BHP Billiton Exploration and Development Report

21st Jul 2010 07:00

RNS Number : 6555P
BHP Billiton PLC
21 July 2010
 



NEWS RELEASE

Release Time

IMMEDIATE

Date

21 July 2010

Number

19/10

 

BHP BILLITON EXPLORATION AND DEVELOPMENT REPORT

FOR THE QUARTER ENDED 30 JUNE 2010

Development

 

The Newcastle Third Port Project (energy coal) was completed in June 2010, ahead of schedule and budget. This project will not be reported in future Exploration and Development reports.

 

During the year ended 30 June 2010 a further three projects achieved first production and two projects were sanctioned for development. The three commissioned projects were Western Australia Iron Ore Rapid Growth Project 4 (iron ore), Klipspruit Expansion (energy coal) and Pyrenees (oil and gas). The sanctioned projects were MAC20 Project (energy coal) and Antamina Expansion (copper).

 

In addition, US$2.4 billion of pre-commitment expenditure was approved to accelerate development of Western Australia Iron Ore Rapid Growth Project 6 (iron ore), Caval Ridge and Hay Point Coal Terminal Stage 3 Expansion (both metallurgical coal) and the first stages of the Jansen Potash Project (potash).

 

Project And Ownership

Share Of Approved Capex US$M

Initial Production Target Date

Production Capacity (100%)

Quarterly Progress

Petroleum Projects

Angostura Gas Phase II (Trinidad and Tobago) 45% Gas

180

H1 CY11

280 million cubic feet gas per day

On schedule and budget. Installation campaign is ongoing. Compression platform jacket installed. Topsides fabrication continues. The overall project is 69% complete.

Bass Strait Kipper (Australia) 32.5% - 50% Gas/Gas Liquids

500

CY11

10,000 bpd condensate and processing capacity of 80 million cubic feet gas per day

Schedule and budget under review following advice from the operator.

Bass Strait Turrum (Australia) 50% Gas/Gas Liquids

625

CY11

11,000 bpd condensate and processing capacity of 200 million cubic feet gas per day

Schedule and budget under review following advice from the operator.

North West Shelf CWLH Life Extension (Australia) 16.67% Oil

245

CY11

Replacement vessel with capacity of 60,000 bpd oil

On schedule and budget. Floating Production Storage and Offtake (FPSO) conversion continues. The overall project is 81% complete.

North West Shelf North Rankin B Gas Compression (Australia) 16.67% LNG

850

CY12

2,500 million cubic feet gas per day

On schedule and budget. Jacket fabrication continuing ahead of schedule. The overall project is 51% complete.

Minerals Projects

Worsley Efficiency & Growth (Australia) 86% Alumina

1,900

H1 CY11

1.1 million tpa of additional alumina

On schedule and budget. Construction is 27% complete. The overall project is 44% complete.

Antamina Expansion (Peru) 33.75% Copper

435

Q4 CY11

Increases ore processing capacity to 130,000 tpd

On schedule and budget. Engineering is 75% complete. Construction is 7% complete. The overall project is 18% complete.

Iron Ore (Western Australia) RGP5 85% Iron Ore

4,800

H2 CY11

50 million tpa additional iron ore system capacity

On schedule and budget. Engineering is 97% complete. Construction is 61% complete. The overall project is 64% complete.

Douglas-Middelburg Optimisation (South Africa) 100% Energy Coal

975

Mid CY10

10 million tpa export thermal coal and 8.5 million tpa domestic thermal coal (sustains current output)

On schedule and budget. Commissioning of the coal processing plant is underway. The overall project is 98% complete.

Newcastle Third Port Project (Australia) 35.5% Energy Coal

390

Mid CY10

30 million tpa export coal loading facility

Project has been completed ahead of schedule and budget, with the terminal becoming operational in June 2010.

MAC20 Project (Australia) 100% Energy Coal

260

H1 CY11

Increases saleable thermal coal production by approximately 3.5 million tpa

On schedule and budget. Engineering is complete. Construction is 75% complete. The overall project is 81% complete.

 

Minerals Exploration

 

Grassroots exploration continued on copper targets in Chile and Zambia; nickel targets in Australia; manganese targets in Gabon; and diamond targets in Canada. Exploration for iron ore, coal, bauxite, potash and manganese was undertaken in a number of regions including Australia, Canada, South America, Russia and Africa.

