KAZ Minerals Production Report for H1 and Q2 2018

26th Jul 2018 07:00

RNS Number : 7929V
KAZ Minerals PLC
26 July 2018
 

 

 

KAZ MINERALS PLC

6TH FLOOR

CARDINAL PLACE

100 VICTORIA STREET

LONDON SW1E 5JL

Tel: +44 (0) 20 7901 7800

 

 

 

26 July 2018

 

KAZ MINERALS GROUP Production Report for six months and THE second QUARTER Ended 30 June 2018

 

l H1 2018 copper production1 increased 18% to 139.6 kt (H1 2017: 118.0 kt)

l Aktogay sulphide concentrator achieves design throughput capacity

l Operations on track to achieve 2018 production guidance for all metals

l Bozshakol H1 copper production2 49.8 kt (H1 2017: 52.0 kt)

§ Average sulphide copper grade of 0.46% in Q2 (Q1 2018: 0.52%), in line with mine plan

§ Clay plant achieved 95% of design throughput capacity in Q2 (Q1 2018: 65%)

§ Strong H1 gold production2 of 62.3 koz (H1 2017: 62.9 koz)

l Aktogay H1 copper production1 increases 83% to 60.5 kt (H1 2017: 33.0 kt)

§ Sulphide concentrator averaged 89% of design throughput capacity in Q2 compared to 66% in Q1, including a sustained period operating at 100% of design throughput capacity

§ Cathode production from oxide ore of 11.5 kt in H1 (H1 2017: 10.4 kt)

l East Region and Bozymchak H1 copper production2 of 29.3 kt (H1 2017: 33.0 kt)

§ Planned idling of Nikolayevsky concentrator reduced processing volumes in H1

§ H1 gold2 (27.2 koz) and silver production2 (1,082 koz) represent good progress towards full year production targets

§ Zinc in concentrate production of 24.9 kt in H1 (H1 2017: 32.3 kt), due to concentrator idling and extraction from lower grade sections

 

Group production summary3

 

6m 2018

6m

2017

 

Q2 2018

Q1 2018

Q2 2017

Copper production1

kt

139.6

118.0

 

72.3

67.3

65.9

Bozshakol

kt

49.8

52.0

 

22.9

26.9

29.1

Aktogay

kt

60.5

33.0

 

34.1

26.4

21.1

East Region & Bozymchak

kt

29.3

33.0

 

15.3

14.0

15.7

Zinc in concentrate

kt

24.9

32.3

 

10.7

14.2

16.8

Gold production2

koz

89.8

93.0

 

39.9

49.9

50.4

Silver production2

koz

1,637

1,756

 

785

852

961

1 Payable metal in concentrate and copper cathode from Aktogay oxide ore.

2 Payable metal in concentrate.

3 See appendix for metal production by asset.

 

Andrew Southam, Chief Executive Officer, said: "In the first half of 2018 the Group delivered a strong operational performance, with the Aktogay sulphide concentrator achieving design throughput capacity for a sustained period. Higher throughput at Aktogay was the main driver of an 18% increase in copper production compared to the first half of 2017. The Group is on track to achieve its copper output target of 270-300 kt and by-product guidance in 2018."

 

 

 For further information please contact:

 

KAZ Minerals PLC

 

 

Chris Bucknall

Investor Relations, London

Tel: +44 20 7901 7882

Anna Mallere

Investor Relations, London

Tel: +44 20 7901 7814

Maksut Zhapabayev

Corporate Communications, Almaty

Tel: +7 727 244 03 53

Brunswick Group

 

 

Carole Cable, Charlie Pretzlik

Tel: +44 20 7404 5959

 

REGISTERED OFFICE

6th Floor, Cardinal Place, 100 Victoria Street, London SW1E 5JL, United Kingdom.

NOTES TO EDITORS

KAZ Minerals PLC ("KAZ Minerals" or "the Group") is a high growth copper company focused on large scale, low cost, open pit mining in Kazakhstan. It operates the Bozshakol and Aktogay open pit copper mines in the Pavlodar and East Region of Kazakhstan, three underground mines and associated concentrators in the East Region of Kazakhstan and the Bozymchak copper-gold mine in Kyrgyzstan. In 2017, total copper production was 259 kt with by-products of 58 kt of zinc in concentrate, 179 koz of gold and 3,506 koz of silver.

