Africa

174

197

965

1,520

 

The Group's revenue is all derived from the PGM Operations segment. This segment has two major customers who contributed 60% ($580 million) and 25% ($241 million) of revenue in the year (2013 - 62% ($937 million) and 30% ($459 million)).

 

Metal sales prices are based on market prices which are denominated in US Dollars. The majority of sales are also invoiced in US Dollars with the exception of certain sales in South Africa which are invoiced in South African Rand based on exchange rates determined in accordance with the contractual arrangements.

 

Non-current assets, excluding financial instruments, of $3,407 million (2013 - $3,446 million) are all situated in South Africa.

 

Footnotes:

 

i

Underlying results are based on reported results excluding the effect of special items as defined in note 3.

ii

(LBITDA) / EBITDA and operating (loss) / profit are the key profit measures used by management.

iii

The impairment of the HDSA receivable to the value of $80 million (2013 - $nil) is included under special items in the segmental analysis. The HDSA receivable forms part of the "Other" segment.

iv

The assets under "Other" include the HDSA receivable of $337 million (2013 - $399 million) and intercompany receivables of $1,226 million (2013 - $1,162 million).

 

Notes to the accounts (continued)

 

3. Special Items

 

'Special items' are those items of financial performance that the Group believes should be separately disclosed on the face of the income statement to assist in the understanding of the financial performance achieved by the Group and for consistency with prior years.

 

2014

$m

2013

$m

Operating loss:

(307)

(17)

- Strike related costs i

Idle fixed production costs

(287)

-

Security costs

(10)

-

Contractors' claims

(3)

-

Other costs

(7)

(7)

- Restructuring and reorganisation costs ii

-

(10)

Impairment of available for sale financial assets iii

(1)

(2)

Share of loss of equity accounted investments iv

(2)

-

Net finance (expenses) / income:

(62)

1

- Interest accrued from HDSA receivable v

18

17

- Foreign exchange gain on HDSA receivable v

-

1

- Impairment of HDSA loan receivable v

(80)

-

- Net change in fair value of settled cash flow hedges

-

7

- Unwinding fees relating to early settlement of interest rate swap

-

(14)

- Foreign exchange gain on holding Rights Issue proceeds received in advance

-

1

- Loss on forward exchange contracts in respect of Rights Issue

-

(11)

Loss on special items before taxation

(372)

(18)

Taxation related to special items (note 5)

128

85

Special (loss) /gain before non-controlling interest

(244)

67

Non-controlling interests

25

(10)

Special (loss) / gain for the year attributable to equity shareholders of Lonmin Plc

(219)

57

 

Footnotes:

 

i

Fixed production overheads incurred during the protected strike period for which there was no associated revenue and costs arising directly as a result of the strike action have been classified as special items. The total of these strike related costs amounted to $307 million. Idle fixed production costs incurred during the strike period amounted to $287 million. These costs largely consist of salaries, utility costs and depreciation. Additional security costs of $10 million were incurred. Costs relating to contractors not being able to fulfil their obligations as a result of the disruption amounted to $3 million. Other costs include legal, communication, medical and various other start-up costs incurred.

ii

These costs relate to the management restructuring exercise completed during 2013.

iii

The $1 million (2013 - $2 million) impairment of available for sale financial assets represents the loss in value below the original cost price of one of our investments.

iv

The Pandora Joint Venture was also impacted by the strike. These costs relate to idle production costs incurred for which there was no associated production output.

v

During the year ended 30 September 2010 the Group provided financing to assist Lexshell 806 Investments (Proprietary) Limited, a subsidiary of Shanduka Resources (Proprietary) Limited (Shanduka) to acquire a majority shareholding in Incwala, Lonmin's Black Economic Empowerment partner. This financing gave rise to foreign exchange movements and the accrual of interest. Refer to note 8 for details regarding the impairment of the HDSA receivable.

