8th Aug 2014 06:56
LONDON (Alliance News) - Rame Energy PLC Friday said its engineering-services division has won a further contract with Canada's Barrick Gold Corp for the immediate design, supply and installation of new wind monitoring equipment at the Punta Colorada wind farm in Chile.
According to Rame, the works will include the installation of an 80 metre tall lattice mast, instrumentation, a solar panel, and a data logger with mobile connectivity. It said these will together provide verification data for the wind climate around six of the ten turbines that comprise the existing wind farm developed by Rame at the site.
Rame provided no financial details of the new agreement.
This contract follows Rame's recent refurbishment of one of Barrick's existing 50 metre tall monitoring masts and the provision of engineering services at Punta Colorada.
"This long standing relationship with Barrick continues to bear fruit for the company and is testament to the quality of our engineering services division, which leverages our expertise both on a regional and technical basis to provide power g solutions to heavy industry and mining in particular," Chief Executive Tim Adams said in a statement.
By Samuel Agini; [email protected]; @samuelagini
Copyright 2014 Alliance News Limited. All Rights Reserved.
Related Shares:
RAME.L