The Group's new operations at Bozshakol and Aktogay have delivered one of the highest growth rates in the industry and transformed KAZ Minerals into a company dominated by world class, open pit copper mines.

Bozshakol is a first quartile asset on the global cost curve with an annual ore processing capacity of 30 million tonnes and a remaining mine life of 39 years at an average copper grade of 0.35%. The mine and processing facilities will produce an average of 100 kt of copper cathode equivalent and 120 koz of gold in concentrate per year over the first 10 years of operations.

Aktogay is a large scale, open pit mine similar to Bozshakol, with a remaining mine life of 28 years at an average copper grade of 0.36% (oxide) and 0.33% (sulphide). Aktogay commenced production of copper cathode from oxide ore in December 2015 and copper in concentrate from sulphide ore in February 2017. The operating sulphide concentrator has an annual ore processing capacity of 25 million tonnes and the sulphide processing capacity will be doubled to 50 million tonnes with the addition of a second concentrator by the end of 2021. Aktogay is competitively positioned on the global cost curve and will produce an average of 90 kt of copper per year from sulphide ore until 2021, increasing to 170 kt per year from 2022 to 2027, after the second concentrator commences operations. Copper production from oxide ore will be in the region of 20 kt per annum until 2025.

KAZ Minerals is listed on the London Stock Exchange, the Kazakhstan Stock Exchange and the Hong Kong Stock Exchange and employs around 13,000 people, principally in Kazakhstan.

This announcement contains inside information. 

 

BOZSHAKOL

 

 

 

6m 2018

6m

2017

 

Q2 2018

Q1 2018

Q2 2017

Ore extraction

kt

15,506

19,426

 

7,370

8,136

9,522

Sulphide

kt

11,270

9,033

 

5,389

5,881

4,778

Clay

kt

4,236

10,393

 

1,981

2,255

4,744

 

 

 

 

 

 

 

 

Ore processed

kt

13,430

11,690

 

6,756

6,674

6,630

 

 

 

 

 

 

 

 

Copper

 

 

 

 

 

 

 

Average copper grade processed

%

0.49

0.56

 

0.46

0.52

0.56

Copper recovery rate

%

79.5

83.0

 

77.4

81.4

82.4

Copper in concentrate

kt

52.1

54.4

 

23.9

28.2

30.4

Copper production1

kt

49.8

52.0

 

22.9

26.9

29.1

 

 

 

 

 

 

 

 

Gold

 

 

 

 

 

 

 

Average gold grade processed

g/t

0.26

0.31

 

0.23

0.29

0.29

Gold recovery rate

%

59.5

58.5

 

55.8

62.5

59.3

Gold in concentrate

koz

66.7

67.2

 

28.2

38.5

36.7

Gold production1

koz

62.3

62.9

 

26.3

36.0

34.4

 

 

 

 

 

 

 

 

Silver production1

koz

340

361

 

157

183

200

1 Payable metal in concentrate.

Ore extraction of 15,506 kt was 20% lower compared to the 19,426 kt mined in H1 2017, when higher volumes of clay ore were extracted to expose sulphide ore. Sulphide ore extraction increased by 25% over the same period to 11,270 kt (H1 2017: 9,033 kt) to support the higher processing volumes.

In Q2, ore extraction decreased by 9% to 7,370 kt (Q1 2018: 8,136 kt), in line with the reduced requirement of the main sulphide concentrator which underwent a planned shutdown for mill relining and other maintenance and as the stripping of clay ore reduced.

Ore processed increased by 15% to 13,430 kt in H1 2018 compared to 11,690 kt in the prior year comparative period, reflecting the ramp up of both the main sulphide concentrator and the clay plant.

Ore processing volumes in Q2 were in line with the previous quarter as higher throughput at the clay plant offset reduced throughput at the sulphide plant of 89% (Q1 2018: 95%), due to the mill relining. The clay plant ramped up successfully to achieve 95% of design throughput capacity over the quarter (Q1 2018: 65%) following an extended shutdown for maintenance and upgrades in Q1 2018.