 

Notes to the accounts (continued)

 

4. Net finance expenses

 

 

2014

$m

2013

$m

Finance income:

26

9

- Interest receivable on cash and cash equivalents

6

1

- Dividend received from investment i

10

-

- Foreign exchange gains on net (debt) / cash ii

10

8

Finance expenses:

(28)

(19)

- Interest payable on bank loans and overdrafts

(19)

(11)

- Bank fees

(12)

(7)

- Unamortised bank fees realised on settlement of old loan facility

-

(3)

- Capitalised interest iii

13

11

- Unwinding of discount on provisions

(10)

(9)

Special items (note 3):

(62)

1

- Interest on HDSA receivable (note 8)

18

17

- Foreign exchange gain on HDSA receivable (note 8)

-

1

- Impairment of HDSA loan receivable (note 8)

(80)

-

- Net change in fair value of settled cash flow hedges

-

7

- Unwinding fees relating to early settlement of interest rate swap

-

(14)

- Foreign exchange gain on holding Rights Issue proceeds received in advance

-

1

- Loss on forward exchange contracts in respect of Rights Issue

-

(11)

Net finance expenses

(64)

(9)

 

Footnotes:

 

i

Dividends received relate to arrear dividends accruing from our investment in Petrozim Line (Private) Limited which were remitted during the year. The investment in Petrozim Line (Private) Limited has a $nil carrying value.

ii

Net (debt) / cash as defined by the Group comprises cash and cash equivalents, bank overdrafts repayable on demand and interest bearing loans and borrowings less unamortised bank fees, unless the unamortised bank fees relate to undrawn facilities in which case they are treated as other receivables.

iii

Interest expenses incurred have been capitalised on a Group basis to the extent that there is an appropriate qualifying asset. The weighted average interest rate used by the Group for capitalisation is 3.0% (2013 - 5.9%).

 

 

Notes to the accounts (continued)

 

5. Taxation

2014

$m

2013

$m

Current tax charge (excluding special items):

United Kingdom tax expense

-

-

Current tax expense at 22% (2013 - 23.5%) i

-

-

Less amount of the benefit arising from double tax relief available

-

-

Overseas current tax expense at 28% (2013 - 28%)

2

2

Corporate tax expense - current year

1

3

Adjustment in respect of prior years

1

(1)

Deferred tax charge (excluding special items):

Deferred tax expense - UK and overseas

3

25

Origination and reversal of temporary differences

3

26

Adjustment in respect of prior years

-

(1)

Tax credit on special items - UK and overseas (note 3):

(128)

(85)

Foreign exchange on current taxation ii

-

1

Foreign exchange on deferred taxation ii

(42)

(81)

Tax on special items impacting profit before tax

(86)

(5)

Actual tax credit

(123)

(58)

 

Tax charge excluding special items (note 3)

5

27

 

Effective tax rate

38%

(41%)

 

Effective tax rate excluding special items (note 3)

11%

17%

A reconciliation of the standard tax (credit) / charge to the actual tax credit was as follows:

2014

2014

2013

2013

%

$m

%

$m

Tax (credit) / charge on (loss) / profit at standard tax rate

28

(91)

28

39

Tax effect of:

- Unutilised losses iii

(2)

7

4

5

- Foreign exchange impacts on taxable profits

7

(21)

(17)

(23)

- Adjustment in respect of prior years

-

-

(1)

(2)

- Disallowed expenditure

(6)

19

1

1

- Expenses not subject to tax

(2)

5

5

7

Special items as defined above

13

(42)

(61)

(85)

Actual tax credit

38

(123)

(41)

(58)

 

The Group's primary operations are based in South Africa. The South African statutory tax rate is 28% (2013 - 28%). Lonmin Plc operates a branch in South Africa which is also subject to a tax rate of 28% on branch profits (2013 - 28%). The aggregated standard tax rate for the Group is 28% (2013 - 28%). The dividend withholding tax rate is 15% (2013 - 15%). Dividends payable by the South African companies to Lonmin Plc are subject to a 5% withholding tax benefitting from double taxation agreements.

