Asacha Mining and Production Update

29th Oct 2012 07:00

RNS Number : 6865P
Trans-Siberian Gold PLC
29 October 2012
 

 

 

Trans-Siberian Gold plc

 

Asacha mining and production update

 

 

LONDON: 29 October 2012 - Trans-Siberian Gold plc ("TSG" or the "Company") (TSG.L) reports that mine development activities at Asacha in the third quarter of 2012 comprised approximately 1,090 metres, while ore extraction (including ore from stoping and mine development) amounted to 26,644 mt.

 

In the same period, an average 12,414 mt per month was processed by the Asacha plant (99.3% of the production level envisaged in the plant's design documentation).

 

Mining and production at Asacha in the first nine months of 2012 is shown in the following table.

 

 

 

 

1st quarter 2012

2nd quarter 2012

July 2012

 

Aug 2012

 

Sept

2012

3rd quarter 2012

Year to date

Mine development (m)

1,023

1,047

381

352

357

1,090

3,160

Ore extracted (mt)

33,525

30,090

12,204

8,924

5,516

26,644

90,259

Ore processed (mt)

28,877

32,963

12,682

12,422

12,140

37,244

99,084

Average gold grade (g/t)

7.03

6.33

7.68

6.02

6.28

6.67

6.66

Average silver grade (g/t)

16.48

10.55

13.42

9.49

10.54

11.17

12.51

Gold recovery rate (%)

 95.14

95.48

96.01

94.93

95.85

95.66

95.48

Silver

recovery rate (%)

48.19

73.67

77.60

76.22

79.12

77.66

65.54

Gold in dore (oz)

 6,689

6,462

3,182

2,169

2,432

7,783

20,934

Silver in dore

(oz)

7,320

8,991

4,357

2,957

3,224

10,538

26,849

Gold refined (oz)

 6,281

6,427

3,464

2,336

1,265

7,065

19,773

Silver refined (oz)

 6,975

8,397

4,989

2,914

1,726

9,629

25,001

 

TSG reported on 27 September 2012 that the breakdown of some underground equipmenthad reduced the amount of stoping ore which could be delivered to the plant in the second half of the third quarter, necessitating blending the mined ore with lower grade ore from the surface ore stockpile. This problem continued into October, although all necessary spare parts have now been delivered to site. A new underground truck is expected to arrive in Kamchatka by the end of October. Its delivery to Asacha depends on road conditions and is expected in late November, at which time we also expect the arrival of a new underground loader.

 

As a consequence of the mining production problems in September and October, TSG now expects 2012 production of around 27,000 oz gold, compared to the previous estimate of 31,000 oz.

 

The Company is also taking steps to strengthen the mine's management team with the appointment of two new underground mining engineers and a mining geologist. It also intends to recruit a technical director for Asacha.

 

TSG will report Asacha's fourth quarter 2012 gold production in January 2013.

 

 

Ends

 

Contacts

 

TSG

 

Simon Olsen

+ 44 (0) 1480 811871

+ 44 (0) 7770 484965

 

 

Seymour Pierce Ltd

+44 (0) 207 107 8000

Stewart Dickson / David Foreman (Corporate Finance)

 

Jeremy Stephenson (Corporate Broking)

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 