The average grade of copper processed during H1 2018 reduced to 0.49% from 0.56% in H1 2017, in line with the mine plan. The expected average grade of sulphide ore to be processed in 2018 remains in the region of 0.44%, as previously guided, with the mining of certain lower grade sulphide zones planned for the second half of the year.

Copper production was 4% lower in H1 2018 compared to the prior year comparative period, mainly due to the expected reduction in processing grades. Copper production of 22.9 kt in Q2 2018 was 15% lower than the previous quarter (Q1 2018: 26.9 kt) due to the combination of a lower average copper grade, reduced throughput at the sulphide plant due to the planned mill relining and a lower overall recovery rate as a larger proportion of clay material was processed. 

 

Gold production in H1 of 62.3 koz was in line with the 62.9 koz produced in the prior year comparative period, as an increase in processing volumes offset a lower gold grade of 0.26 g/t (H1 2017: 0.31 g/t). Gold production in Q2 of 26.3 koz was 27% lower than the previous quarter due to a lower average grade processed and a reduction in the average gold recovery rate.

Silver production of 340 koz was 6% lower than H1 2017 with grades reducing from 1.58 g/t to 1.33 g/t.

A small quantity of molybdenum concentrate was produced during the quarter and samples were sent to potential customers for evaluation.

With copper production of 50 kt delivered in the first half of the year, Bozshakol is on track to achieve full year guidance of 95-105 kt, as higher throughput in the second half is expected to be offset by lower grades. Gold and silver production is on track to achieve guidance of 115-125 koz and c.500 koz respectively.

 

AKTOGAY

 

 

 

 

6m 2018

6m

2017

 

Q2 2018

Q1 2018

Q2 2017

Ore extraction

kt

19,125

13,022

 

10,651

8,474

7,003

Oxide

kt

8,835

8,297

 

4,476

4,359

4,084

Sulphide

kt

10,290

4,725

 

6,175

4,115

2,919

 

 

 

 

 

 

 

 

Oxide

 

 

 

 

 

 

 

Oxide ore to leach pads

kt

8,835

8,297

 

4,476

4,359

4,084

Grade

%

0.31

0.42

 

0.31

0.30

0.39

Copper cathode

kt

11.5

10.4

 

6.2

5.3

5.7

 

 

 

 

 

 

 

 

Sulphide

 

 

 

 

 

 

 

Sulphide ore processed

kt

9,585

4,574

 

5,526

4,059

2,937

Average grade processed

%

0.62

0.75

 

0.62

0.62

 0.72

Recovery rate

%

86.4

69.3

 

85.4

87.6

76.5

Copper in concentrate

kt

51.3

23.7

 

29.2

22.1

16.2

Copper production1

kt

49.0

22.6

 

27.9

21.1

15.4

 

 

 

 

 

 

 

 

Total copper production

kt

60.5

33.0

 

34.1

26.4

21.1

 

 

 

 

 

 

 

 

Gold production1, 2

koz

0.3

0.4

 

-

0.3

0.3

Silver production1, 2

koz

215

113

 

120

95

75

1 Payable metal in concentrate.

2 Minimal volume recovered from Aktogay material.

 

Ore extraction of 19,125 kt in H1 was 47% higher than in the first half of 2017 as additional sulphide ore was extracted to feed the ramp up of the concentrator. Oxide ore extraction was 6% higher than the prior year comparative period, with the leaching operations and SX/EW processing facilities operating at full capacity. Ore extraction also increased by 26% from Q1 to Q2 2018, as throughput at the sulphide concentrator rose.

The average copper grade processed in the sulphide concentrator reduced to 0.62% in H1 2018 from 0.75% in the prior year comparative period but remained significantly above the reserve grade of 0.33% due to the continued processing of supergene enriched ore. The sulphide copper grade was stable in Q2 compared to the previous quarter, at 0.62%.

Copper production from the sulphide plant in H1 2018 increased by 117% to 49.0 kt due to a 110% increase in processing volumes, supported by high grades and recoveries. The plant achieved a significant ramp up milestone in the quarter, sustaining 100% of design throughput for a month and averaging 89% of design throughput over Q2 (Q1 2018: 66%).

