5th Sep 2024 16:18
(Alliance News) - Beowulf Mining PLC said on Thursday that test work has confirmed a high-grade product at Kallak iron ore project in Sweden.
The Nordic-focused mineral resource developer said that its metallurgical test-work programme for the Kallak asset has demonstrated the ability to produce an exceptionally high-grade, low impurity iron ore concentrate grading over 68% iron content and containing less than 3.7% silica and less than 0.23% alumina.
This supports the prior assumption that Kallak can product a concentrate suitable for the green steel sector.
The test work was completed in preparation for the Kallak pre-feasibility study that will build on previous programmes.
Chief Executive Officer Ed Bowie said: "The metallurgical test work has confirmed that Kallak can produce an exceptionally high grade, low impurity concentrate. Furthermore, this concentrate can be upgraded to a grade of over 70% iron with low levels of silica, a product that would be well suited for use as feedstock for modern, lower-carbon emitting steel-making practices including the direct reduced iron-electric arc furnace route. The indicative flow-sheet also has a number of significant advantages: utilising conventional technology and only physical separation with no flotation; and producing a single product.
"The results of this test work have now been passed to our process engineers who will design the full industrial flow-sheet with appropriate equipment sizing."
Shares in Beowulf Mining rose 8.1% to 25.94 pence each in London on Thursday afternoon.
By Emily Parsons, Alliance News reporter
Comments and questions to [email protected]
Copyright 2024 Alliance News Ltd. All Rights Reserved.