Become a Member
  • Track your favourite stocks
  • Create & monitor portfolios
  • Daily portfolio value
Sign Up
Quickpicks
Add shares to your
quickpicks to
display them here!

BHP Billiton Production Report 31 March 2013

17th Apr 2013 07:00

RNS Number : 5225C
BHP Billiton PLC
16 April 2013
 



NEWS RELEASE

Release Time

IMMEDIATE

Date

17 April 2013

Number

05/13

 

BHP BILLITON PRODUCTION REPORT FOR THE NINE MONTHS ENDED 31 MARCH 2013

 

§ Full year production guidance is retained for our major businesses following another quarter of robust operating performance.

 

§ Western Australia Iron Ore achieved record production for the nine month period ended March 2013. Production guidance of 183 million tonnes (100% basis) for the 2013 financial year remains unchanged, despite cyclone related downtime during the period. An annualised production rate approaching 200 million tonnes (100% basis) is anticipated for the June 2013 quarter.

 

§ Onshore US produced more than five million barrels of liquids during the March 2013 quarter and the Eagle Ford is now our single largest liquids producing field. Petroleum production guidance for the 2013 financial year remains unchanged at approximately 240 million barrels of oil equivalent.

 

§ Copper in concentrate production at Escondida increased by 61% during the nine month period ended March 2013. Total Escondida copper production remains on track to increase by at least 20% in the 2013 financial year.

 

§ Queensland Coal production was affected by adverse weather conditions during the March 2013 quarter. However, recently installed flood mitigation infrastructure enabled a rapid recovery in performance and the business was operating at full supply chain capacity at the end of the period.

 

Petroleum

MAR2013YTD

MAR2013QTR

MAR YTD13 vsMAR YTD12

MAR Q13vsMAR Q12

MAR Q13vsDEC Q12

Crude oil, condensate and natural gas liquids ('000 boe)

66,610

20,871

1%

-4%

-10%

Natural gas (bcf)

659.78

207.27

10%

-1%

-6%

Total petroleum products (million boe)

176.57

55.42

6%

-2%

-7%

 

Total petroleum production - An average production rate of 644 thousand barrels of oil equivalent per day was achieved during the nine month period ended March 2013. Guidance for the 2013 financial year remains unchanged at approximately 240 million barrels of oil equivalent.

 

Crude oil, condensate and natural gas liquids - A 15 per cent increase in liquids production at our Onshore US business during the March 2013 quarter partially offset cyclone related downtime at our Western Australian operations, extended maintenance and drilling delays at our non-operated facilities in the Gulf of Mexico (US) and natural field decline.

 

Onshore US produced more than five million barrels of liquids during the March 2013 quarter and the Eagle Ford is now our single largest liquids producing field. These record volumes are expected to grow further in the June 2013 quarter as additional wells come online and infrastructure projects are completed.

 

Natural gas - A reduction in gas production in the March 2013 quarter reflected lower levels of drilling activity in our dry gas Haynesville and Fayetteville fields (US) and a seasonal reduction in natural gas demand at Bass Strait (Australia).

 

Aluminium and Nickel

MAR2013YTD

MAR2013QTR

MAR YTD13 vsMAR YTD12

MAR Q13vsMAR Q12

MAR Q13vsDEC Q12

Alumina ('000 tonnes)

3,615

1,213

16%

15%

-2%

Aluminium ('000 tonnes)

871

304

-4%

10%

2%

Nickel ('000 tonnes)

113.8

42.1

-1%

1%

21%

 

Alumina - The continued ramp up of the Efficiency and Growth project at Worsley (Australia) contributed to record alumina production for the nine month period ended March 2013.

 

Aluminium - An increase in metal production from the March 2012 quarter reflected a return to full technical capacity at Hillside (South Africa).

 

Nickel - Nickel production increased by 21 per cent from the December 2012 quarter as the Nickel West smelter and refinery (Australia) returned to full capacity following the successful completion of planned maintenance in the prior period. Total nickel production was further supported by strong performance at Cerro Matoso (Colombia).

 

Base Metals

MAR2013YTD

MAR2013QTR

MAR YTD13 vsMAR YTD12

MAR Q13vsMAR Q12

MAR Q13vsDEC Q12

Copper ('000 tonnes)

876.2

307.1

12%

9%

4%

Lead (tonnes)

147,398

49,080

-16%

-8%

6%

Zinc (tonnes)

82,324

30,193

1%

2%

15%

Silver ('000 ounces)

26,565

8,843

-11%

-9%

3%

Uranium oxide concentrate (Uranium) (tonnes)

2,989

933

7%

4%

-8%

 

Copper - Copper in concentrate production at Escondida (Chile) increased by 61 per cent during the nine month period ended March 2013. Production benefited from an increase in the average copper grade mined to 1.4 per cent. Total Escondida copper production remains on track to increase by at least 20 per cent in the 2013 financial year.

 

Antamina (Peru) achieved record production for the nine month period ended March 2013, despite a temporary reduction in the copper to zinc ore grade ratio during the recent quarter. Olympic Dam (Australia) production increased by 42 per cent in the March 2013 quarter following the completion of major planned maintenance in the prior period.

 

Lead/silver - Lead and silver production decreased at Cannington (Australia) during the nine month period ended March 2013 due to lower average ore grades.

 

Zinc - Production increased by 15 per cent from the December 2012 quarter and reflected a temporary increase in the grade profile at Antamina.

 

Uranium - Uranium production increased by seven per cent during the nine month period ended March 2013 due to higher recoveries and increased plant availability at Olympic Dam.