Copper cathode production from oxide ore of 11.5 kt in H1 2018 was 11% higher than the prior year comparative period as the SX/EW plant is now at full capacity. Cathode output increased to 6.2 kt in Q2 (Q1 2018: 5.3 kt) due to seasonally higher temperatures.

Total copper production in H1 2018 from Aktogay of 61 kt represents strong progress towards the full year guidance range of 110-130 kt. Higher average ore throughput levels at the sulphide concentrator in the second half of the year are expected to offset a reduction in average copper grade. 

 

EAST REGION & BOZYMCHAK

 

 

 

6m 2018

6m

2017

 

Q2 2018

Q1

2018

Q2 2017

Ore extraction

kt

 1,954

 1,973

 

995

959

1,012

 

 

 

 

 

 

 

 

Ore processed

kt

 1,886

1,965

 

952

934

962

 

 

 

 

 

 

 

 

Copper

 

 

 

 

 

 

 

Average grade processed

%

 1.84

1.97

 

 1.90

1.79

1.93

Orlovsky concentrator

%

 3.21

3.72

 

 3.25

 3.17

3.57

Nikolayevsky concentrator

%

 1.53

1.50

 

 1.67

 1.35

1.47

Belousovsky concentrator

%

 1.49

1.56

 

 1.49

 1.50

1.62

Bozymchak concentrator

%

 0.86

0.90

 

 0.86

 0.86

0.89

Average recovery rate

%

 89.1

90.2

 

 89.6

88.5

89.2

East Region

%

 89.1

 90.3

 

 89.8

88.3

89.3

Bozymchak

%

 89.0

 89.1

 

 88.1

89.9

88.6

Copper in concentrate

kt

 31.0

34.9

 

 16.3

14.7

16.6

Orlovsky concentrator

kt

 16.0

18.5

 

 8.1

7.9

8.7

Nikolayevsky concentrator

kt

 7.7

8.0

 

 4.9

2.8

3.6

Belousovsky concentrator

kt

 3.4

4.4

 

 1.3

2.1

2.3

Bozymchak concentrator

kt

 3.9

4.0

 

 2.0

1.9

2.0

Copper production1

kt

 29.3

33.0

 

15.3

14.0

15.7

East Region

kt

 25.6

 29.2

 

13.4

12.2

13.8

Bozymchak

kt

 3.7

 3.8

 

1.9

1.8

1.9

 

 

 

 

 

 

 

 

Zinc in concentrate

kt

 24.9

32.3

 

 10.7

14.2

16.8

Gold production1

koz

 27.2

29.7

 

 13.6

13.6

15.7

Silver production1

koz

1,082

1,282

 

508

574

686

1 Payable metal in concentrate.

Ore extraction volumes in the East Region and Bozymchak in H1 2018 were in line with the prior year comparative period. Processing volumes in H1 2018 were 4% below H1 2017 mainly due to the periodic idling of the Nikolayevsky concentrator, as ore was temporarily stockpiled to enable the concentrator to operate more efficiently with a higher throughput. In Q2, processing volumes were broadly consistent with the previous quarter at 952 kt (Q1 2018: 934 kt), as a second idling period originally planned for July was brought forward to June.

The average copper grade processed reduced from 1.97% in H1 2017 to 1.84% in H1 2018, mainly due to lower grades at Orlovsky. The copper grade improved to 1.90% in Q2 2018 from 1.79% reported in the previous quarter, due to higher grades processed at the Nikolayevsky concentrator.

Copper production reduced by 11% to 29.3 kt in H1 2018 compared to H1 2017, due to lower grades at Orlovsky and reduced processing volumes. Copper output increased in Q2 compared to the previous quarter, to 15.3 kt (Q1 2018: 14.0 kt), mainly reflecting the higher copper grade processed at Nikolayevsky. The Bozymchak mine in Kyrgyzstan continued to operate at its full design capacity and contributed 3.7 kt of copper production in H1 2018, in line with the prior year comparative period. With increased processing volumes expected in the second half of the year, the East Region and Bozymchak remains on track to achieve its full year copper production guidance of around 65 kt.

