29th Mar 2018 14:12
Separately, the company said its wholly-owned subsidiary Kimmeridge Oil & Gas Ltd has reported further proof of existence of a "continuous" oil accumulation at Broadford Bridge-1/1z, located in southern
"2017 has been a transformational year for UKOG. We have continued to build a spread of investments, focused on
For the year ended September 30, revenue amounted to
Pretax loss widened to
Planning permissions are in place for the full Horse Hill long-term testing and appraisal programme and Holmwood well,
Seperately, the company said its wholly-owned subsidiary Kimmeridge Oil & Gas said there has been further proof of existence of a "continuous" oil accumulation at Broadford Bridge-1/1z, and the existence of a regional scale Kimmeridge Limestone natural fracture network capable of delivering oil to surface without significant reservoir stimulation.
A further BB-1z sidetrack and/or alternate completion and reservoir stimulation techniques are under consideration,
Two further PEDL234 KL drilling sites have been finalised, both located within the thickest, most thermally mature and oil generative area of the deposit. The planned 2019 drilling campaign has been scheduled after testing and drilling programme completion at Horse Hill.
Shares in the company were up 0.2% at
Related Shares:
UK Oil & Gas