28th Apr 2017 07:00
28 April 2017
Ferrum Crescent Limited
("FCR", the "Company" or the "Group")(ASX, AIM, JSE: FCR)
Quarterly Activities and Cashflow Report
For the period ended 31 March 2017
Highlights:
Moonlight Iron Project
· Termination of farm-in and joint venture agreement with Business Venture Investments No. 1709 (Proprietary) Limited ("BVI") following BVI's failure to complete Phase I of the Bankable Feasibility Study by the agreed extended date
· Detailed negotiations held with a new third party group in relation to the potential development of the Moonlight Project
Spanish lead-zinc exploration projects
· Work programme designed and underway for the Toral Project with the goal of establishing the presence of mineralisation at surface and then defining the most prospective areas of mineralisation for a targeted drill campaign
· Targeted areas for sampling sit above mineralisation identified at depths between 370m and 929m by historic drilling which was the subject of a foreign resource estimate for the purposes of the ASX Listing Rules, comprising of an NI 43-101 compliant Inferred and Indicated foreign mineral resource estimate
· Channel sampling identified first mineralisation near surface, including:
o 0.9m @ 10.5% Zn & 2.5% Pb average on the main structure within Adit 49
o 1.2% Cu, 6.5% Zn & 13.5% Pb returned from a 1.2m channel sample in Adit 54
o Soil sampling identified distinct, continuous zinc‐in‐soil 2 kilometre anomaly, approximately 150 metres wide, including peak zinc‐in‐soil values of 1.4% zinc
· Drill programme plans to intersect shallow untested targets within the main anomalous area:
o Phase 1 drill programme at the Toral Project designed to intersect mineralising features at a series of shallow targets which are untested to date
o The two kilometre soil geochemistry anomaly at this depth will be targeted in three separate zones containing a variety of mineralising styles that will be tested down to depths of approximately 100m below surface
o The refined programme has been designed with an expected nine firm hole locations, with an average hole length of 155m for a minimum total to be drilled of 1,400m
o Five holes are planned for Zone 1, one 250m hole for Zone 2 (which crosses several separate targets) and three holes for Zone 3. The remaining 700m will be distributed on a discretionary basis during the drilling programme and may be used to test continuity at depths down to 150m below surface
Corporate
· New contract terms agreed for FCR's Executive Chairman, Justin Tooth, to continue his role as sole executive director of the Company and appointment of Merlin Marr-Johnson as Project Manager to oversee progression of the Company's lead-zinc project portfolio. Proposed adoption of a new equity incentive plan to replace the Company's existing equity incentive arrangements to be considered at a general meeting of shareholders to be held on 11 May 2017
· Laurence Read appointed to the Board as a non-executive Director, replacing Klaus Borowski who resigned to pursue other interests
· Cash balance at the end of the quarter: A$725,373
Post Quarter End
· Diamond drilling contract signed with Sondeos y Perforaciones Industriales de Bierzo SA for Phase 1 drill programme at the Toral Project
o Minimum of 1,400m and maximum of 2,100m to be drilled and programme expected to take up to three months to complete
o Drill cost of EUR80 per metre
· Work completed by FCR has recently identified mineralisation in multiple sub-vertical, sub-parallel planes and also mineralisation associated with crosscutting faults. In addition, several different styles of mineralisation have been identified, complementing data from the channel samples and soil geochemistry reported on 23 February 2017
· Moonlight Project update announced on 27 April 2017 stating that negotiations with a potential new third party partner had ceased without reaching any viable agreement. Consequently, the Board of FCR has decided, unless an alternative development opportunity can be secured in the short term, to undertake an orderly winding-up and hand-over process in respect of the Group's operations and licences associated with the project with a view to terminating all activities and expenditures in South Africa as soon as practicable
Exploration Interests
The following listing of tenements held is provided in accordance with ASX Listing Rule 5.3 for the quarter ended 31 March 2017:
Project | Location | Right Number | Right Status | Holder | Percentage Interest |
Moonlight | Limpopo Province, South Africa | 30/5/1/2/2/201 MR | Mining Right Granted | Ferrum Iron Ore (Pty) Ltd | 97% |
Moonlight
| Limpopo Province, South Africa | LP30/6/1/1/2/11868PR | Prospecting Right Application | Ferrum Iron Ore (Pty) Ltd | 97% |
Toral | León Province, Spain | 15.199
| Investigation Permit | GoldQuest Iberica, S.L. | 100% |
Lago | Galicia Province, Spain | Lago II 6.056
Lago III 6.058 | Lago II Exploration Permit Lago III Investigation Permit | GoldQuest Iberica, S.L. | 100% |
No tenements were acquired or disposed of during the quarter.
