Become a Member
  • Track your favourite stocks
  • Create & monitor portfolios
  • Daily portfolio value
Sign Up
Quickpicks
Add shares to your
quickpicks to
display them here!

BHP Billiton Exploration and Development Report

21st Oct 2009 07:00

RNS Number : 1243B
BHP Billiton PLC
20 October 2009
 



NEWS RELEASE

Release Time

IMMEDIATE

Date

21 October 2009

Number

20/09

BHP BILLITON EXPLORATION AND DEVELOPMENT REPORT

FOR THE QUARTER ENDED 30 SEPTEMBER 2009

This report covers the Group's exploration and development activities for the quarter ended 30 September 2009. This report, together with the Production Report, represents the Interim Management Statement for the purposes of the UK Listing Authority's Disclosure and Transparency Rules. There have been no significant changes to the financial position of the Group in the quarter ended 30 September 2009. Unless otherwise stated, BHP Billiton's interest in the projects referred to in this report is 100 per cent and references to project schedules are based on calendar years.

Development

During the quarter, we sanctioned the Mt Arthur Coal mine expansion (energy coal), known as the MAC20 Project, in the Hunter Valley, Australia.

Project And Ownership

Share Of Approved Capex US$M

Initial Production Target Date

Production Capacity (100%)

Quarterly Progress

Petroleum Projects

Pyrenees (Australia)

71.43%

Oil/Gas

1,200

H1 CY10

96,000 barrels of oil and 60 million cubic feet gas per day 

On schedule and budget. Floating Production Storage and Offtake (FPSO) conversion scope has been completed with sea trials and commissioning activities continuing. Installation of subsea facilities continue. All tophole sections drilled. 5 producers and 1 injector well completed.

Angostura Gas Phase II (Trinidad and Tobago)

45%

Gas

180

H1 CY11

280 million cubic feet gas per day

On schedule and budget. Platform fabrication continues.

Bass Strait Kipper (Australia)

32.5% - 50%

Gas/Gas Liquids

500

CY11

10,000 bpd condensate and processing capacity of 80 million cubic feet gas per day

On schedule and budget. West Tuna platform retrofit work continuing.

Bass Strait Turrum (Australia)

50%

Gas/Gas Liquids

625

CY11

11,000 bpd condensate and processing capacity of 200 million cubic feet gas per day 

On schedule and budget. Platform fabrication continues.

North West Shelf CWLH Life Extension (Australia)

16.67%

Oil

245

CY11

Replacement vessel with capacity of  60,000 bpd oil

On schedule and budget. Floating Production Storage and Offtake (FPSO) conversion continues.

North West Shelf North Rankin B Gas Compression (Australia)

16.67%

LNG

850

CY12

2,500 million cubic feet gas per day 

On schedule and budget. Jacket fabrication continuing ahead of schedule.

Minerals Projects

Worsley Efficiency & Growth (Australia)

86%

Alumina

1,900

H1 CY11

1.1 million tpa of additional alumina

On schedule and budget. Engineering is 85% complete and construction has commenced. Procurement and contracting activities are well advanced.

Iron Ore (Western Australia)

RGP4

86.2%

Iron Ore

1,850

H1 CY10

26 million tpa of additional iron ore system capacity

On schedule and budget. Engineering is complete, construction is essentially complete, and commissioning activities are well advanced. First ore is expected to be produced in Q4 CY09.

Iron Ore

(Western Australia)

RGP5

85%

Iron Ore

4,800

H2 CY11

50 million tpa additional iron ore system capacity

On schedule and budget. Engineering is over 80% complete, procurement and contracting activities are well advanced, and construction has reached 18% complete.

Klipspruit

(South Africa)

100%

Energy Coal

450

H2 CY09

Incremental 1.8 million tpa export thermal coal. Incremental 2.1 million tpa domestic thermal coal

On schedule and budget. Commissioning of the crushing stream and coal processing plant Module 1 is complete. Project is 98% complete.