Footnotes:

 

i

Effective from 1 April 2014 the United Kingdom tax rate changed from 23% to 21% and will change from 21% to 20% from 1 April 2015. This does not materially impact the Group's recognised deferred tax liabilities.

ii

Overseas tax charges are predominantly calculated based in Rand as required by the local authorities. As these subsidiaries' functional currency is US Dollar this leads to a variety of foreign exchange impacts being the retranslation of current and deferred tax balances and monetary assets, as well as other translation differences. The Rand denominated deferred tax balance in US Dollars at 30 September 2014 is $268 million (30 September 2013 - $388 million).

iii

Unutilised losses reflect losses generated in entities for which no deferred tax is provided as it is not thought probable that future profits can be generated against which a deferred tax asset could be offset or previously unrecognised losses utilised.

Notes to the accounts (continued)

 

6. (Loss) / earnings per share

 

(Loss) / earnings per share ((LPS) / EPS) has been calculated on the loss attributable to equity shareholders amounting to $188 million (2013 - profit of $166 million) using a weighted average number of 569,649,750 ordinary shares in issue (2013 - 532,130,347 ordinary shares).

 

Diluted (loss) / earnings per share is based on the weighted average number of ordinary shares in issue adjusted by dilutive outstanding share options in accordance with IAS 33 - Earnings Per Share. In the year to 30 September 2014 outstanding share options were anti-dilutive and so were excluded from diluted loss per share.

 

2014

2013

Loss for

the year

$m

 

Number of

shares

Per share

amount

cents

Profit for

the year

$m

 

Number of

shares

Per share

amount

cents

Basic (LPS) / EPS

(188)

569,649,750

(33.0)

166

532,130,347

31.2

Share option schemes

-

-

-

-

2,105,203

(0.1)

Diluted (LPS) / EPS

(188)

569,649,750

(33.0)

166

534,235,550

31.1

2014

2013

Profit for

the year

$m

 

Number of

shares

Per share

amount

cents

Profit for

the year

$m

 

Number of

shares

Per share

amount

cents

Underlying EPS

31

569,649,750

5.4

109

532,130,347

20.5

Share option schemes

-

5,917,508

-

-

2,105,203

(0.1)

Diluted Underlying EPS

31

575,567,258

5.4

109

534,235,550

20.4

 

Underlying earnings per share has been presented as the Directors consider it important to present the underlying results of the business. Underlying earnings per share is based on the earnings attributable to equity shareholders adjusted to exclude special items (as defined in note 3) as follows:

 

2014

2013

 

(Loss) /profit for

the year

$m

 

 

 

Number of

shares

 

 

Per share

amount

cents

 

 

Profit for

the year

$m

 

 

 

Number of

shares

 

 

Per share

amount

cents

Basic (LPS) / EPS

(188)

569,649,750

(33.0)

166

532,130,347

31.2

Special items (note 3)

219

-

38.4

(57)

-

(10.7)

Underlying EPS

31

569,649,750

5.4

109

532,130,347

20.5

 

 

Notes to the accounts (continued)

 

6. (Loss) / earnings per share (continued)

 

Headline (loss) / earnings and the resultant headline (loss) / earnings per share are specific disclosures defined and required by the Johannesburg Stock Exchange. These are calculated as follows:

 

Year ended

30 September 2014

$m

Year ended

30 September

 2013

$m

(Loss) / earnings attributable to ordinary shareholders (IAS 33 earnings)

(188)

166

Add back loss on disposal of property, plant and equipment

-

5

Add back impairment of assets (note 3)

1

2

Tax related to the above items

-

(1)

Non-controlling interests

-

(1)

Headline (loss) / earnings

(187)

171

 

2014

2013

Loss for

the year $m

 

Number of

shares

Per share

amount

cents

Profit for

the year $m

 

Number of

shares

Per share

amount

cents

Headline (LPS) / EPS

(187)

569,649,750

(32.8)

171

532,130,347

32.1

Share option schemes

-

-

-

-

2,105,203

(0.1)

Diluted Headline (LPS) / EPS

(187)

569,649,750

(32.8)

171

534,235,550

32.0

Notes to the accounts (continued)

 

7. Dividends

 

No dividends were declared by Lonmin Plc for the financial years ended 30 September 2014 and 30 September 2013.