 

Diamonds and Specialty Products

MAR2013YTD

MAR2013QTR

MAR YTD13 vsMAR YTD12

MAR Q13vsMAR Q12

MAR Q13vsDEC Q12

Diamonds ('000 carats)

930

322

-32%

-26%

9%

 

Diamonds - On 10 April 2013, BHP Billiton completed the sale of its diamonds business, comprising its interests in the EKATI Diamond Mine and Diamonds Marketing operations, to Dominion Diamond Corporation for an aggregate cash consideration of US$553 million (after adjustments).

 

Iron Ore

MAR2013YTD

MAR2013QTR

MAR YTD13 vsMAR YTD12

MAR Q13vsMAR Q12

MAR Q13vsDEC Q12

Iron ore ('000 tonnes)

122,167

40,205

3%

6%

-5%

 

Iron ore - Western Australia Iron Ore (WAIO) achieved record production for the nine month period ended March 2013. Production guidance of 183 million tonnes (100 per cent basis) for the 2013 financial year remains unchanged, despite cyclone related downtime during the period. An annualised production rate approaching 200 million tonnes (100 per cent basis) is anticipated for the June 2013 quarter.

 

The Jimblebar Mine Expansion is on schedule for first production in the March 2014 quarter and will broadly match mine and port capacity at 220 million tonnes per annum (100 per cent basis). The progressive debottlenecking of the supply chain is expected to underpin substantial low cost, longer term growth in our WAIO business.

 

Samarco (Brazil) continued to operate at capacity during the March 2013 quarter.

 

Manganese

MAR2013YTD

MAR2013QTR

MAR YTD13 vsMAR YTD12

MAR Q13vsMAR Q12

MAR Q13vsDEC Q12

Manganese ore ('000 tonnes)

6,271

2,008

7%

-2%

-5%

Manganese alloy ('000 tonnes)

426

143

-19%

4%

-7%

 

Manganese ore - Record ore production for the nine month period ended March 2013 reflected a substantial improvement in plant availability at GEMCO (Australia), the world's largest and lowest cost manganese operation.

 

Manganese alloy - The decrease in alloy volumes during the nine month period ended March 2013 was largely attributable to the permanent closure of energy intensive silicomanganese production at Metalloys (South Africa) in January 2012.

 

Metallurgical Coal

MAR 2013 YTD

MAR 2013 QTR

MAR YTD13 vs MAR YTD12

MAR Q13 vs MAR Q12

MAR Q13 vs DEC Q12

Metallurgical coal ('000 tonnes)

26,792

8,966

7%

22%

1%

 

Metallurgical coal - Queensland Coal (Australia) production was affected by adverse weather conditions during the March 2013 quarter. However, recently installed flood mitigation infrastructure enabled a rapid recovery in performance and the business was operating at full supply chain capacity at the end of the period. South Walker Creek achieved record quarterly production following the completion of a wash plant upgrade in the prior period.

 

Our Queensland Coal operations achieved a significant milestone during the quarter with first production achieved at the Daunia mine, ahead of schedule. The ramp up of this mine and future commissioning of Caval Ridge will underpin an increase in the capacity of our Queensland Coal business to 66 million tonnes per annum (100 per cent basis) by the end of the 2014 calendar year.

 

A planned longwall move at the Dendrobium mine resulted in lower production at Illawarra Coal (Australia) in the March 2013 quarter. A longwall move is scheduled at the West Cliff mine during the June 2013 quarter.

 

Energy Coal

MAR 2013 YTD

MAR 2013 QTR

MAR YTD13 vs MAR YTD12

MAR Q13 vs MAR Q12

MAR Q13 vs DEC Q12

Energy coal ('000 tonnes)

53,349

15,486

1%

-10%

-15%

 

Energy coal - New South Wales Energy Coal (Australia) continued to benefit from the ramp up of the RX1 project with record production achieved for the nine month period ended March 2013. Production in the March 2013 quarter was affected by adverse weather conditions on the east coast of Australia and industrial action at Cerrejon Coal (Colombia) that preceded successful resolution of a new three year Enterprise Agreement.

 

This report, together with the Exploration and Development Report, represents the Interim Management Statement for the purposes of the UK Listing Authority's Disclosure and Transparency Rules. There have been no significant changes in the financial position of the Group in the quarter ended 31 March 2013.

 

Further information on BHP Billiton can be found at: www.bhpbilliton.com

 

Media Relations

 

Australia

 

Gabrielle Notley

Tel: +61 3 9609 3830 Mobile: +61 477 325 803

email: [email protected]

 

Fiona Hadley

Tel: +61 3 9609 2211 Mobile: +61 427 777 908

email: [email protected]

 

Eleanor Nichols

Tel: +61 3 9609 2360 Mobile: +61 407 064 748

email: [email protected]

 

United Kingdom

 

Ruban Yogarajah

Tel: +44 20 7802 4033 Mobile: +44 7827 082 022

email: [email protected]

 

Jennifer White

Tel: +44 20 7802 7462 Mobile: +44 7827 253 764

email: [email protected]

 

Americas

 

Jaryl Strong

Tel: +1 713 499 5548 Mobile: +1 281 222 6627

email: [email protected]

 

Investor Relations

 

Australia

 

James Agar

Tel: +61 3 9609 2222 Mobile: +61 467 807 064

email: [email protected]

 

Andrew Gunn

Tel: +61 3 9609 3575 Mobile: +61 402 087 354

email: [email protected]

 

United Kingdom and South Africa

 

Tara Dines

Tel: +44 20 7802 7113 Mobile: +44 7825 342 232

Email: [email protected]