Douglas-Middelburg

Optimisation (South

Africa)

100%

Energy Coal

975

Mid CY10

10 million tpa export thermal coal and 8.5 million tpa domestic thermal coal (sustains current output)

On schedule and budget. Construction activities are progressing well with civil works complete. The erection and installation of the coal processing plant continues. Project is 74% complete.

Newcastle Third Port

Project (Australia)

35.5%

Energy Coal

390

CY10

30 million tpa export coal loading facility

On schedule and budget. Stacker reclaimer commissioning has commenced with the remaining construction activities progressing well. Project is 75% complete.

MAC20 Project

(Australia)

100%

Energy Coal

260

H1 CY11

Increases saleable thermal coal production by approximately 3.5 million tpa 

Approval announced, see News Release dated 24 July 2009. 

On schedule and budget. Fixed plant construction underway. Project is 20% complete.

Minerals Exploration

BHP Billiton continues to identify and prioritise various exploration activities. All of the exploration activities are reviewed regularly to ensure that we are capturing value accretive opportunities for future development.

Grassroots exploration continued on copper targets in ChileArgentina and Zambia; nickel targets in Australia; manganese targets in Gabon; and diamond targets in Canada. Exploration for iron ore, coal, bauxite and manganese was undertaken in a number of regions including AustraliaSouth AmericaRussia and West Africa.

For the quarter ended 30 September 2009, BHP Billiton spent US$104 million on minerals exploration, of which US$95 million was expensed.

Petroleum Exploration

Exploration and appraisal wells drilled during the quarter or in the process of drilling as at 30 September 2009.

Well

Location

BHP Billiton Equity

Status

Mad Dog South-1 

Green Canyon Gulf of Mexico GC 826

23.9 % BHP Billiton

(BHP Billiton operator for this well - BP operator for all other activities)

Hydrocarbons encountered. See News Release dated 17 July 2009.

Petroleum exploration expenditure for the quarter ended 30 September 2009 was US$29 million, of which US$26 million was expensed.

Further information on BHP Billiton can be found on our website: www.bhpbilliton.com

Australia

Samantha Evans, Media Relations

Tel: +61 3 9609 2898 Mobile: +61 400 693 915

email: [email protected]

United Kingdom

Andre Liebenberg, Investor Relations 

Tel: +44 20 7802 4131 Mobile: +44 7920 236 974

email: [email protected]

Peter Ogden, Media Relations

Tel: +61 3 9609 2812 Mobile: +61 428 599 190

email: [email protected]

Illtud Harri, Media Relations

Tel: +44 20 7802 4195 Mobile: +44 7920 237 246

email: [email protected]

Kelly Quirke, Media Relations

Tel: +61 3 9609 2896 Mobile: +61 429 966 312

email: [email protected]

United States

Scott Espenshade, Investor Relations

Tel: +1 713 599 6431 Mobile: +1 713 208 8565

email: [email protected]

Leng Lau, Investor Relations

Tel: +61 3 9609 4202 Mobile: +61 403 533 706

email: [email protected] 

Ruban Yogarajah, Media Relations

Tel: US +1 713 966 2907 or UK +44 20 7802 4033

MobileUK +44 7827 082 022

email: [email protected]

South Africa

Bronwyn Wilkinson, Investor and Media Relations

Tel: +44 20 7802 4015 Mobile: +44 7500 785 892

email: [email protected] 

BHP Billiton Limited ABN 49 004 028 077

Registered in Australia

Registered Office: 180 Lonsdale Street

Melbourne Victoria 3000 Australia

Tel +61 1300 55 4757 Fax +61 3 9609 3015

BHP Billiton Plc Registration number 3196209

Registered in England and Wales

Registered Office: Neathouse Place

London SW1V 1BH United Kingdom

Tel +44 20 7802 4000 Fax +44 20 7802 4111

A member of the BHP Billiton group which is headquartered in Australia

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFEEEESSUSEFS

Related Shares:

BHP Group
FTSE 100 Latest
Value8,463.46
Change46.12