 

A subsidiary of Lonmin Plc, WPL, made advance dividend payments of $37 million (R408 million) (2013 - $11 million (R110 million)) to Incwala Platinum (Proprietary) Limited (IP). IP is a substantial shareholder in the Company's principal operating subsidiaries. Total advance dividends made between 2009 and 2014 amount to R901 million. IP has authorised WPL to recover these amounts by reducing future dividends that would otherwise be payable to all shareholders.

 

 

8. Other financial assets

 

Restricted cash

Available for sale

HDSA receivable

Total

$m

$m

$m

$m

At 1 October 2013

14

17

399

430

Interest accrued

1

-

18

19

Movement in fair value

-

(1)

-

(1)

Foreign exchange differences

(3)

-

-

(3)

Impairment loss

-

(1)

(80)

(81)

At 30 September 2014

12

15

337

364

 

 

Restricted cash

Available

for sale

HDSA receivable

Total

$m

$m

$m

$m

At 1 October 2012

18

19

381

418

Interest accrued

1

-

17

18

Foreign exchange differences

(5)

-

1

(4)

Impairment loss

-

(2)

-

(2)

At 30 September 2013

14

17

399

430

 

2014

$m

2013

$m

Current assets

Other financial assets

337

-

 

Non-current assets

Other financial assets

27

430

 

Restricted cash deposits are in respect of rehabilitation obligations.

Available for sale financial assets include listed investments of $11 million (2013 - $13 million) held at fair value using the market price on 30 September 2014.

 

The $1 million (2013 - $2 million) impairment of available for sale financial assets represents the loss in value below the original cost price of one of our investments.

 

On 8 July 2010, Lonmin entered into an agreement to provide financing of £200 million to Lexshell 806 Investments (Proprietary) Limited, a subsidiary of Shanduka Resources (Proprietary) Limited, to facilitate the acquisition, at fair value, of 50.03% of shares in Incwala Resources (Proprietary) Limited from the original HDSA shareholders. The terms of the financing provided by Lonmin Plc to the Shanduka subsidiary include the accrual of interest on the HDSA receivable at fixed rates based on a principal value of £200 million which is repayable after 5 years including accrued interest, or earlier at the Shanduka subsidiary's discretion. The HDSA receivable is repayable on 8 July 2015.

Notes to the accounts (continued)

 

8. Other financial assets (continued)

 

The HDSA receivable is secured on shares in the HDSA borrower, Lexshell 806 Investments (Proprietary) Limited, a subsidiary of Shanduka Resources (Proprietary) Limited. The HDSA borrower's only asset of value is its ultimate shareholding in Incwala. As Incwala's principal assets are investments in WPL, EPL and Akanani, all subsidiaries of Lonmin Plc, the value in use models for the Marikana and Akanani CGU's as described in note 10 are applied to determine the value of Incwala and in turn, the value of the HDSA borrower (the security). The value of the security is $337 million at 30 September 2014. Key assumptions to the value in use models are described in note 10. At 31 March 2014, the carrying amount of the HDSA receivable was impaired by $160 million to bring it down to its recoverable amount. The impairment review performed at 30 September 2014 resulted in an impairment reversal of $80 million largely as a result of the weaker Rand and improved metal price assumptions applied to the valuation models. Any movements in the key assumptions would affect the value of the security which would lead to further impairment or reversal of previous impairment of the receivable as follows:

 

Reversal of impairment /

Assumption

Movement in assumption

(further impairment) of the receivable

Metal prices

+/- 5%

$61 m / ($61 m)

ZAR:USD exchange rate

+/- 5%

$42 m / ($47 m)

Discount rates

-/+ 100 basis points

$46 m / ($39 m)

Production

+/- 5%

$60 m / ($61 m)

 

 

Notes to the Accounts (continued)

 

9. Net (debt) / cash as defined by the Group

 

 

As at

1 October

2013

$m

 

 

 

Cash flow

$m

Foreign exchange and non cash

movements

$m

Transfer of unmortised bank fees to other receivables

$m

As at

30 September

2014

$m

 

Cash and cash equivalents

201

(71)