 

During the quarter, BHP Billiton confirmed the strength of its position in the Saskatchewan potash basin in Canada with the reporting of an in-situ Mineral Resource(1) of 3,370 million tonnes @ 25.4% K2O at its wholly-owned Jansen Potash Project. In addition, the Indonesian Coal Project (ICP) joint venture was formed following Government approvals. PT Adaro Energy TBK has acquired a 25 per cent interest in the ICP joint venture, with BHP Billiton holding the remaining 75 per cent.

 

For the year ended 30 June 2010, BHP Billiton spent US$516 million on minerals exploration, of which US$467 million was expensed. This includes US$73 million of exploration spend for potash in Saskatchewan, Canada.

(1) Competent Person's Statement

The statement of Mineral Resource being presented is based on information compiled by J.McElroy (MAusIMM) BHP Billiton, B.Nemeth (MAusIMM) BHP Billiton, and A. D. Mackintosh (APEGS) A.D.M Consulting and relates to Mineral Resource estimates as at 10 May 2010. A full statement of the Mineral Resource is provided in a BHP Billiton news release dated 7 June 2010. Competent Persons are full time employees of BHP Billiton (unless otherwise stated), have sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity they are undertaking to qualify as a Competent Person as defined in the JORC Code. All Competent Persons are members of either the Australian Institute of Mining & Metallurgy (AusIMM) or a Recognised Overseas Professional Organisation (ROPO). The Competent Persons consent to the inclusion in this report of the matters based on their information in the form and context in which it appears.

 

Petroleum Exploration

 

Exploration and appraisal wells drilled during the quarter or in the process of drilling as at 30 June 2010.

 

Well

Location

BHP Billiton Equity

Status

Deep Blue-1

Green Canyon Gulf of Mexico

GC 723

31.875% BHP Billiton

(Noble operator)

Temporarily suspended

Hydrocarbons encountered

Double Mountain-1

Green Canyon Gulf of Mexico

GC 555

70% BHP Billiton

(operator)

Plugged & abandoned

Dry hole

Firefox-1

Green Canyon Gulf of Mexico

GC 817

50% BHP Billiton

(operator)

Plugged & abandoned

Dry hole

Wolverine-1

Laurentian Basin Canada

E.L. 1087R

45% BHP Billiton

(CoP operator)

Plugged & abandoned

Dry hole

Bel Air-1

Liverpool Bay

110/13b

46.1% BHP Billiton

(operator)

Plugged & abandoned

Dry hole

Toroa-1

East Falkland Basin

PL015_02

51% BHP Billiton

(operator)

Drilling ahead

Furness C-1

Exmouth Sub-basin

WA-255-P

50% BHP Billiton

(operator)

Drilling ahead

 

Petroleum exploration expenditure for the year ended 30 June 2010 was US$817 million, of which US$563 million was expensed.

 

Further information on BHP Billiton can be found on our Internet site: www.bhpbilliton.com.

 

Australia

Amanda Buckley, Media Relations

Tel: +61 3 9609 2209 Mobile: +61 419 801 349

email: [email protected]

United Kingdom & South Africa

Andre Liebenberg, Investor Relations

Tel: +44 20 7802 4131 Mobile: +44 7920 236 974

email: [email protected]

 

Fiona Martin, Media Relations

Tel: +61 3 9609 2211 Mobile: +61 427 777 908

email: [email protected]

 

 

Illtud Harri, Media Relations

Tel: +44 20 7802 4195 Mobile: +44 7920 237 246

email: [email protected]

 

Leng Lau, Investor Relations

Tel: +61 3 9609 4202 Mobile: +61 403 533 706

email: [email protected]

 

 

Americas

Scott Espenshade, Investor Relations

Tel: +1 713 599 6431 Mobile: +1 713 208 8565

email: [email protected]

Brendan Harris, Investor Relations

Tel: +61 3 9609 4323 Mobile: +61 437 134 814

email: [email protected]

Ruban Yogarajah, Media Relations

Tel: US +1 713 966 2907 or UK +44 20 7802 4033

Mobile: UK +44 7827 082 022

email: [email protected]

 

 

BHP Billiton Limited ABN 49 004 028 077

Registered in Australia

Registered Office: 180 Lonsdale Street

Melbourne Victoria 3000 Australia

Tel +61 1300 55 4757 Fax +61 3 9609 3015

 

 

BHP Billiton Plc Registration number 3196209

Registered in England and Wales

Registered Office: Neathouse Place

London SW1V 1BH United Kingdom

Tel +44 20 7802 4000 Fax +44 20 7802 4111

 

 

Members of the BHP Billiton group which is headquartered in Australia

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 