 

Americas

 

Brendan Harris

Tel: +44 20 7802 4131 Mobile: +44 7990 527 726

email: [email protected]

 

Matt Chism

Tel: +1 71 359 96158 Mobile: +1 281 782 2238

email: [email protected]

 

 

BHP Billiton Limited ABN 49 004 028 077

Registered in Australia

Registered Office: 180 Lonsdale Street

Melbourne Victoria 3000 Australia

Tel +61 1300 55 4757 Fax +61 3 9609 3015

 

 

BHP Billiton Plc Registration number 3196209

Registered in England and Wales

Registered Office: Neathouse Place

London SW1V 1BH United Kingdom

Tel +44 20 7802 4000 Fax +44 20 7802 4111

 

Members of the BHP Billiton Group which is headquartered in Australia

 

 

BHP BILLITON PRODUCTION SUMMARY

QUARTER ENDED

YEAR TO DATE

% CHANGE

MAR YTD13

MAR Q13

MAR Q13

MAR

DEC

MAR

MAR

MAR

vs

vs

vs

2012

2012

2013

2013

2012

MAR YTD12

MAR Q12

DEC Q12

PETROLEUM

Crude oil & condensate

('000 bbl)

18,127

19,228

16,689

53,953

55,475

-3%

-8%

-13%

Natural gas

(bcf)

209.17

219.66

207.27

659.78

601.01

10%

-1%

-6%

NGL

('000 boe)

3,609

4,064

4,182

12,657

10,327

23%

16%

3%

Total petroleum products

(million boe)

56.60

59.90

55.42

176.57

165.98

6%

-2%

-7%

ALUMINIUM AND NICKEL

Alumina

('000 tonnes)

1,052

1,232

1,213

3,615

3,113

16%

15%

-2%

Aluminium

('000 tonnes)

277

297

304

871

905

-4%

10%

2%

Nickel

('000 tonnes)

41.7

34.7

42.1

113.8

115.2

-1%

1%

21%

BASE METALS

Copper

('000 tonnes)

281.4

295.2

307.1

876.2

782.0

12%

9%

4%

Lead

(tonnes)

53,560

46,135

49,080

147,398

176,211

-16%

-8%

6%

Zinc

(tonnes)

29,727

26,209

30,193

82,324

81,469

1%

2%

15%

Gold

(ounces)

44,684

38,092

42,076

112,604

128,130

-12%

-6%

10%

Silver

('000 ounces)

9,715

8,557

8,843

26,565

29,769

-11%

-9%

3%

Uranium oxide concentrate

(tonnes)

896

1,014

933

2,989

2,805

7%

4%

-8%

Molybdenum

(tonnes)

521

410

321

1,185

1,882

-37%

-38%

-22%

DIAMONDS AND SPECIALTY PRODUCTS

Diamonds

('000 carats)

433

295

322

930

1,371

-32%

-26%

9%

IRON ORE

Iron ore

('000 tonnes)

37,943

42,190

40,205

122,167

118,587

3%

6%

-5%

MANGANESE

Manganese ore

('000 tonnes)

2,040

2,117

2,008

6,271

5,865

7%

-2%

-5%

Manganese alloy

('000 tonnes)

138

153

143

426

527

-19%

4%

-7%

METALLURGICAL COAL

Metallurgical coal

('000 tonnes)

7,337

8,888

8,966

26,792

25,121

7%

22%

1%

ENERGY COAL

Energy coal

('000 tonnes)

17,248

18,256

15,486

53,349

52,627

1%

-10%

-15%

 

Throughout this report figures in italics indicate that this figure has been adjusted since it was previously reported.

 

BHP BILLITON ATTRIBUTABLE PRODUCTION

QUARTER ENDED

YEAR TO DATE

BHP Billiton

MAR

JUN

SEP

DEC

MAR

MAR

MAR

interest

2012

2012

2012

2012

2013

2013

2012

PETROLEUM

Production

Crude oil & condensate ('000 bbl)

18,127

15,726

18,036

19,228

16,689

53,953

55,475

Natural gas (bcf)

209.17

221.25

232.85

219.66

207.27

659.78

601.01

NGL ('000 boe) (a)

3,609

3,758

4,411

4,064

4,182

12,657

10,327

Total petroleum products (million boe)

56.60

56.36

61.25

59.90

55.42

176.57

165.98

ALUMINIUM AND NICKEL

ALUMINA

Saleable production ('000 tonnes)

Worsley

86%

741

730

859

944

911

2,714

2,187

Alumar

36%

311

309

311

288

302

901

926

Total

1,052

1,039

1,170

1,232

1,213

3,615

3,113

ALUMINIUM

Production ('000 tonnes)

Hillside

100%

144

117

139

166

177

482

504

Bayside

100%

26

23

25

25

26

76

75

Alumar

40%

42

42

39

39

37

115

128

Mozal

47%

65

66

67

67

64

198

198

Total

277

248

270

297

304

871

905

NICKEL

Saleable production ('000 tonnes)

Cerro Matoso

99.9%

13.4

12.8

13.3

12.4

12.3

38.0

36.1

Nickel West

100%

28.3

29.9

23.7

22.3

29.8

75.8

79.1

Total

41.7

42.7

37.0

34.7

42.1

113.8

115.2

BASE METALS (b)

COPPER

Payable metal in concentrate ('000 tonnes)