13

-

143

Current borrowings

-

(87)

-

-

(87)

Non-current borrowings

-

(88)

-

-

(88)

Unamortised bank fees ii

-

-

-

3

3

Net cash / (debt) as defined by the Group i

201

(246)

13

 

3

(29)

 

 

 

As at

1 October

2012

$m

 

 

Cash

flow

$m

Foreign

exchange and

non cash

movements

$m

Transfer of unmortised bank fees to other receivables

$m

 

As at

30 September

2013

$m

Cash and cash equivalents

315

(127)

13

-

201

Current borrowings

(123)

123

-

-

-

Non-current borrowings

(619)

619

-

-

-

Unamortised bank fees ii

6

(3)

2

(5)

-

Net (debt) / cash as defined by the Group i

(421)

612

15

 

(5)

201

 

Footnotes:

 

i

Net (debt) / cash as defined by the Group comprises cash and cash equivalents, bank overdrafts repayable on demand and interest bearing loans and borrowings less unamortised bank fees, unless the unamortised bank fees relate to undrawn facilities in which case they are treated as other receivables.

ii

As at 30 September 2014 unamortised bank fees of $3 million relating to drawn facilities were offset against net debt (30 September 2013 - $5 million of unamortised bank fees relating to undrawn facilities were included in other receivables).

 

Notes to the Accounts (continued)

 

10. Impairment of Non-financial assets (excluding Inventories and deferred tax)

 

The Group's principal non-financial assets (excluding inventories and deferred tax assets) are property, plant and equipment, intangibles and goodwill associated with mining and processing activities. For the purpose of assessing recoverable amount, these assets are grouped into cash generating units (CGUs). The Group's two key CGU's are:

- Marikana, which includes Western Platinum Limited (WPL) and Eastern Platinum Limited (EPL). The Marikana CGU mines and processes substantially all of the ore produced by the Group; and

- Akanani Mining (Proprietary) Limited (Akanani), an exploration and evaluation asset located on the Northern Limb of the Bushveld Complex in South Africa.

 

Recoverable amount is the higher of fair value less costs to sell and value in use. At each financial reporting date, the Group assesses whether there is any indication that those assets are impaired. If any such indication exists, the recoverable amount of the assets is estimated in order to determine the extent of the impairment (if any).

 

Goodwill and intangible assets with an indefinite useful life are tested for impairment annually regardless of whether an indication of impairment exists.

Items of property, plant and equipment that are not in use are reviewed annually for impairment on a fair value less costs to sell basis.

 

If the recoverable amount of an asset (or CGU) is estimated to be less than its carrying amount, the carrying amount of the asset (or CGU) is reduced to its recoverable amount. Any impairment is recognised immediately as an expense.

Value in use

In assessing value in use, the estimated future cash flows, based on the most up to date business forecasts or studies for exploration and evaluation assets, are discounted to their present value using a pre-tax discount rate that reflects current market assessments of the time value of money and the risks specific to the assets for which estimates of future cash flows have not been adjusted.

The key assumptions contained within the business forecasts and management's approach to determine appropriate values are set out below:

 

Key Assumption

Management Approach

PGM prices

Projections are determined through a combination of the views of the Directors, market estimates and forecasts and other sector information. The Platinum price is projected to be in the range of $1,545 to $2,035 (2013: $1,600 to $2,100) per ounce in real terms over the life of the mines. Palladium and Rhodium prices are expected to range between $859 and $1,290 (2013: $750 to $1,200) and $1,372 and $2,531 (2013: $1,000 to $2,000) respectively per ounce in real terms over the same period.

Production volume

Projections are based on the capacity and expected operational capabilities of the mines, the grade of the ore, and the efficiencies of processing and refining operations.

Production costs

Projections are based on current cost adjusted for expected cost changes as well as giving consideration to specific issues such as the difficulty in mining particular sections of the reef and the mining method employed.

Capital expenditure requirements

Projections are based on the operational plan, which sets out the long-term plan of the business and is approved by the Board.

Foreign currency exchange rates

Spot rates as at the end of the reporting period are applied.