Gold production in the East Region and Bozymchak in H1 was 8% below the prior year comparative period mainly due to the 4% reduction in processing volumes and a reduction in the average gold grade processed of 4%. Gold production in Q2 of 13.6 koz was in line with Q1. 

 

EAST REGION & BOZYMCHAK (CONTINUED)

 

H1 gold production of 27.2 koz (H1 2017: 29.7 koz) represents good progress towards the full year guidance of 45-50 koz.

Silver production reduced by 16% in H1 2018 compared to H1 2017 driven by lower processing volumes, grades and recoveries. Silver production in Q2 was 11% lower than Q1 2018 as a 2% increase in processing volumes was more than offset by lower grades and recoveries. Silver production of 1,082 koz (H1 2017: 1,282 koz) is on track to achieve the full year guidance target of around 2,000 koz.

Zinc in concentrate output was 23% lower in H1 2018 compared to H1 2017 driven by a 5% reduction in the processing of zinc bearing ore at the East Region concentrators and 14% lower average zinc grades, at 2.63% (H1 2017: 3.07%). In Q2, ore processing volumes in the East Region were 2% higher than Q1 2018 but grades were 22% lower at 2.30%. Zinc grades in the East Region continue to be variable, in particular at Artemyevsky, where the zinc grade was limited to 0.25% in Q2 2018 as mining moves through the transition zone between ore bodies.

Higher grades and increased throughput at the Nikolayevsky concentrator in the second half of the year are expected to raise zinc in concentrate production and the Group remains on track to achieve the full year guidance of around 60 kt. 

 

APPENDIX - METAL PRODUCTION

 

 

 

6m 2018

6m

2017

 

Q2 2018

Q1

2018

Q2 2017

Copper production1

kt

139.6

118.0

 

72.3

67.3

65.9

Bozshakol

kt

49.8

52.0

 

22.9

26.9

29.1

Aktogay

kt

60.5

33.0

 

34.1

26.4

21.1

East Region

kt

25.6

29.2

 

13.4

12.2

 13.8

Bozymchak

kt

3.7

3.8

 

1.9

1.8

 1.9

Zinc in concentrate

kt

24.9

32.3

 

10.7

14.2

16.8

East Region

kt

24.9

32.3

 

10.7

14.2

16.8

Gold production2

koz

89.8

 93.0

 

39.9

49.9

50.4

Bozshakol

koz

62.3

 62.9

 

26.3

36.0

 34.4

Aktogay

koz

0.3

0.4

 

-

0.3

0.3

East Region

koz

7.1

 8.8

 

3.3

3.8

4.9

Bozymchak

koz

20.1

 20.9

 

10.3

9.8

10.8

Silver production2

koz

1,637

 1,756

 

785

852

961

Bozshakol

koz

340

 361

 

157

183

200

Aktogay

koz

215

 113

 

120

95

75

East Region

koz

963

 1,153

 

447

516

621

Bozymchak

koz

119

 129

 

61

58

65

1 Payable metal in concentrate and copper cathode from Aktogay oxide ore.

2 Payable metal in concentrate.

 

TOLL PROCESSING & FINISHED METALS

 

 

6m 2018

6m

2017

 

Q2 2018

Q1

2018

Q2 2017

Copper cathodes

kt

 51.6

 54.4

 

 26.0

25.6

 28.8

Bozshakol (toll processed)

kt

 5.6

 4.6

 

 2.9

2.7

 3.7

Aktogay sulphide (toll processed)

kt

 3.3

 4.1

 

 0.4

2.9

 3.6

Aktogay oxide

kt

 11.5

 10.4

 

 6.2

5.3

 5.7

East Region (toll processed)

kt

 27.4

 31.2

 

 14.8

12.6

 14.0

Bozymchak (toll processed)

kt

 3.8

 4.1

 

 1.7

2.1

 1.8

 

 

 

 

 

 

 

 

Gold bar produced (toll processed)

koz

 32.8

28.6

 

 16.8

16.0

13.6

Silver bar produced (toll processed)

koz

 1,367

1,370

 

 715

652

585

 

 

 

APPENDIX - EAST REGION & BOZYMCHAK

 

 

 