Escondida

57.5%

87.7

115.8

101.2

120.7

128.0

349.9

218.0

Antamina

33.8%

30.9

34.9

40.2

39.6

25.2

105.0

92.1

Pinto Valley

100%

-

-

-

0.5

5.3

5.8

-

Total

118.6

150.7

141.4

160.8

158.5

460.7

310.1

Cathode ('000 tonnes)

Escondida

57.5%

47.4

48.7

41.6

40.8

43.3

125.7

123.3

Pampa Norte (c)

100%

66.2

62.1

52.7

58.8

56.4

167.9

201.6

Pinto Valley

100%

1.4

1.2

1.2

1.2

1.2

3.6

4.2

Olympic Dam

100%

47.8

49.8

37.0

33.6

47.7

118.3

142.8

Total

162.8

161.8

132.5

134.4

148.6

415.5

471.9

Total Copper

281.4

312.5

273.9

295.2

307.1

876.2

782.0

LEAD

Payable metal in concentrate (tonnes)

Cannington

100%

53,412

63,334

51,923

45,937

48,899

146,759

175,756

Antamina

33.8%

148

333

260

198

181

639

455

Total

53,560

63,667

52,183

46,135

49,080

147,398

176,211

ZINC

Payable metal in concentrate (tonnes)

Cannington

100%

12,904

12,540

11,408

13,622

11,045

36,075

42,137

Antamina

33.8%

16,823

18,208

14,514

12,587

19,148

46,249

39,332

Total

29,727

30,748

25,922

26,209

30,193

82,324

81,469

Refer footnotes on page 4.

BASE METALS (continued)

GOLD

Payable metal in concentrate (ounces)

Escondida

57.5%

12,732

12,817

9,419

13,877

14,545

37,841

38,037

Olympic Dam (refined gold)

100%

31,952

27,752

23,017

24,215

27,531

74,763

90,093

Total

44,684

40,569

32,436

38,092

42,076

112,604

128,130

SILVER

Payable metal in concentrate ('000 ounces)

Escondida

57.5%

481

488

350

481

493

1,324

1,433

Antamina

33.8%

1,170

1,043

919

934

802

2,655

3,229

Cannington

100%

7,836

9,757

7,689

6,949

7,323

21,961

24,451

Olympic Dam (refined silver)

100%

228

251

207

193

214

614

656

Pinto Valley

100%

-

-

-

-

11

11

-

Total

9,715

11,539

9,165

8,557

8,843

26,565

29,769

URANIUM OXIDE CONCENTRATE

Payable metal in concentrate (tonnes)

Olympic Dam

100%

896

1,080

1,042

1,014

933

2,989

2,805

Total

896

1,080

1,042

1,014

933

2,989

2,805

MOLYBDENUM

Payable metal in concentrate (tonnes)

Antamina

33.8%

521

464

454

410

321

1,185

1,882

Total

521

464

454

410

321

1,185

1,882

DIAMONDS AND SPECIALTY PRODUCTS

DIAMONDS

Production ('000 carats)

EKATI TM

80%

433

413

313

295

322

930

1,371

Refer footnotes on page 4.

IRON ORE

Production ('000 tonnes) (d)

Newman (e)

85%

11,789

13,132

11,752

12,809

13,028

37,589

38,194

Goldsworthy Joint Venture

85%

37

143

432

378

296

1,106

625

Area C Joint Venture

85%

10,343

11,166

10,937

10,245

10,983

32,165

31,259

Yandi Joint Venture

85%

13,063

13,595

13,771

15,954

13,302

43,027

39,941

Samarco

50%

2,711

2,855

2,880

2,804

2,596

8,280

8,568

Total

37,943

40,891

39,772

42,190

40,205

122,167

118,587

MANGANESE

MANGANESE ORES

Saleable production ('000 tonnes)

South Africa (f)

44.4%

917

989

858

834

859

2,551

2,636

Australia (f)

60%

1,123

1,077

1,288

1,283

1,149

3,720

3,229

Total

2,040

2,066

2,146

2,117

2,008

6,271

5,865

MANGANESE ALLOYS

Saleable production ('000 tonnes)

South Africa (f) (g)

60%

81

75

93

91

86

270

329

Australia (f)

60%

57

-

37

62

57

156

198

Total

138

75

130

153

143

426

527

METALLURGICAL COAL

Production ('000 tonnes) (h)

BMA

50%

4,226

4,105

5,182

5,440

5,327

15,949

14,506

BHP Mitsui Coal (i)

80%

1,649

1,661

1,766

1,589

1,862

5,217

5,032

Illawarra

100%

1,462

2,343

1,990

1,859

1,777

5,626

5,583

Total

7,337

8,109

8,938

8,888

8,966

26,792

25,121

ENERGY COAL

Production ('000 tonnes)

South Africa

100%

7,895

8,313

8,454

7,969

7,302

23,725

24,966

USA

100%

2,109

2,673

3,871

2,798

2,835

9,504

6,739

Australia

100%

4,291

4,393

4,453

4,827

3,837

13,117

12,364

Colombia

33%

2,953

3,105

2,829

2,662

1,512

7,003

8,558

Total

17,248

18,484

19,607

18,256

15,486

53,349

52,627

 

(a) LPG and ethane are reported as Natural Gas Liquid (NGL). Product-specific conversions are made and NGL is reported in barrels of oil equivalent (boe).

(b) Metal production is reported on the basis of payable metal.

(c) Includes Cerro Colorado and Spence.

(d) Iron ore production is reported on a wet tonnes basis.

(e) Newman includes Mt Newman Joint Venture and Jimblebar.

(f) Shown on 100% basis. BHP Billiton interest in saleable production is 60%, except Hotazel Manganese Mines which is 44.4%.