Reserves and resources of the CGU

Projections are determined through surveys performed by Competent Persons and the views of the Directors of the Company.

 

Management uses past experience and assessment of future conditions, together with external sources of information in order to assign values to the key assumptions.

 

 

Notes to the Accounts (continued)

 

10. Impairment of Non-financial assets (excluding Inventories and deferred tax) (continued)

 

Management has projected cash flows over the life of the relevant mining operation which is significantly greater than 5 years.

For the Marikana CGU a life of mine spanning until 2058 was applied. For the Akanani CGU the life of mine spans until 2049.

Projecting cash flows over a period longer than 5 years is in line with industry practice and is supported by the Group's history of the resources expected to be found being proven to exist. Management does not apply a growth rate because a detailed life of mine plan is used to forecast future production volumes.

 

For each CGU a risk-adjusted pre-tax discount rate is used for impairment testing. The key factors affecting the risk premium applied are the relevant stage of the development of the asset in the CGU (extensions to existing operations having significantly lower risk than evaluation projects for example), the level of knowledge and consistency of the ore body and sovereign risk. The rate applied in the Marikana CGU for 2014 was 11.8% real (2013 - 11.8% real). The rate applied for the exploration and evaluation asset in the Akanani CGU for 2014 was 16.5% nominal (2013 - 14.8% nominal).

 

In preparing the financial statements, management has considered whether a reasonably possible change in the key assumptions on which management has based its determination of the recoverable amounts of the CGUs would cause the units' carrying amounts to exceed their recoverable amounts. For the Marikana CGU management do not believe that a reasonably possible change in any of the key assumptions would lead to impairment. The Akanani CGU was impaired in 2012, and as such a change to any of the key assumptions would lead to further impairment or reversal of the previous impairment. The approximate effects on impairment of the Akanani CGU of movements in three key assumptions would be as follows:

 

Assumption

Movement in assumption

Reversal of impairment/(Further impairment)

Metal prices

+/-5%

$37m/($28m)

ZAR:USD exchange rate

+/-5%

$31m/($25m)

Discount rates

-/+ 100 basis points

$73m/($51m)

 

Fair value less costs to sell

Fair value less costs to sell has been determined by reference to the best information available to reflect the amount that the Group could receive for the CGU in an arm's length transaction.

 

When comparable market transactions or public valuations of similar assets exist these are used as a source of evidence. However, the Group believes that mining CGUs tend to be unique and have their value determined largely by the nature of the underlying ore body. The fair value therefore is typically determined by calculating the value of the CGU using an appropriate valuation methodology such as calculating the post-tax net present value using a discounted cash flow forecast (as described in value in use).

 

Exploration and evaluation assets

Under IFRS 6 exploration and evaluation assets are assessed for impairment when facts and circumstances suggest that the carrying amount of the assets may exceed their recoverable amount. When this occurs, any impairment loss is immediately charged to the income statement.

 

Akanani exploration and evaluation asset

The Akanani CGU is currently at pre-feasibility study level and value in use calculations for the CGU are calculated using cash flows derived from the results of the latest study. Given the Akanani CGU is at the exploration and evaluation stage it is reasonably possible that the completion of that stage will result in changes to indicated and inferred reserves of PGM ounces and a further refinement of capital and operating expenses. In addition the quantity of resources is also sensitive to the long-term metal prices. Adverse changes in reserves and resources, capital and operating expenses, and long-term metal prices might cause the recoverable amount to fall below the carrying amount of the CGU. As mentioned above, the Akanani CGU was impaired in 2012, and given any reasonably possible change in assumptions could have an impact on the carrying amount, a formal impairment assessment was performed again in 2014.

 

 

 

Notes to the Accounts (continued)

 

10. Impairment of Non-financial assets (excluding Inventories and deferred tax) (continued)

 

Goodwill

The recoverable amount of goodwill, as allocated to relevant CGUs, has been tested for impairment annually, or when such events or changes in circumstances indicate that it may be impaired.

 

Any impairment is recognised immediately in the income statement.

 

Impairment losses within a CGU are allocated first to goodwill and then to reduce the carrying amounts of the other assets in the unit on a pro-rata basis.