Justin Tooth, Executive Chairman of FCR, today commented:
"During the quarter under review, we have advanced our lead-zinc assets in Spain smoothly through channel sampling, soil sampling and mapping activities, culminating in the final stages of preparation for a drilling campaign. The drill programme is scheduled to start imminently and is designed to test lead-zinc mineralisation in the top two hundred metres below the main surface anomalies. Historic work has defined mineralisation at depth and FCR is now targeting mineralisation at higher levels in the structure, closer to surface.
"The Company has spent considerable time, effort and resources in searching for the right development partner for the Moonlight Project, but, regrettably, despite our best endeavours, we have been unable to secure a sustainable path to development. Mindful of the significant costs involved in maintaining the good standing of the project and the Mining Licence, we yesterday announced that the Board has decided that, unless an alternative development opportunity can be secured in the short term, the Company will undertake an orderly winding-up process for the project leading to the planned relinquishment of the licences at the earliest opportunity. Thereafter our resources will be increasingly focussed on the exciting Spanish lead-zinc project we are about to drill at Toral."
For further information on the Company, please visit www.ferrumcrescent.com or contact:
Ferrum Crescent Limited
Justin Tooth, Executive Chairman
Grant Button, Director and Company Secretary
T: +61 8 9474 2995
UK enquiries:
Laurence Read (UK representative)
T: +44 7557 672 432
Strand Hanson Limited (Nominated Adviser)
Rory Murphy/Matthew Chandler
T: +44 (0)20 7409 3494
Beaufort Securities Limited (Broker)
Elliot Hance
T: +44 (0)20 7382 8300
Bravura Capital (Pty) Ltd (JSE Sponsor)
Doné HattinghT (direct): +27 11 459 5037
The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014.
APPENDIX 5B:
http://www.rns-pdf.londonstockexchange.com/rns/6549D_-2017-4-28.pdf
Notes to Editors:
Further Information on the Spanish lead-zinc Exploration Projects
Toral Project
The wholly owned Toral zinc-lead-silver permit is located near Ponferrada in the west of the province of León, Autonomous Community of Castile and León, Spain approximately 400km northwest of Madrid.
The Toral Project has been extensively explored historically by its previous owners Portex Minerals Inc. and Lundin Mining S.L. and the 2,024ha of mineral rights contains extensive high grade zinc mineralisation. Located in north-west Spain, approximately 400km north-west of Madrid, the project's licence area hosts excellent road, rail and power infrastructure and is situated in a known historic mining jurisdiction. The asset also has a pre-existing NI 43-101 resource estimate reported by Micon International Co. Limited on 30 April 2012 (the "NI 43-101 Report"). The NI 43-101 Report estimated that the project has a NI 43-101 compliant Inferred and Indicated foreign resource estimate of 8.71Mt at an economic cut-off grade of 7% Pb + Zn (as set out in the Company's announcement of 10 November 2016).
Lago Project
The Lago Project is located approximately 54km to the north-east of the Toral Project. Historical investigations completed by or on behalf of the Spanish mining firm, Exploracion Minera International Espana S.A. ("EXMINESA"), between 1985 and 1990, indicated that mineralisation at the Lago Project may be similar to that encountered at the Toral Project with vertical, lenticular bodies (probably more than one) approximately 800m long by 300m wide.