(g) Production includes Medium Carbon Ferro Manganese.

(h) Metallurgical coal production is reported on the basis of saleable product. Production figures include some thermal coal.

(i) Shown on 100% basis. BHP Billiton interest in saleable production is 80%.

 

PRODUCTION AND SALES REPORT

QUARTER ENDED

YEAR TO DATE

MAR

JUN

SEP

DEC

MAR

MAR

MAR

2012

2012

2012

2012

2013

2013

2012

PETROLEUM

BHP Billiton attributable production unless otherwise stated.

CRUDE OIL & CONDENSATE ('000 barrels)

Bass Strait

2,285

2,357

2,569

2,081

1,934

6,584

7,002

North West Shelf

1,671

1,587

1,867

1,829

1,526

5,222

4,757

Stybarrow

618

635

534

464

323

1,321

2,625

Pyrenees

2,540

2,482

2,605

2,379

1,659

6,643

9,648

Other Australia (a)

13

13

17

15

15

47

39

Atlantis (b)

2,262

39

1,554

2,376

1,471

5,401

6,733

Mad Dog (b)

-

-

369

906

791

2,066

-

Shenzi (b)

4,071

3,607

3,783

4,008

3,580

11,371

12,038

Onshore US (c)

2,202

2,434

2,358

2,658

3,071

8,087

4,505

Trinidad/Tobago

453

488

376

362

331

1,069

1,385

Other Americas (b) (d)

373

348

367

410

384

1,161

1,120

UK

328

367

260

355

326

941

1,208

Algeria (e)

1,236

1,291

1,309

1,316

1,207

3,832

4,171

Pakistan

75

78

68

69

71

208

244

Total

18,127

15,726

18,036

19,228

16,689

53,953

55,475

NATURAL GAS (billion cubic feet)

Bass Strait

19.74

31.47

40.06

26.67

23.38

90.11

75.27

North West Shelf

29.60

29.80

35.33

34.09

31.29

100.71

95.13

Other Australia (a)

4.42

4.87

6.20

5.48

5.17

16.85

13.43

Atlantis (b)

1.18

0.01

0.59

0.89

0.54

2.02

2.49

Mad Dog (b)

-

-

0.06

0.18

0.15

0.39

-

Shenzi (b)

0.56

0.47

2.11

0.94

0.81

3.86

1.75

Onshore US (c)

124.17

124.53

122.59

123.03

115.69

361.31

323.39

Trinidad/Tobago

9.50

9.54

9.21

9.15

8.84

27.20

28.53

Other Americas (b) (d)

1.09

0.79

0.35

0.48

0.59

1.42

3.26

UK

5.03

5.54

3.29

5.26

6.44

14.99

14.45

Pakistan

13.88

14.23

13.06

13.49

14.37

40.92

43.31

Total

209.17

221.25

232.85

219.66

207.27

659.78

601.01

NGL ('000 barrels of oil equivalent)

Bass Strait

1,355

1,738

2,053

1,342

1,405

4,800

4,585

North West Shelf

421

342

385

354

323

1,062

1,278

Atlantis (b)

221

1

54

209

96

359

464

Mad Dog (b)

-

-

16

72

55

143

-

Shenzi (b)

291

244

370

324

269

963

880

Onshore US (c)

1,275

1,388

1,516

1,736

2,004

5,256

2,634

Other Americas (b) (d)

34

24

17

16

13

46

109

UK

12

21

-

11

17

28

75

Algeria (e)

-

-

-

-

-

-

302

Total

3,609

3,758

4,411

4,064

4,182

12,657

10,327

TOTAL PETROLEUM PRODUCTS

56.60

56.36

61.25

59.90

55.42

176.57

165.98

(million barrels of oil equivalent) (f)

 

(a) Other Australia includes Minerva.

(b) Gulf of Mexico volumes are net of royalties.

(c) Petrohawk Energy Corporation acquisition completed on 20 August 2011. Onshore US volumes are net of mineral holder royalties.

(d) Other Americas includes Neptune, West Cameron 76, Genesis and Starlifter. West Cameron 76 and Starlifter were divested in May 2012.

(e) Algeria includes ROD and Ohanet. The Ohanet Risk Sharing Contract expired in October 2011.

(f) Total barrels of oil equivalent (boe) conversions are based on 6,000 scf of natural gas equals 1 boe.

 

PRODUCTION AND SALES REPORT

QUARTER ENDED

YEAR TO DATE

MAR

JUN

SEP

DEC

MAR

MAR

MAR

2012

2012

2012

2012

2013

2013

2012

ALUMINIUM AND NICKEL

BHP Billiton attributable production and sales unless otherwise stated.

('000 tonnes)