 

Reversal of impairment

At each financial reporting date, the Group assesses whether there is any indication that a previously recognised impairment loss has reversed. An impairment loss is reversed if there has been a change in the estimates used to determine the recoverable amount. An impairment loss is only reversed to the extent that the asset's carrying amount does not exceed the carrying amount that would have been determined, net of depreciation and amortisation, had the impairment not been made. A reversal of impairment is recognised as income immediately except for previously impaired goodwill which is never reversed.

 

 

11. Events after the financial reporting period

 

The Company is required to increase HDSA ownership in its prospecting and mining ventures by 31 December 2014 from its current holding of 18% to at least 26% as required under the Mining Charter.

 

As flagged to shareholders in the regulatory release of July 2014, Lonmin announced that it had entered into binding agreements with the Bapo ba Mogale Traditional Community (the Bapo) in relation to a series of transactions which will enable Lonmin to meet its Black Economic Empowerment (BEE) targets. Lonmin also stated its intention to implement an Employee Share Ownership Plan (ESOP) and a Community Share Ownership Trust (CSOT) (for the benefit of the local communities on the western portion of our Marikana operations). All three transactions will collectively provide the additional 8% equity empowerment which Lonmin requires to achieve the 26% effective BEE equity ownership target by 31 December 2014.

 

Bapo Transaction

The Bapo Transaction involved a royalty for equity swap and the sale of the Bapo 7.5% stake in the Pandora Joint Venture to a Lonmin subsidiary. This transaction provided the Bapo Community with equity participation of circa 2.25% at Plc level, a deferred royalty payment of R20 million per annum payable by Lonplats (Eastern and Western Platinum combined) in each of the five years following completion of the transaction, and a minimum procurement spend of R200 million over the 18 months following the completion of the transaction. Whilst binding legal agreements were signed in July 2014, two conditions precedent remain to be satisfied and are expected to be satisfied during November 2014 at which stage the transaction will be complete and implemented. Certain members of the Bapo Community have indicated that they may institute legal action challenging, amongst other things, the authority of the Bapo to enter into this transaction. These threats to institute legal action have not been acted upon at this stage.

 

Employee Share Ownership Plan

Whilst engagements between Lonmin and unions continue as regards the nature of the ESOP to be implemented at Lonmin, the likelihood is that the ESOP proposed by Lonmin (which is based on a profit-sharing scheme) will be implemented before the end of 2014. The ESOP will result in economic partnership and ownership by our employees and sharing the responsibilities and involvement that this ownership brings. This implementation will ensure that Lonmin receives HDSA equity accreditation of 3.8%. However, the intention is that the parties continue to engage on the details of the ESOP even post implementation so that it is capable of future amendment should it be in the interests of Lonmin and its employees to do so.

 

Community Trusts

Two separate community trusts are being established - one for the Bapo Community and other for the communities on

 

 

Notes to the Accounts (continued)

 

the western side of our operations. Each community trust will hold Lonplats shares and will be entitled to dividend payments to be used for the upliftment of the respective communities. To the extent that the dividend payable in a particular year is less than R5 million, each community trust will be entitled to a minimum annual payment of R5 million escalating in line with CPI each year. The two community trusts will entitle Lonmin to an HDSA equity accreditation of 1.8%.

 

At this stage, the Company expects that completion of all of these arrangements should be achieved by 31 December 2014.

 

12. Statutory Disclosure

 

The financial information set out above does not constitute the Company's statutory accounts for the years ended 30 September 2014 and 2013 but is derived from those accounts. Statutory accounts for 2013 have been delivered to the Registrar of Companies, and those for 2014 will be delivered in due course. The auditors have reported on those accounts; their report was (i) unqualified, (ii) did not include a reference to any matters to which the auditors drew attention by way of emphasis without qualifying their report and (iii) did not contain a statement under Section 498 (2) or (3) of the Companies Act 2006.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
FR FSIEEUFLSEFF

Related Shares:

Lonmin
FTSE 100 Latest
Value8,684.56
Change50.81