15th Jan 2015 07:00
Bacanora Minerals Ltd.
("Bacanora" or the "Company")
Buenavista Drilling Results
Bacanora is pleased to announce that it has received drilling results from all of the 24 reverse circulation drill holes that were completed on the southern half of the Buenavista concession in December. The Buenavista concession forms part of the lands held by Megalit S.A. de C.V. ("Megalit") which is 70 per cent. owned by Bacanora and 30 per cent. owned by Rare Earth Minerals PLC ("REM"). Megalit is part of the Sonora lithium project (the "Sonora Lithium Project").
Drill Programme Highlights:
· three kilometres of strike length of the lithium-bearing clays on the southern half of the concession were tested. The three kilometres on the northern half of the concession, as well as portions of the strata that continue onto the adjoining Megalit concession, remain untested;
· significant lithium values (i.e. greater than 1,000 ppm Li) were found in 13 of the 24 holes;
· of those 13 holes, 11 reported significant thicknesses and grades of lithium-bearing clays, as tabulated below;
· lithium values of individual 1.0 metre samples, within the significant intervals, range from 336 to 2,210 ppm Li; and
· the lithium-bearing clays crop out at surface and dip gently to the east, providing a target for potential low strip ratio, open pit mining of the clays.
Buenavista Concession - Drill Holes with Significant Li Intervals
HOLE_ID | From (m) | To (m) | Interval (m) | Li (ppm) Weighted Ave. | LCE1 % |
BV-01 | 29 | 41 | 12 | 1,421 | 0.76 |
BV-02 | 8 | 14 | 6 | 1,057 | 0.56 |
BV-02 | 23 | 26 | 3 | 1,107 | 0.59 |
BV-03 | 6 | 16 | 10 | 1,043 | 0.56 |
BV-06 | 18 | 33 | 15 | 1,032 | 0.55 |
BV-08 | 14 | 35 | 21 | 1,118 | 0.60 |
BV-09 | 13 | 36 | 23 | 1,077 | 0.57 |
BV-10 | 15 | 39 | 24 | 1,107 | 0.59 |
BV-18 | 17 | 39 | 22 | 1,063 | 0.57 |
BV-19 | 15 | 31 | 16 | 1,035 | 0.55 |
BV-20 | 28 | 40 | 12 | 1,277 | 0.68 |
BV-23 | 26 | 30 | 4 | 1,018 | 0.54 |
Management is currently assessing these results to determine if further drilling is required on the northern portion of Buenavista and adjoining concessions. Management anticipates that if it is determined that additional drilling is warranted and is subsequently conducted, it would then be in a position to prepare an NI 43-101 resource statement for the Buenavista and adjoining concessions.
Colin Orr-Ewing, Chairman of Bacanora, commented:
"We are very pleased with the rapid progress made in discovering and testing these additional lithium deposits in the Sonora Lithium Project. These results have confirmed that significant thicknesses and grades of lithium-bearing clays occur within the southern part of Buenavista. The northern half of the concession remains untested and it is our belief that it holds potential for similar lithium mineralisation. Considering the relatively low overburden and that the deposit is at surface, if commercialised, this concession could present a low cost mining operation.Jointly, both of these areas could add further resources to what is already a major lithium deposit, as well as increase confidence that Sonora represents a world class lithium asset."
Carl G. Verley, P.Geo. is the Qualified Person pursuant to National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and the AIM Note for Mining and Oil and Gas Companies that has reviewed and approved the technical contents of this news release.
Enquiries please contact:
|
|
Bacanora Minerals Colin Orr-Ewing, Non-Executive Chairman Shane Shircliff, CEO
|
+44 (0) 20 3696 2410 +1 (403) 237 6122 |
Cairn Financial Advisers LLP, Nomad Sandy Jamieson / Liam Murray
|
+44 (0) 20 7148 7900 |
HD Capital Partners LLP, Broker Philip Haydn-Slater / Paul Dudley
|
+44 (0) 20 3551 4870 |
Buchanan, Financial PR Adviser Bobby Morse / Gordon Poole / Jason Day |
+44 (0) 20 7466 5000 |
ABOUT BACANORA:
Bacanora is a Canadian and London listed minerals explorer (TSX-V: BCN and AIM: BCN). The Company explores and develops industrial mineral projects, with a primary focus on lithium and borates. The Company's operations are based in Hermosillo in northern Mexico and it currently has two significant projects under development in the state of Sonora. The two main assets of Bacanora are:
· The Sonora Lithium Project which consists of ten mining concession areas covering 104,064 hectares in the north east of Sonora state. The Company, through drilling work to date, has established an NI 43-101 compliant indicated resource of 3.28 million tonnes ("mt") of lithium carbonate equivalent ("LCE") at a 2,000 ppm cut-off grade. The Company's 100 per cent. owned La Ventana deposit, which lies within the Sonora Lithium Project, hosts an NI 43-101 compliant drill Indicated lithium resource of 1.27 mt of LCE; and
· The Magdalena borate project, covering 16,503 hectares in Sonora state, Mexico, where the Company's main borate zone, El Cajon, has an NI 43-101 compliant indicated resource of 1.17 mt of B2O3, at an eight per cent. cut-off grade. The Company has completed a number of measures to determine the geological and commercial potential of the project and is undertaking a pre-feasibility exercise to determine the economic benefit of developing the mine and constructing a processing plant on site in order to become a supplier of boric acid.
1 LCE = lithium carbonate (Li2CO3) Equivalent: determined by multiplying Li value in percent by 5.324
to get an equivalent Li2CO3 value in percent.
Related Shares:
BCN.L