ALUMINA

Saleable production

Worsley, Australia

741

730

859

944

911

2,714

2,187

Alumar, Brazil

311

309

311

288

302

901

926

Total

1,052

1,039

1,170

1,232

1,213

3,615

3,113

Sales

Worsley, Australia

713

750

820

916

910

2,646

2,178

Alumar, Brazil

216

356

352

298

296

946

845

Total

929

1,106

1,172

1,214

1,206

3,592

3,023

ALUMINIUM

Production

Hillside, South Africa

144

117

139

166

177

482

504

Bayside, South Africa

26

23

25

25

26

76

75

Alumar, Brazil

42

42

39

39

37

115

128

Mozal, Mozambique

65

66

67

67

64

198

198

Total

277

248

270

297

304

871

905

Sales

Hillside, South Africa

141

126

139

171

166

476

490

Bayside, South Africa

27

21

26

26

27

79

76

Alumar, Brazil

31

45

46

41

39

126

118

Mozal, Mozambique

66

54

58

65

76

199

211

Total

265

246

269

303

308

880

895

NICKEL

Cerro Matoso, Colombia

Production

13.4

12.8

13.3

12.4

12.3

38.0

36.1

Sales

13.8

12.9

12.3

13.7

13.0

39.0

34.6

Nickel West, Australia

Saleable production

Nickel contained in concentrate

2.3

2.3

1.3

4.1

3.1

8.5

6.7

Nickel contained in finished matte

10.5

14.2

5.8

7.6

9.7

23.1

34.7

Nickel metal

15.5

13.4

16.6

10.6

17.0

44.2

37.7

Nickel production

28.3

29.9

23.7

22.3

29.8

75.8

79.1

Sales

Nickel contained in concentrate

1.5

3.6

1.6

2.9

3.1

7.6

5.3

Nickel contained in finished matte

10.2

16.7

6.7

7.0

9.0

22.7

34.2

Nickel metal

14.2

15.7

14.2

12.8

19.5

46.5

34.5

Nickel sales

25.9

36.0

22.5

22.7

31.6

76.8

74.0

 

PRODUCTION AND SALES REPORT

QUARTER ENDED

YEAR TO DATE

MAR

JUN

SEP

DEC

MAR

MAR

MAR

2012

2012

2012

2012

2013

2013

2012

BASE METALS

BHP Billiton attributable production and sales unless otherwise stated. Metals production is payable metal unless otherwise stated.

Escondida, Chile

Material mined (100%)

('000 tonnes)

103,321

109,724

102,499

96,938

94,567

294,004

268,479

Sulphide ore milled (100%)

('000 tonnes)

16,449

18,640

16,850

18,796

18,964

54,610

47,141

Average copper grade

(%)

1.14%

1.37%

1.35%

1.39%

1.44%

1.40%

1.03%

Production ex mill (100%)

('000 tonnes)

153.1

211.7

185.2

216.6

229.3

631.1

389.3

Production

Payable copper

('000 tonnes)

87.7

115.8

101.2

120.7

128.0

349.9

218.0

Payable gold concentrate

(fine ounces)

12,732

12,817

9,419

13,877

14,545

37,841

38,037

Copper cathode (EW)

('000 tonnes)

47.4

48.7

41.6

40.8

43.3

125.7

123.3

Payable silver concentrate

('000 ounces)

481

488

350

481

493

1,324

1,433

Sales

Payable copper

('000 tonnes)

82.6

113.1

95.7

134.7

123.8

354.2

213.9

Payable gold concentrate

(fine ounces)

11,998

12,683

8,999

11,060

10,537

30,596

37,407

Copper cathode (EW)

('000 tonnes)

44.3

53.4

38.8

46.8

34.0

119.6

115.3

Payable silver concentrate

('000 ounces)

454

483

324

444

414

1,182

1,416

Pampa Norte, Chile

Cerro Colorado

Material mined

('000 tonnes)

16,320

16,246

16,067

15,722

14,964

46,753

47,848

Ore milled

('000 tonnes)

4,300

4,388

4,505

4,206

4,350

13,061

13,509

Average copper grade

(%)

0.72%

0.61%

0.55%

0.66%

0.65%

0.62%

0.72%

Production

Copper cathode (EW)

('000 tonnes)

18.7

18.7

17.8

17.9

14.6

50.3

64.7

Sales

Copper cathode (EW)

('000 tonnes)

20.2

19.1

16.1

18.8

13.7

48.6

66.4

Spence

Material mined

('000 tonnes)

29,982

28,594

27,541

25,999

28,861

82,401

76,309

Ore milled

('000 tonnes)

4,279

3,604

3,752

4,161

4,041

11,954

13,050

Average copper grade

(%)

1.20%

1.28%

1.17%

1.29%

1.38%

1.28%

1.33%

Production

Copper cathode (EW)

('000 tonnes)

47.5

43.4

34.9

40.9

41.8

117.6

136.9

Sales

Copper cathode (EW)

('000 tonnes)

44.1

51.3

31.1

42.6

29.8

103.5

133.9

Antamina, Peru

Material mined (100%)

('000 tonnes)

41,474

48,256

54,482

49,246

48,032

151,760

124,445

Sulphide ore milled (100%)

('000 tonnes)

10,162

12,295

12,274

11,752

10,330

34,356

29,214

Average head grades

 - Copper

(%)

1.10%

1.01%

1.15%

1.16%

0.88%

1.07%

1.12%

 - Zinc

(%)

0.84%

0.80%

0.66%

0.64%

0.93%

0.73%

0.75%

Production

Payable copper

('000 tonnes)

30.9

34.9

40.2

39.6

25.2

105.0

92.1

Payable zinc

(tonnes)

16,823

18,208

14,514

12,587

19,148

46,249

39,332

Payable silver

('000 ounces)

1,170

1,043

919

934

802

2,655

3,229

Payable lead

(tonnes)

148

333

260

198

181

639

455

Payable molybdenum

(tonnes)

521

464

454

410

321

1,185

1,882

Sales

Payable copper

('000 tonnes)

30.7

32.7

39.7

42.7

24.1

106.5

90.6

Payable zinc

(tonnes)

13,464

18,174

15,519

17,874

16,062

49,455

35,704

Payable silver

('000 ounces)

1,114

896

849

1,101

772

2,722

2,887

Payable lead

(tonnes)

200

48

330

276

115

721

430

Payable molybdenum

(tonnes)

