19th Jan 2026 17:30
Helium One Global Ltd - London-based helium explorer in Tanzania, also has a 50% working interest in the Galactica Project which is operated by Blue Star Helium Ltd - Announces that electrical submersible pump testing has started at the ITW‑1 well at the Rukwa helium project. All downhole tools and surface control equipment has now undergone the required checks and verification procedures prior to deployment. The ESP assembly is running in hole and will be positioned to allow further evaluation of the fractured Basement and Karoo intervals, through increased flow rates and enhanced helium production from these deeper geological zones, Helium One says. Once the ESP is set at the designated depth and the tubing hanger has been successfully tested, a final function test will be carried out before the well is opened and the pump activated. It is anticipated that this testing phase will take two to three weeks to complete.
Current stock price: 0.46 pence
12-month change: down 48%
By Jeremy Cutler, Alliance News reporter
Comments and questions to [email protected]
Copyright 2026 Alliance News Ltd. All Rights Reserved.
Related Shares:
Helium One