6m 2018

6m

2017

 

Q2 2018

Q1

2018

Q2 2017

Ore extraction

kt

 1,954

1,973

 

 995

959

1,012

Orlovsky

kt

 559

545

 

 280

279

270

Artemyevsky

kt

 608

645

 

 307

301

351

Irtyshsky

kt

 320

313

 

 162

158

156

Bozymchak

kt

 467

470

 

 246

221

235

Ore processed

kt

 1,886

1,965

 

 952

934

962

Orlovsky concentrator

kt

 559

546

 

 281

278

270

Nikolayevsky concentrator

kt

 563

594

 

 314

249

275

Belousovsky concentrator

kt

 259

317

 

 101

158

162

Bozymchak concentrator

kt

 505

508

 

 256

249

255

 

 

 

 

 

 

 

 

Zinc

 

 

 

 

 

 

 

Average grade processed

 %

 2.63

3.07

 

 2.30

2.95

3.27

Orlovsky concentrator

%

 3.75

3.88

 

 3.70

3.81

3.76

Nikolayevsky concentrator

 %

 0.93

2.11

 

 0.50

1.47

2.48

Belousovsky concentrator

%

 3.87

3.50

 

 4.04

3.77

3.80

Average recovery rate

%

 68.5

72.2

 

 66.6

70.1

72.7

Orlovsky concentrator

%

 67.7

70.9

 

 65.8

69.7

69.0

Nikolayevsky concentrator

%

 59.7

76.3

 

 47.0

65.2

80.6

Belousovsky concentrator

%

 74.8

70.2

 

 76.3

73.8

69.9

Zinc in concentrate

kt

 24.9

32.3

 

 10.7

14.2

16.8

Orlovsky concentrator

kt

 14.2

15.0

 

 6.8

7.4

7.0

Nikolayevsky concentrator

kt

 3.2

9.5

 

 0.8

2.4

5.5

Belousovsky concentrator

kt

 7.5

7.8

 

 3.1

4.4

4.3

 

 

 

 

 

 

 

 

Gold

 

 

 

 

 

 

 

Average grade processed

 g/t

 0.79

0.82

 

 0.78

0.80

0.87

East Region

 g/t

 0.52

0.53

 

 0.50

0.53

0.57

Bozymchak

 g/t

 1.54

1.66

 

 1.55

1.53

1.69

Average recovery rate

%

 60.5

60.8

 

 60.7

60.2

62.3

East Region

%

 32.9

 37.4

 

 31.8

34.0

40.1

Bozymchak

%

 85.7

 82.3

 

 85.9

85.5

83.1

Gold in concentrate

koz

 28.9

31.6

 

 14.4

14.5

16.7

East Region

koz

 7.5

9.3

 

 3.5

4.0

5.2

Bozymchak

koz

 21.4

22.3

 

 10.9

10.5

11.5

Gold production1

koz

 27.2

29.7

 

 13.6

13.6

15.7

East Region

koz

 7.1

8.8

 

 3.3

3.8

4.9

Bozymchak

koz

 20.1

20.9

 

 10.3

9.8

10.8

 

 

 

 

 

 

 

 

Silver

 

 

 

 

 

 

 

Average grade processed

g/t

 34.9

35.9

 

 34.3

35.5

40.3

East Region

 g/t

 43.9

44.4

 

 43.1

44.7

50.6

Bozymchak

 g/t

 10.3

11.5

 

 10.5

10.2

11.8

Average recovery rate

%

 56.1

62.2

 

 53.0

59.2

60.5

East Region

%

 54.2

60.9

 

 50.8

57.6

59.3

Bozymchak

%

 78.3

75.7

 

 77.9

78.7

75.0

Silver in concentrate

koz

 1,189

1,409

 

 558

631

754

East Region

koz

 1,058

1,267

 

 491

567

682

Bozymchak

koz

 131

142

 

 67

64

72

Silver production1

koz

 1,082

1,282

 

 508

574

686

East Region

koz

 963

1,153

 

 447

516

621

Bozymchak

koz

 119

129

 

 61

58

65

1 Payable metal in concentrate. 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact [email protected] or visit www.rns.com.
 
END
 
 