669

488

536

381

371

1,288

1,809

Cannington, Australia

Material mined

('000 tonnes)

756

880

717

817

810

2,344

2,353

Ore milled

('000 tonnes)

778

845

773

793

713

2,279

2,492

Average head grades

 - Silver

(g/t)

367

417

355

317

364

345

356

 - Lead

(%)

8.0%

8.6%

7.6%

7.0%

7.7%

7.4%

8.3%

 - Zinc

(%)

2.7%

2.5%

2.5%

2.9%

2.7%

2.7%

2.8%

Production

Payable silver

('000 ounces)

7,836

9,757

7,689

6,949

7,323

21,961

24,451

Payable lead

(tonnes)

53,412

63,334

51,923

45,937

48,899

146,759

175,756

Payable zinc

(tonnes)

12,904

12,540

11,408

13,622

11,045

36,075

42,137

Sales

Payable silver

('000 ounces)

7,081

10,784

8,506

6,694

7,265

22,465

22,475

Payable lead

(tonnes)

49,027

73,400

59,042

46,319

48,661

154,022

163,942

Payable zinc

(tonnes)

10,780

14,399

10,379

16,321

9,439

36,139

40,592

Olympic Dam, Australia

Material mined (a)

('000 tonnes)

2,389

2,629

2,226

2,123

2,448

6,797

7,372

Ore milled

('000 tonnes)

2,195

2,475

2,471

2,435

2,353

7,259

7,106

Average copper grade

(%)

2.01%

1.86%

1.90%

1.71%

1.73%

1.78%

2.02%

Average uranium grade

(kg/t)

0.57

0.55

0.54

0.51

0.50

0.52

0.54

Production

Copper cathode (ER)

('000 tonnes)

45.2

46.0

34.0

30.4

44.7

109.1

134.3

Copper cathode (EW)

('000 tonnes)

2.6

3.8

3.0

3.2

3.0

9.2

8.5

Uranium oxide concentrate

(tonnes)

896

1,080

1,042

1,014

933

2,989

2,805

Refined gold

(fine ounces)

31,952

27,752

23,017

24,215

27,531

74,763

90,093

Refined silver

('000 ounces)

228

251

207

193

214

614

656

Sales

Copper cathode (ER)

('000 tonnes)

44.4

47.8

35.1

33.2

40.1

108.4

132.5

Copper cathode (EW)

('000 tonnes)

3.0

3.1

3.4

2.7

3.1

9.2

9.0

Uranium oxide concentrate

(tonnes)

640

1,252

615

1,343

816

2,774

2,676

Refined gold

(fine ounces)

36,832

29,257

20,949

25,227

24,678

70,854

90,138

Refined silver

('000 ounces)

268

200

265

169

211

645

712

(a)

Material mined refers to run of mine ore mined and hoisted.

Pinto Valley, US (a)

Production

Payable copper

('000 tonnes)

-

-

-

0.5

5.3

5.8

-

Copper cathode (EW)

('000 tonnes)

1.4

1.2

1.2

1.2

1.2

3.6

4.2

Payable silver

('000 ounces)

-

-

-

-

11

11

-

Sales

Payable copper

('000 tonnes)

-

-

-

-

2.6

2.6

-

Copper cathode (EW)

('000 tonnes)

1.2

1.2

1.2

1.2

1.1

3.5

4.1

Payable silver

('000 ounces)

-

-

-

-

11

11

-

 

(a) Mining operations at Pinto Valley were restarted during the December 2012 quarter.

 

PRODUCTION AND SALES REPORT

QUARTER ENDED

YEAR TO DATE

MAR

JUN

SEP

DEC

MAR

MAR

MAR

2012

2012

2012

2012

2013

2013

2012

DIAMONDS AND SPECIALTY PRODUCTS

BHP Billiton attributable production and sales unless otherwise stated.

DIAMONDS

EKATI TM, Canada (a)

Ore Processed (100%)

('000 tonnes)

1,001

1,214

1,042

982

954

2,978

3,268

Production

('000 carats)

433

413

313

295

322

930

1,371

 

(a) On 10 April 2013 BHP Billiton completed the sale of its diamonds business, comprising its interests in the EKATI Diamond Mine and Diamonds Marketing operations.

 

PRODUCTION AND SALES REPORT

QUARTER ENDED

YEAR TO DATE

MAR

JUN

SEP

DEC

MAR

MAR

MAR

2012

2012

2012

2012

2013

2013

2012

IRON ORE

BHP Billiton attributable production and sales unless otherwise stated.

('000 tonnes)

IRON ORE (a)

Pilbara, Australia

Production

Newman (b)

11,789

13,132

11,752

12,809

13,028

37,589

38,194

Goldsworthy Joint Venture

37

143

432

378

296

1,106

625

Area C Joint Venture

10,343

11,166

10,937

10,245

10,983

32,165

31,259

Yandi Joint Venture

13,063

13,595

13,771

15,954

13,302

43,027

39,941

Total (BHP Billiton share)

35,232

38,036

36,892

39,386

37,609

113,887

110,019

Total production (100%)

41,449

44,748

43,403

46,337

44,245

133,985

129,434

Sales

Lump

8,235

9,100

8,338

9,806

9,339

27,483

24,679

Fines

26,523

28,870

28,718

30,479

28,370

87,567

84,240

Total (BHP Billiton share)

34,758

37,970

37,056

40,285

37,709

115,050

108,919

Total sales (100%)

40,892

44,670

43,595

47,393

44,363

135,351

128,140

Samarco, Brazil

Production

2,711

2,855

2,880

2,804

2,596

8,280

8,568

Sales

2,453

2,778

2,622

3,227

2,515

8,364

8,340

 

(a) Iron ore production and sales are reported on a wet tonnes basis.

(b) Newman includes Mt Newman Joint Venture and Jimblebar.

 

PRODUCTION AND SALES REPORT

QUARTER ENDED

YEAR TO DATE

MAR

JUN

SEP

DEC

MAR

MAR

MAR

2012

2012

2012

2012

2013

2013

2012

MANGANESE

BHP Billiton attributable production and sales unless otherwise stated.

('000 tonnes)

MANGANESE ORE

South Africa (a)

Saleable production

917

989

858

834

859

2,551

2,636

Sales

871

866

878

808

835

2,521

2,585

Australia (a)

Saleable production

1,123

1,077

1,288

1,283

1,149

3,720

3,229

Sales

1,115

1,343

1,171

979

1,326

3,476

3,085

MANGANESE ALLOY

South Africa (a) (b)

Saleable production

81

75

93

91

86

270

329

Sales

122

104

74

112

89

275

355

Australia (a)

Saleable production

57

-

37

62

57

156

198

Sales

57

23

46

52

68

166

206

 

(a) Shown on 100% basis. BHP Billiton interest in saleable production is 60%, except Hotazel Manganese Mines which is 44.4%.

(b) Production includes Medium Carbon Ferro Manganese.

 

PRODUCTION AND SALES REPORT

QUARTER ENDED

YEAR TO DATE

MAR

JUN

SEP

DEC

MAR

MAR

MAR

2012

2012

2012

2012

2013

2013

2012

METALLURGICAL COAL

BHP Billiton attributable production and sales unless otherwise stated.

('000 tonnes)

METALLURGICAL COAL (a)

Queensland, Australia

Production

BMA

Blackwater

955

991

1,148

1,588

1,157

3,893

3,444

Goonyella

1,153

1,012

1,535

1,392

1,478

4,405

3,991

Peak Downs

788

783

1,029

1,151

1,225

3,405

2,751

Saraji

627

724

773

994

711

2,478

2,329

Norwich Park (b)

248

193

-

-

-

-

982

Gregory Joint Venture (c)

455

402

697

315

657

1,669

1,009

Daunia (d)

-

-

-

-

99

99

-

BMA total

4,226

4,105

5,182

5,440

5,327

15,949

14,506

BHP Mitsui Coal (e)

South Walker Creek

1,040

1,034

1,084

864

1,188

3,136

3,047

Poitrel

609

627

682

725

674

2,081

1,985

BHP Mitsui Coal total

1,649

1,661

1,766

1,589

1,862

5,217

5,032

Queensland total

5,875

5,766

6,948

7,029

7,189

21,166

19,538

Sales

Coking coal

4,522

4,007

4,058

5,561

4,933

14,552

14,433

Weak coking coal

1,595

1,512

1,545

1,820

2,029

5,394

5,033

Thermal coal

111

90

239

237

75

551

307

Total

6,228

5,609

5,842

7,618

7,037

20,497

19,773

Illawarra, Australia

Production

1,462

2,343

1,990

1,859

1,777

5,626

5,583

Sales

Coking coal

1,460

1,845

1,775

1,785

1,595

5,155

4,388

Thermal coal

219

279

502

327

145

974

819

Total

1,679

2,124

2,277

2,112

1,740

6,129

5,207

 

(a) Metallurgical coal production is reported on the basis of saleable product. Production figures include some thermal coal.

(b) Norwich Park ceased production on 11 May 2012.

(c) Gregory open-cut ceased production on 10 October 2012.

(d) Daunia project achieved first production in the March 2013 quarter.

(e) Shown on 100% basis. BHP Billiton interest in saleable production is 80%.

 

PRODUCTION AND SALES REPORT

QUARTER ENDED

YEAR TO DATE

MAR

JUN

SEP

DEC

MAR

MAR

MAR

2012

2012

2012

2012

2013

2013

2012

ENERGY COAL

BHP Billiton attributable production and sales unless otherwise stated.

('000 tonnes)

South Africa

Production

 7,895

8,313

 8,454

 7,969

 7,302

 23,725

 24,966

Sales

Export

3,807

3,314

3,385

3,583

 3,604

 10,572

10,792

Local utility

 4,397

 4,571

4,869

4,615

 4,171

13,655

14,601

Inland

124

74

38

28

32

98

374

Total

8,328

7,959

8,292

8,226

7,807

24,325

25,767

New Mexico, US

Production

Navajo Coal

1,913

1,853

1,804

1,377

1,840

5,021

 5,151

San Juan Coal

196

820

 2,067

 1,421

995

4,483

1,588

Total

 2,109

2,673

3,871

 2,798

 2,835

9,504

6,739

Sales - local utility

3,057

 2,773

 3,420

 3,265

 3,275

 9,960

 9,795

NSW Energy Coal, Australia

Production

4,291

4,393

4,453

4,827

 3,837

13,117

12,364

Sales

Export

3,160

 4,388

4,488

4,187

4,505

13,180

 10,249

Inland

297

404

 250

265

174

689

1,255

Total

3,457

 4,792

4,738

4,452

4,679

13,869

11,504

Cerrejon Coal, Colombia

Production

2,953

 3,105

 2,829

2,662

 1,512

7,003

8,558

Sales - export

 2,652

2,942

2,630

 2,702

1,774

 7,106

8,337

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCIFMTTMBIBTRJ

Related Shares:

BHP Group
FTSE 100 Latest
Value8,980.79
Change8.15